Office Engineer

Proposal Letting List
August 30, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I565(307) , MADISON, etc. 002 . IM-I059(371) , ETOWAH
003 . IM-NHF-I059(326) , TUSCALOOSA 006 . BRF-0006(541) , BIBB
007 . APD-0355(507) , FRANKLIN 015 . ACAA60255-ATRP(001) , MOBILE
019 . ACBRZ58315-ATRP(001) , CONECUH 025 . ACNU58472-ATRP(001) , SUMTER
026 . STPAA-0019(504) , FRANKLIN 027 . ACNU58686-ATRP(001) , BLOUNT
028 . ACNU59447-ATRP(001) , COVINGTON 029 . ACNU60454-ATRP(001) , MARION
*032 . ACOA58424-ATRP(001) , BALDWIN 033 . ACOA58553-ATRP(001) , PIKE
034 . ACOA59523-ATRP(001) , ESCAMBIA 035 . ACOA59551-ATRP(001) , CHAMBERS
037 . BR-0182(502) , BALDWIN 041 . NH-0021(544) , TALLADEGA
048 . STPAA-0003(527) , CHILTON 050 . EB-106(505) , CRENSHAW
052 . STPAA-0269(507) , WALKER 053 . NH-0012(556) , CLARKE
054 . EB-HSIP-0004(538) , TALLADEGA 055 . STPAA-HSIP-0022(520) , TALLAPOOSA, etc.
056 . STPAA-STPHV-8525(600) , MADISON 059 . STPOA-0017(546) , MARION
060 . STPOA-7449(600) , CALHOUN 064 . ST-049-016-010 , MOBILE
065 . 99-301-253-035-301 , DEKALB 066 . 99-504-690-000-201 , CLEBURNE, etc.
067 . 99-505-999-950-101 , BIBB, etc. 200 . BRZ-6300(220) , TUSCALOOSA

*WITHDRAWN FROM THE LETTING


001 . IM-I565(307) MADISON & LIMESTONE COUNTIES

LENGTH: 1.34 MILES.

SHALL BE COMPLETED BY: May 1, 2015
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $81.00

for the Construction of the New Interchange on I-565 at CR-3 (County Line Road) and Ramp Additions to the existing underpass (Grade, Drain, Base, Pave, Signals and Signing) in Madison. Length 1.344 mi.

BRACKET ESTIMATE: $11,584,691 TO $14,159,067

VIEW ITEMS


002 . IM-I059(371) ETOWAH COUNTY

LENGTH: 4.73 MILES.

SHALL BE COMPLETED BY: March 1, 2014
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Concrete Pavement Rehabilitation on I-59 North of US-431 from MP 183.280 to MP 184.000, from MP 194.300 to MP 194.600, from MP 196.560 to MP 196.620, and from MP 198.000 to MP 198.310. Length 1.390 mi.

BRACKET ESTIMATE: $803,062 TO $981,521

VIEW ITEMS


003 . IM-NHF-I059(326) TUSCALOOSA COUNTY

LENGTH: 3.99 MILES.

SHALL BE COMPLETED BY: August 1, 2016
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $145

for constructing the Bridge Replacement & Additional Lanes (Grade, Drain, Base, Pave, Bridges, Lighting, and Concrete Barrier Rail) on I-59 from 0.75 miles south of CR-85 (Buttermilk Road) to 0.30 miles south of CR-32 in Tuscaloosa. Length 4.079 mi.

BRACKET ESTIMATE: $37,498,974 TO $45,832,079

VIEW ITEMS


006 . BRF-0006(541) BIBB COUNTY

LENGTH: 0.48 MILES.

WORKING DAYS: 145
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $34.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge Culvert) on SR-6 (US-82) over Oakmulgee Creek north of the Bibb County Line. Length 0.483 mi.

BRACKET ESTIMATE: $1,962,377 TO $2,398,460

VIEW ITEMS


007 . APD-0355(507) FRANKLIN COUNTY

LENGTH: 7.98 MILES.

WORKING DAYS: 375
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $133

for constructing the Additional Lanes (Partial Grade & Drain, Base, Pave, and Culvert) on SR-24 (Corridor V) from Dempsey to 3 miles west of the Russellville City Limits. Length 8.941 mi.

BRACKET ESTIMATE: $15,288,849 TO $18,686,371

VIEW ITEMS


015 . ACAA60255-ATRP(001) MOBILE COUNTY

LENGTH: 0.71 MILES.

SHALL BE COMPLETED BY: July 31, 2014
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $24.00

for the Reconstruction Widening, Concrete Pavement Removal (Grade, Drain, Base, Pave) and Traffic Stripe on Broad Street from 15th Street to Approximately 700 feet south of I-10 in Mobile. Length 0.709 mi.

