Office Engineer

Proposal Letting List
April 26, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I065(442) , BUTLER 005 . STPBHF-I065(425) , JEFFERSON
008 . ACAA54739-ATRP(001) , RUSSELL 009 . ACBRZ58490-ATRP(001) , PERRY
010 . ACBR58548-ATRP(001) , CRENSHAW 014 . ACBRZ58407-ATRP(001) , MORGAN
016 . ACOA58621-ATRP(001) , MARSHALL 020 . BR-0106(500) , BUTLER
**021 . BR-0182(502) , BALDWIN 022 . BR-8604(600) , MADISON
025 . HPP-A138(900) , TUSCALOOSA 030 . HRRR-2800(213) , ETOWAH
031 . HRRR-4200(218) , LIMESTONE 035 . NH-0001(576) , BARBOUR
036 . NH-0002(557) , COLBERT 037 . NH-0003(579) , LIMESTONE
038 . NH-0013(586) , FRANKLIN 039 . NH-0016(513) & NH-0059(512) , BALDWIN
040 . ACNH-0038(530) , JEFFERSON, etc. 041 . NH-0059(511) , BALDWIN
042 . NH-0074(530) , MARION 043 . NH-HSIP-0012(553) , CLARKE
044 . NH-HSIP-0035(525) , DEKALB, etc. 045 . SRTS-SR10(904) , JEFFERSON
046 . SRTS-SR13(909) , TALLADEGA 048 . STPAA-HSIP-0195(506) , WINSTON
050 . STPNU-0071(501) , JACKSON 052 . STPNU-HSIP-0014(531) , HALE
* 053 . STPNU-HSIP-022(517) , CHILTON 054 . STPNU-HSIP-0022(518) , COOSA
055 . STPNU-HSIP-0051(509) , BARBOUR 056 . STPNU-HSIP-0106(503) , BUTLER
057 . STPNU-HSIP-0159(500) , FAYETTE 060 . STPBH-7201(600) , JEFFERSON
063 . STPMN-CN13(204) , AUTAUGA 065 . STPNU-2537(201) , DEKALB
066 . STPNU-6712(200) , WINSTON 067 . STPNU-CN13(205) , LAUDERDALE
070 . STPMN-7812(602) , AUTAUGA 082 . 99-501-690-000-201 , MADISON
084 . 99-801-253-190-301 , DEKALB 200 . STPNU-2600(209) , ELMORE
*WITHDRAWN FROM THE LETTING
** ALL BIDS REJECTED

001 . IM-I065(442) BUTLER COUNTY

LENGTH: 7.13 MILES.

SHALL BE COMPLETED BY: November 22, 2013
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from the north end of the CR-41 underpass bridge to 0.6 mile south of the Lowndes County Line. Length 7.329 mi.

BRACKET ESTIMATE: $3,741,019 TO $4,572,356

VIEW ITEMS


005 . STPBHF-I065(425) JEFFERSON COUNTY

LENGTH: 1.08 MILES.

SHALL BE COMPLETED BY: August 1, 2014
COST OF PLANS: $19.00

for constructing the Interchange Lighting on I-65 at Walker Chapel Road (Exit 267) from MP 266.71 to MP 267.79 in Fultondale. Length 1.079 mi

BRACKET ESTIMATE: $974,543 TO $1,191,109

VIEW ITEMS


008 . ACAA54739-ATRP(001) RUSSELL COUNTY

LENGTH: 0.81 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe along Stadium Drive from 25th Street to 0.24 mile south of CR-61 (Summerville Road) in Phenix City. Length 0.814 mi.

BRACKET ESTIMATE: $206,639 TO $252,558

VIEW ITEMS


009 . ACBRZ58490-ATRP(001) PERRY COUNTY

LENGTH: 0.09 MILES.

WORKING DAYS: 80
COST OF PLANS: $ 7.00

for constructing the Bridge Replacement (Precast) and Approaches over Rice Creek on CR-4 northeast of Hamburg. Length 0.090 mi.

BRACKET ESTIMATE: $362,298 TO $442,809

VIEW ITEMS


010 . ACBR58550-ATRP(001) & ACBR58548-ATRP(001) CRENSHAW COUNTY

LENGTH: 0.23 MILES.

WORKING DAYS: 100
COST OF PLANS: $10.00

for constructing the Bridge Replacement (Precast) and Approaches over Sweetwater and Little Patsaliga Creeks on CR-50 east of Honoraville. Length 0.253 mi.

