COUNTY: COVINGTON
WORKING DAYS: 30
MBE/DBE CONTRACT OBLIGATION: 3 %
for constructing the Widening, Leveling, and Resurfacing on CR-73 from CR-47 to SR-12 (US-84) west of Babbie. Length 2.630 mi.The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $362,690 TO $443,288
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 210D021 | 1500 | CUYD | Borrow Excav (Lse Trb Meas)(A-4 Better) | |
| 212A000 | 278 | STA | Machine Grading Shoulders | |
| 405A000 | 930 | GAL | Tack Coat | |
| 407B000 | 3 | MILE | Joint Sealant For Hot Mix Asphalt Pave | |
| 424A341 | 2674 | TON | Superpave Wrg Surf 3/4" ESAL A/B | |
| 424A347 | 462 | TON | Superpave Wrg Surf Lev 3/4" ESAL A/B | |
| 424B647 | 540 | TON | Superpave Upr Bndr Wide 1" Esal A/B | |
| 600A000 | 1 | LS | Mobilization | |
| 652A100 | 6 | ACRE | Seeding | |
| 652C000 | 6 | ACRE | Mowing | |
| 656A010 | 6 | ACRE | Mulching | |
| 665J002 | 150 | LF | Silt Fence | |
| 665O001 | 150 | LF | Silt Fence Removal | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 18,325.00) | |
| 740B000 | 382 | SQFT | Construction Signs | |
| 740O000 | 1 | EACH | Pilot Car |