BRACKET ESTIMATE: $3,534,075 TO $4,319,425

VIEW ITEMS


019 . ACBRZ58315-ATRP(001) & ACBRZ58316-ATRP(001) CONECUH COUNTY

LENGTH: 0.07 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $10.00

for constructing the Bridge Replacements on CR-30 over Murder Creek & on CR-22 over Tributary to Cane Creek near Lyeffion. Length 0.070 mi.

BRACKET ESTIMATE: $435,531 TO $532,316

VIEW ITEMS


025 . ACNU58472-ATRP(001) SUMTER COUNTY

LENGTH: 0.05 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Bridge Replacement (Precast) (Grade, Drain, Base, and Pave) on Hopkins Street over Unnamed Tributary in Livingston. Length 0.056 mi.

BRACKET ESTIMATE: $226,846 TO $277,256

VIEW ITEMS


026 . STPAA-0019(504) & ACNU58685-ATRP(001) FRANKLIN COUNTY

LENGTH: 8.99 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-19 from the junction of SR-172 in Vina to the junction of SR-24 in Red Bay and Additional Turn Lanes at the Vina Industrial Park Entrance on SR-19. Length 8.518 mi.

BRACKET ESTIMATE: $1,739,760 TO $2,126,373

VIEW ITEMS


027 . ACNU58686-ATRP(001) BLOUNT COUNTY

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Resurfacing, Traffic Stripe, Guardrail Installation, and Drainage Improvements on CR-27 from the St Clair County Line to the junction of CR-29 north of Highland Lake. Length 9.222 mi.

BRACKET ESTIMATE: $1,573,259 TO $1,922,872

VIEW ITEMS


028 . ACNU59447-ATRP(001) COVINGTON COUNTY

LENGTH: 2.63 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Leveling, and Resurfacing on CR-73 from CR-47 to SR-12 (US-84) west of Babbie. Length 2.630 mi.

BRACKET ESTIMATE: $362,690 TO $443,288

VIEW ITEMS


029 . ACNU60454-ATRP(001) & STPNU-4700(211) MARION COUNTY

LENGTH: 9.01 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-20 from CR-25 to CR-29 north of Hamilton & on CR-46 from SR-129 to SR-233 north of Brilliant. Length 9.010 mi.

BRACKET ESTIMATE: $1,815,186 TO $2,218,560

VIEW ITEMS


032 . ACOA58424-ATRP(001) BALDWIN COUNTY

LENGTH: 0.57 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Storm Drainage Repairs on Church Street from Fels Avenue to Morphy Avenue in Fairhope. Length 0.057 mi.

BRACKET ESTIMATE: $112,613 TO $137,638

**WITHDRAWN FROM THE LETTING**
 

033 . ACOA58553-ATRP(001) , ACNU58563-ATRP(001) & ACNU58561-ATRP(001) PIKE COUNTY

LENGTH: 15.22 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Widening, Resurfacing, Guardrail Installation, and Traffic Stripe on CR-5513 from CR-5516 to CR-5511; on CR-3316 from SR-167 to CR-3310 in Brundidge; & on CR-4404 from SR-93 to SR-130. Length 15.220 mi.

BRACKET ESTIMATE: $3,288,541 TO $4,019,328

VIEW ITEMS


034 . ACOA59523-ATRP(001) ESCAMBIA COUNTY

LENGTH: 7.38 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-22 (Ridge Road) from the East Brewton City Limits to the junction of SR-15 (US-29). Length 7.376 mi.

BRACKET ESTIMATE: $1,148,589 TO $1,403,832

VIEW ITEMS


035 . ACOA59551-ATRP(001) , ACOA59552-ATRP(001) & ACOA59554-ATRP(001) CHAMBERS COUNTY

LENGTH: 8.39 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on Fob James Drive from Fairfax Bypass to SR-15 (US-29) in Valley; on 30th Street from SR-15 (US-29) to 12th Avenue in Shawmut; Widening , Resurfacing and Traffic Stripe on 12th Avenue from 30th Street to the end of the Road in Shawmut; and Widening, Resurfacing, and Traffic Stripe on CR-84 (Country Club Road) from SR-50 (Veterans Memorial Parkway) to B.I.N. 4423 in Lanett. Length 8.388 mi.

BRACKET ESTIMATE: $2,333,935 TO $2,852,587

VIEW ITEMS


037 . BR-0182(502) BALDWIN COUNTY

WORKING DAYS: 235
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $44.00

for constructing the Grade, Drain, Base, Pave, Bridge (Precast) and Seawall Replacement on SR-182 over Little Lagoon Pass (Lee Calloway Bridge) in Gulf Shores. Length 0.378 mi.

BRACKET ESTIMATE: $12,000,000 TO $16,000,000

VIEW ITEMS


041 . NH-0021(544) TALLADEGA COUNTY

LENGTH: 3.23 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from CR-511 to Country Club Drive in Sylacauga. Length 3.229 mi.

BRACKET ESTIMATE: $1,182,212 TO $1,444,926

VIEW ITEMS


048 . STPAA-0003(527) CHILTON COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for the Demolition and Structure Removal at Various Sites on SR-3 (US-31) at SR-22 and SR-145 in Clanton.

