Office Engineer

Proposal Letting List
December 06, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


004 . IM-I020(345) , CALHOUN 008 . IM-I085(340) , LEE
009 . IM-I459(309) , JEFFERSON 010 . IM-IMD-I010(328) , MOBILE
023 . ACIM58377-ATRP(001) , JEFFERSON 027 . ACBR58398-ATRP(001) , MORGAN
* 032 . ACNU58635-ATRP(001) , CHEROKEE 034 . ACNU59449-ATRP(001) , COVINGTON
035 . ACNU59522-ATRP(001) , CONECUH 037 . ACNU59634-ATRP(001) , MACON
041 . ACNU58540-ATRP(001) , COVINGTON 042 . ACOA59467-ATRP(001) , HENRY
043 . ACOA59473-ATRP(001) , HOUSTON 046 . HCBPP-STPTE-2200(211) , CULLMAN
052 . NH-0002(558) , LAUDERDALE 055 . NH-0013(589) , CLARKE
056 . NH-0038(531) , SHELBY 057 . NH-0074(533) , CULLMAN
061 . SRTS-SR11(912) , ETOWAH 064 . SRTS-SR13(910) , GREENE
069 . STPAA-0049(504) , TALLAPOOSA 070 . STPAA-0065(500) , JACKSON
073 . STPAA-0148(503) , CLAY 074 . STPAA-0180(505) , BALDWIN
077 . STPAA-HSIP-0006(548) , MONTGOMERY 078 . STPAA-HSIP-0009(548) , ELMORE
079 . STPAA-HSIP-0021(545) , MONROE * 080 . STPAA-HSIP-0068(507) , CHEROKEE
081 . STPAA-HSIP-0170(500) , ELMORE 086 . STPNU-5723(201) , RUSSELL
087 . STPNU-HSIP-0022(517) , CHILTON 090 . ST-016-999-014 , COFFEE
091 . ST-037-999-011 , JEFFERSON 092 . ST-040-888-006 , LAWRENCE
093 . ST-051-110-004 , MONTGOMERY 095 . 99-509-022-182-400 , BALDWIN
096 . 99-609-491-010-300 , MOBILE 200 . DE-A204(936) , LOWNDES

* - WITHDRAWN FROM THE LETTING


004 . IM-I020(345) CALHOUN COUNTY

SHALL BE COMPLETED BY: November 28, 2014
COST OF PLANS: $ 9.00

for constructing the Interchange Lighting on I-20 at SR-21 (Exit 185) in Oxford. Length 0.852 mi.

BRACKET ESTIMATE: $728,723 TO $890,661

VIEW ITEMS


008 . IM-I085(340) LEE COUNTY

LENGTH: 5.65 MILES.

SHALL BE COMPLETED BY: October 17, 2014
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Pavement Rehabilitation (Planing, Resurfacing, Guardrail and Traffic Stripe) on I-85 from of SR-15 (US-29) (Exit 51, MP 51.072) to Bent Creek Road (MP 56.720) in Auburn. Length 5.648 mi.

BRACKET ESTIMATE: $7,469,293 TO $9,129,135

VIEW ITEMS


009 . IM-I459(309) JEFFERSON COUNTY

LENGTH: 2.87 MILES.

SHALL BE COMPLETED BY: August 15, 2014
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Pavement Rehabilitation on I-459 from north of SR-150 (MP 11.05) to south of the SR-3 (US-31) overpass (MP 13.92) in Hoover. Length 3.205 mi.

BRACKET ESTIMATE: $4,355,525 TO $5,323,420

VIEW ITEMS


010 . IM-IMD-I010(328) MOBILE COUNTY

SHALL BE COMPLETED BY: May 29, 2015
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $68.00

for constructing the Planing, Resurfacing, Guardrail, Bridge Jacking, Pedestrian Bridge Removal, Signals, and Bridge Rail Retrofit on I-10 from Halls Mill Creek to the west end of the George Wallace Tunnel. Length 8.676 mi.