BRACKET ESTIMATE: $1,103,733 TO $1,349,007

VIEW ITEMS


014 . ACBRZ58407-ATRP(001) MORGAN COUNTY

LENGTH: 0.44 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $11.00

for constructing the Bridge Replacement and Approaches on CR-1137 (Wilhite Road) over Flint Creek north of the Cullman County Line. Length 0.150

BRACKET ESTIMATE: $800,886 TO $978,861

VIEW ITEMS


016 . ACOA58621-ATRP(001) MARSHALL COUNTY

LENGTH: 1.20 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-64 (North Main Street) from SR-69 to SR-53 (US-231) in Arab. Length 1.200 mi.

BRACKET ESTIMATE: $321,864 TO $393,389

VIEW ITEMS


020 . BR-0106(500) BUTLER COUNTY

SHALL BE COMPLETED BY: January 17, 2014
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Bridge Replacement on SR-106 over Pigeon Creek at MP 22.977 east of CR-45. Length 0.265 mi.

BRACKET ESTIMATE: $1,815,321 TO $2,218,726

VIEW ITEMS


** 021 . BR-0182(502) BALDWIN COUNTY

WORKING DAYS: 235
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $44.00

for constructing the Grade, Drain, Base, Pave, Bridge (Precast) and Seawall Replacement on SR-182 over Little Lagoon Pass (Lee Calloway Bridge) in Gulf Shores. Length 0.378 mi.

BRACKET ESTIMATE: $4,582,506 TO $5,600,841

**ALL BIDS REJECTED**

022 . BR-8604(600) MADISON COUNTY

LENGTH: 0.17 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $10.00

for constructing the Bridge Replacement (Precast) and Approaches on Blake Bottom Road over Indian Creek near Huntsville. Length 0.167 mi.

BRACKET ESTIMATE: $1,142,184 TO $1,396,003

VIEW ITEMS


025 . HPP-A138(900) TUSCALOOSA COUNTY

LENGTH: 0.77 MILES.

WORKING DAYS: 90
COST OF PLANS: $ 6.00

for constructing the Pedestrian Improvements at various locations in the city of Northport. Length 0.773 mi.

BRACKET ESTIMATE: $221,753 TO $271,031

VIEW ITEMS


030 . HRRR-2800(213) ETOWAH COUNTY

LENGTH: 0.80 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing, Guardrail, and Traffic Stripe on Egypt Mountain Road (CR-120) from Littleton Road to the intersection of Williamsburg Road northwest of Attalla. Length 0.804 mi.

BRACKET ESTIMATE: $266,715 TO $325,986

VIEW ITEMS


031 . HRRR-4200(218) LIMESTONE COUNTY

LENGTH: 0.51 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Safety Improvements on Holt Road (CR-91) from the junction of Bain Road (CR-90) to the junction of Wales Street. Length 0.510 mi.

BRACKET ESTIMATE: $199,725 TO $244,108

VIEW ITEMS


035 . NH-0001(576) BARBOUR COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-1 (US-431) from the pavement joint just north of CR-36 to the pavement joint south of SR-131 in Eufaula. Length 6.361 mi.

BRACKET ESTIMATE: $2,100,708 TO $2,567,532

VIEW ITEMS


036 . NH-0002(557) COLBERT COUNTY

LENGTH: 2.43 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from the Mississippi State Line to near CR-1 , Riverton Rose Trail (MP 2.434). Length 2.433 mi.

BRACKET ESTIMATE: $1,640,022 TO $2,004,471

VIEW ITEMS


037 . NH-0003(579) LIMESTONE COUNTY

LENGTH: 4.24 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-3 (US-31) from MP 367.000 at Pitts Blvd to just north of SR-2 (US-72) (MP 371.32) in Athens. Length 4.241 mi.

BRACKET ESTIMATE: $1,522,972 TO $1,861,410

VIEW ITEMS


038 . NH-0013(586) FRANKLIN COUNTY

LENGTH: 2.23 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 from Sand Pitt Road (MP 285.00) to the intersection of SR-17 (US-43) (MP 287.08) Andrew Jackson Highway near Spruce Pine. Length 2.230 mi.

BRACKET ESTIMATE: $1,902,779 TO $2,325,618

VIEW ITEMS


039 . NH-0016(513) & NH-0059(512) BALDWIN COUNTY

LENGTH: 2.61 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-16 (US-90) from the intersection of SR-16 (US-90) West and SR-59 North (MP 54.320) to 0.05 miles south of CR-55 (MP 55.811) in Loxley and on SR-59 from the intersection of SR-59 North and SR-16 (US-90) West (MP 27.830) to 0.07 miles south of Flowerwood Rd (MP 28.945) in Loxley. Length 2.606 mi.