BRACKET ESTIMATE: $122,186 TO $149,338

VIEW ITEMS


050 . EB-0106(505) CRENSHAW COUNTY

LENGTH: 6.41 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-106 from the Butler County Line to the Patsaliga River Bridge. Length 6.409 mi.

BRACKET ESTIMATE: $862,466 TO $1,054,126

VIEW ITEMS


052 . STPAA-0269(507) WALKER COUNTY

LENGTH: 9.40 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, End Anchors, and Traffic Stripe on SR-269 from south of CR-22 (MP 32.120) to SR-69 (MP 41.524) south of Jasper. Length 9.404 mi.

BRACKET ESTIMATE: $1,910,648 TO $2,335,236

VIEW ITEMS


053 . NH-0012(556) & STPAA-0295(500) CLARKE COUNTY

LENGTH: 6.06 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $15.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-12 (US-84) from west of CR-22 to east of SR-295 in Grove Hill and on SR-295 from the south intersection of SR-13 (US-43) to the north intersection of SR-13 (US-43) in Grove Hill.Length 5.989 mi.

BRACKET ESTIMATE: $1,767,205 TO $2,159,917

VIEW ITEMS


054 . EB-HSIP-0004(538) TALLADEGA COUNTY

LENGTH: 5.05 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Micro-Milling, Safety Widening, Resurfacing, and Traffic Stripe on SR-4 (US-78) from SR-77 to the Talladega/Calhoun County Line. Length 5.047 mi.

BRACKET ESTIMATE: $1,095,493 TO $1,338,936

VIEW ITEMS


055 . STPAA-HSIP-0022(520) TALLAPOOSA & COOSA COUNTIES

LENGTH: 3.12 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-22 from the East end of the bridge over Elkahatchee Creek to SR-38 (US-280) in Alexander City. Length 3.116 mi.

BRACKET ESTIMATE: $952,807 TO $1,164,541

VIEW ITEMS


056 . STPAA-STPHV-8525(600) MADISON COUNTY

LENGTH: 0.62 MILES.

WORKING DAYS: 315
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $41.00

for constructing the Bridge & Culvert Replacement (Grade, Drain, Base, and Pave), Resurfacing, Traffic Stripe, and Signals on Old Madison Pike from Slaughter Road to Thornton Research Park in Huntsville. Length 0.615 mi.

BRACKET ESTIMATE: $5,166,641 TO $6,314,784

VIEW ITEMS


059 . STPOA-0017(546) MARION COUNTY

LENGTH: 1.14 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $41.00

for constructing the Additional Lanes (Grade, Drain, Base & Pave) on SR-17 (US-43) from the 5-Lane Section in Hackleburg to the 4-Lane Section south of Bear Creek. Length 1.141 mi.

BRACKET ESTIMATE: $3,943,193 TO $4,819,458

VIEW ITEMS


060 . STPOA-7449(600) CALHOUN COUNTY

LENGTH: 1.81 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Summerall Gate Road and Exchange Avenue in Anniston as indicated in the plans. Length 1.814 mi.

BRACKET ESTIMATE: $527,838 TO $645,135

VIEW ITEMS


064 . ST-049-016-010 MOBILE COUNTY

LENGTH: 0.22 MILES.

WORKING DAYS: 60
COST OF PLANS: $15.00

for constructing the Additional Turn Lanes on Addsco Road onto SR-16 (US-90/98) in Mobile. Length 0.222 mi.

BRACKET ESTIMATE: $252,895 TO $317,649

VIEW ITEMS


065 . 99-301-253-035-301 DEKALB COUNTY

LENGTH: 2.38 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-35 from the junction of CR-89 to the junction of SR-7 (US-11) in Fort Payne. Length 2.380 mi.

BRACKET ESTIMATE: $1,027,674 TO $1,256,045

VIEW ITEMS


066 . 99-504-690-000-201 CLEBURNE , COOSA , RUSSELL & TALLAPOOSA COUNTIES

WORKING DAYS: 110
COST OF PLANS: $ 2.00

for the Maintenance Bridge Painting on various routes as indicated in the plans.

BRACKET ESTIMATE: $523,778 TO $640,174

VIEW ITEMS


067 . 99-505-999-950-101 BIBB , CHILTON , FAYETTE , GREENE , LAMAR , PERRY & PICKENS COUNTIES

WORKING DAYS: 100
COST OF PLANS: $15.00

for the Maintenance Bridge Painting on various routes, Divisionwide as indicated in the plans.

BRACKET ESTIMATE: $427,390 TO $522,366

VIEW ITEMS


200 . BRZ-6300(220) TUSCALOOSA COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 6.00

for constructing the Bridge Replacement on CR-238 (Hargrove Road) over Lye Branch. Length 0.010 mi.

BRACKET ESTIMATE: $543,060 TO $663,740

VIEW ITEMS


Return To: Top of this Page