COUNTY: BIBB , CHILTON , FAYETTE , GREENE , LAMAR , PERRY, PICKENS & TUSCALOOSA
WORKING DAYS: 100
for the Maintenance Bridge Painting on various routes, Divisionwide as indicated in the plans.The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $427,390 TO $522,366
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 521B000 | 1 | LS | Coating Existing Bridge At MP 222.610 | |
| 521B001 | 1 | LS | Coating Existing Bridge At MP 71.519 | |
| 521B002 | 1 | LS | Coating Existing Bridge At MP 72.337 | |
| 521B003 | 1 | LS | Coating Existing Bridge At MP 60.643 | |
| 521B004 | 1 | LS | Coating Existing Bridge At MP 142.793 -1 | |
| 521B005 | 1 | LS | Coating Existing Bridge At MP 142.793 +1 | |
| 521B006 | 1 | LS | Coating Existing Bridge At MP 5.715 | |
| 521B007 | 1 | LS | Coating Existing Bridge At MP 1.812 | |
| 521B008 | 1 | LS | Coating Existing Bridge At MP 77.333 | |
| 521B009 | 1 | LS | Coating Existing Bridge At MP 37.550 | |
| 521B010 | 1 | LS | Coating Existing Bridge At MP 55.236 | |
| 521B011 | 1 | LS | Coating Existing Bridge At MP 138.886 | |
| 521B012 | 1 | LS | Coating Existing Bridge At MP 139.469 | |
| 521B013 | 1 | LS | Coating Existing Bridge At MP 140.135 | |
| 521B014 | 1 | LS | Coating Existing Bridge At MP 50.813 | |
| 521B015 | 1 | LS | Coating Existing Bridge At MP 208.606 | |
| 521B016 | 1 | LS | Coating Existing Bridge At MP 43.690 | |
| 521B017 | 1 | LS | Coating Existing Bridge At MP 12.244 -1 | |
| 521B018 | 1 | LS | Coating Existing Bridge At MP 12.244 +1 | |
| 521B019 | 1 | LS | Coating Existing Bridge At MP 12.705 -1 | |
| 521B020 | 1 | LS | Coating Existing Bridge At MP 12.705 +1 | |
| 521B021 | 1 | LS | Coating Existing Bridge At MP 0.817 | |
| 521B022 | 1 | LS | Coating Existing Bridge At MP 88.536 | |
| 521B023 | 1 | LS | Coating Existing Bridge At MP 81.401 | |
| 521B024 | 1 | LS | Coating Existing Bridge At MP 43.088 | |
| 521B025 | 1 | LS | Coating Existing Bridge At MP 67.793 | |
| 521B026 | 1 | LS | Coating Existing Bridge At MP 71.302 | |
| 521B027 | 1 | LS | Coating Existing Bridge At MP 3.556 | |
| 521B028 | 1 | LS | Coating Existing Bridge At MP 0.402 | |
| 521B029 | 1 | LS | Coating Existing Bridge At MP 4.906 | |
| 521B030 | 1 | LS | Coating Existing Bridge At MP 4.849 | |
| 521B031 | 1 | LS | Coating Existing Bridge At MP 228.760 | |
| 600A000 | 1 | LS | Mobilization | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 39,000.00) | |
| 740B000 | 688 | SQFT | Construction Signs | |
| 740D000 | 200 | EACH | Channelizing Drums | |
| 741C010 | 1 | EACH | Port Seq Arrow & Chevron Sign Unit | |
| 742A001 | 2 | EACH | Portable Changeable Message Sign Type 2 |