BRACKET ESTIMATE: $1,445,054 TO $1,766,177

VIEW ITEMS


040 . ACNH-0038(530) JEFFERSON & SHELBY COUNTIES

SHALL BE COMPLETED BY: November 27, 2013
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $131

for constructing the Intersection Improvements on SR-38 (US-280) from Hollywood Blvd to CR-1514 (Doug Baker Blvd) to include Widening for Turn Lanes, Traffic Stripe and Traffic Signals. Length 8.193 mi.

BRACKET ESTIMATE: $6,456,312 TO $7,891,048

VIEW ITEMS


041 . NH-0059(511) BALDWIN COUNTY

LENGTH: 6.22 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-59 from 0.4 miles south of I-10 in Loxley to the junction of SR-3 (US-31) and 0.2 miles north on SR-3. Length 6.148 mi.

BRACKET ESTIMATE: $2,367,789 TO $2,893,965

VIEW ITEMS


042 . NH-0074(530) MARION COUNTY

LENGTH: 7.27 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from MP 11.125 just east of the Hamilton City Limits to the junction of SR-241 (MP 19.560). Length 7.266 mi.

BRACKET ESTIMATE: $1,536,255 TO $1,877,645

VIEW ITEMS


043 . NH-HSIP-0012(553) CLARKE COUNTY

LENGTH: 4.18 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-12 (US-84) from west of CR-23 (MP 36.150) to west of CR-22 (MP 40.326) west of Grove Hill. Length 4.176 mi.

BRACKET ESTIMATE: $848,410 TO $1,036,945

VIEW ITEMS


044 . NH-HSIP-0035(525) DEKALB & JACKSON COUNTIES

LENGTH: 3.95 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-35 from north of Davis Avenue (MP 33.050) to CR-47 and CR-100 (MP 37.000). Length 3.949 mi.

BRACKET ESTIMATE: $2,376,035 TO $2,904,043

VIEW ITEMS


045 . SRTS-SR10(904) JEFFERSON COUNTY

WORKING DAYS: 50
COST OF PLANS: $10.00

for constructing the Sidewalks at Green Valley Elementary School in Hoover. Length 0.168 mi.

BRACKET ESTIMATE: $127,420 TO $155,735

VIEW ITEMS


046 . SRTS-SR13(909) TALLADEGA COUNTY

LENGTH: 0.25 MILES.

WORKING DAYS: 35
COST OF PLANS: $12.00

for constructing the Sidewalk Improvements, Signing, and Striping on Astrid Place, Johnson Street, and Norman C. Woods Street from South Street East to Coffee Street East in Talladega for the Alabama School for the Deaf and Blind. Length 0.246 mi.

BRACKET ESTIMATE: $84,978 TO $103,862

VIEW ITEMS


048 . STPAA-HSIP-0195(506) WINSTON COUNTY

LENGTH: 5.37 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-195 near Ashridge from MP 30.400 south of CR-2 to MP 35.720 north of SR-243 near Forkville. Length 5.373 mi.

BRACKET ESTIMATE: $1,441,457 TO $1,761,780

VIEW ITEMS


050 . STPNU-0071(501) JACKSON COUNTY

LENGTH: 14.38 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-71 from the intersection of SR-40 (MP 7.090) to the intersection of SR-117 (MP 21.470) through Rosalie. Length 14.379 mi.

BRACKET ESTIMATE: $3,761,225 TO $4,597,052

VIEW ITEMS


052 . STPNU-HSIP-0014(531) HALE COUNTY

LENGTH: 4.00 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Widening, Resurfacing, and Traffic Stripe on SR-14 from west of CR-119 (MP 64.990) to west of CR-136 (MP 68.988) in Greensboro. Length 3.998 mi.

BRACKET ESTIMATE: $1,442,942 TO $1,763,596

VIEW ITEMS


053 . STPNU-HSIP-0022(517) CHILTON COUNTY

LENGTH: 7.83 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing, Widening, and Traffic Stripe on SR-22 from the Dallas County Line to the SR-6 (US-82) Overpass in Maplesville. Length 7.805 mi.

BRACKET ESTIMATE: $3,015,055 TO $3,685,068

**WITHDRAWN FROM THE LETTING**
 

054 . STPNU-HSIP-0022(518) COOSA COUNTY

LENGTH: 8.16 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing, Safety Widening, and Traffic Stripe on SR-22 from the Coosa River to west of Proctor Creek through Kellys Crossroads. Length 8.157 mi.

BRACKET ESTIMATE: $1,615,511 TO $1,974,513

VIEW ITEMS


055 . STPNU-HSIP-0051(509) BARBOUR COUNTY

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $12.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-51 from the Dale County Line to the pavement joint north of Kelly Road. Length 8.128 mi.

BRACKET ESTIMATE: $2,276,282 TO $2,782,122

VIEW ITEMS


056 . STPNU-HSIP-0106(503) BUTLER COUNTY

LENGTH: 5.79 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, Widening, Full Depth Reclamation, and Traffic Stripe on SR-106 from the junction of CR-45 (MP 20.630) to the Crenshaw County Line (MP 26.688) east of Georgiana. Length 5.791 mi.

BRACKET ESTIMATE: $2,461,458 TO $3,008,449

VIEW ITEMS


057 . STPNU-HSIP-0159(500) FAYETTE COUNTY

LENGTH: 8.26 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 7.00

for constructing the Resurfacing, Widening, and Traffic Stripe on SR-159 from the Pickens County Line to the junction of SR-171. Length 12.255 mi.

BRACKET ESTIMATE: $3,268,139 TO $3,994,392

VIEW ITEMS


060 . STPBH-7201(600) JEFFERSON COUNTY

WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $81.00

for constructing Additional Lanes, (Grade, Drain, Base, and Pave) and Traffic Stripe on Coalburg Road from CR-107 to Corridor X. Length 2.008 mi.

BRACKET ESTIMATE: $6,452,560 TO $7,886,462

VIEW ITEMS


063 . STPMN-CN13(204) AUTAUGA COUNTY

LENGTH: 4.65 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Leveling, Resurfacing, and Traffic Stripe on CR-39 from the Elmore County Line to CR-85 north of Prattville. Length 4.654 mi.

BRACKET ESTIMATE: $769,140 TO $940,059

VIEW ITEMS


065 . STPNU-2537(201) DEKALB COUNTY

LENGTH: 3.13 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-127 from SR-176 to CR-271 south of Fort Payne. Length 3.134 mi.

BRACKET ESTIMATE: $620,640 TO $758,560

VIEW ITEMS


066 . STPNU-6712(200) WINSTON COUNTY

LENGTH: 4.63 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing, Guardrail Improvements, and Traffic Stripe on CR-7 from 33rd Street in Haleyville to the Franklin County Line. Length 4.681 mi.

BRACKET ESTIMATE: $575,288 TO $703,130

VIEW ITEMS


067 . STPNU-CN13(205) LAUDERDALE COUNTY

LENGTH: 7.10 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe at Various Sites as indicated in the plans on CR-8 from CR-10 to CR-5 (Site 1); CR-26 from CR-97 to the Limestone County Line (Site 2); and CR-58 from SR-207 to the Limestone County Line (Site 3). Length 7.099 mi.

BRACKET ESTIMATE: $568,343 TO $694,642

VIEW ITEMS


070 . STPMN-7812(602) AUTAUGA COUNTY

LENGTH: 1.37 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-75 South (McQueen Smith Road) from CR-2 (East Main Street) to SR-6 (US-82) in Prattville. Length 1.371 mi.

BRACKET ESTIMATE: $389,930 TO $476,581

VIEW ITEMS


082 . 99-501-690-000-201 MADISON COUNTY

LENGTH: 0.49 MILES.

WORKING DAYS: 120
COST OF PLANS: $19.00

for the Maintenance Bridge Painting on various routes in Madison County as indicated by the plans. Length 0.493 mi.

BRACKET ESTIMATE: $725,446 TO $886,656

VIEW ITEMS


084 . 99-801-253-190-301 DEKALB COUNTY

CALENDAR DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing of Park Roads and the Addition of a Paved Drive and Handicapped Pad in Desoto State Park.

BRACKET ESTIMATE: $138,576 TO $169,370

VIEW ITEMS


200 . STPNU-2600(209) ELMORE COUNTY

LENGTH: 3.01 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing and Traffic Stripe on Rock Springs Drive (CR-75) from Rifle Range Road to Redland Road east of Ware. Length 3.008 mi.

BRACKET ESTIMATE: $318,392 TO $389,146

VIEW ITEMS