BRACKET ESTIMATE: $13,210,288 TO $16,145,907

VIEW ITEMS


023 . ACIM58377-ATRP(001) JEFFERSON COUNTY

LENGTH: 2.00 MILES.

SHALL BE COMPLETED BY: July 1, 2015
COST OF PLANS: $24.00

for constructing the Interstate Lighting on I-59 from north of the Chalkville Road Exit (Exit 141) to north of the Deerfoot Parkway Exit (Exit 143) in Trussville. Length 3.389 mi.

BRACKET ESTIMATE: $1,530,104 TO $1,870,127

VIEW ITEMS


027 . ACBR58398-ATRP(001) MORGAN COUNTY

LENGTH: 0.24 MILES.

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $17.00

for constructing the Bridge Rehabilitation on the CR-24 (Gordon Drive) overpass in Decatur. Length 0.238 mi.

BRACKET ESTIMATE: $1,175,612 TO $1,436,860

VIEW ITEMS


032 . ACNU58635-ATRP(001) , ACNU58636-ATRP(001) & ACNU58634-ATRP(001) CHEROKEE COUNTY

LENGTH: 13.40 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Resurfacing, Traffic Stripe, and Guardrail Improvements on CR-15 from CR-259 North to the Georgia State Line; on CR-147 from CR-44 North to the intersection of SR-273; and on CR-29 from CR-12 North to the intersection of SR-25 (US-411). Length 13.398 mi.

BRACKET ESTIMATE: $1,734,510 TO $2,119,957

**WITHDRAWN FROM THE LETTING**
 

034 . ACNU59449-ATRP(001) & ACNU59450-ATRP(001) COVINGTON COUNTY

LENGTH: 8.36 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Surface Treatment, Leveling, and Resurfacing on CR-42 from the intersection of SR-12 (US-84) in Sanford to the intersection of CR-77 in Babbie & on CR-42 from the intersection of CR-77 in Babbie to the Opp City Limits. Length 8.361 mi.

BRACKET ESTIMATE: $1,095,928 TO $1,339,467

VIEW ITEMS


035 . ACNU59522-ATRP(001) CONECUH COUNTY

LENGTH: 1.73 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-251 (Wild Avenue) from SR-83 to SR-3 (US-84) in Evergreen. Length 1.730 mi.

BRACKET ESTIMATE: $411,029 TO $502,368

VIEW ITEMS


037 . ACNU59634-ATRP(001) MACON COUNTY

LENGTH: 7.10 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing, and Traffic Stripe on CR-2 from SR-15 (US-29) in Fort Davis to just east of Roba Road in Roba. Length 7.098 mi.

BRACKET ESTIMATE: $1,073,970 TO $1,312,630

VIEW ITEMS


041 . ACNU58540-ATRP(001) COVINGTON COUNTY

LENGTH: 0.99 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Surface Treatment, Leveling, and Resurfacing on CR-45 from east of the Andalusia City Limits to Head Farm Road. Length 0.992 mi.

BRACKET ESTIMATE: $1,073,970 TO $1,312,630

VIEW ITEMS


042 . ACOA59467-ATRP(001) HENRY COUNTY

LENGTH: 1.43 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on CR-241 (South Main Street) from 0.3 miles south of Woods/Solomon Road to King Street in Headland. Length 1.403 mi.

BRACKET ESTIMATE: $528,620 TO $646,092

VIEW ITEMS


043 . ACOA59473-ATRP(001) & ACNU59474-ATRP(001) HOUSTON COUNTY

LENGTH: 14.24 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Surface Treatment, Leveling, Resurfacing, and Traffic Stripe on CR-36 (Saunders Road, Forrester Road, and Glen Lawrence Road) from CR-203 in Dothan to Jordan Avenue in Cowarts & on CR-55 (Stateline Road) from SR-1 (US-231) just north of the Florida State Line to Seally Wells Road in Cottonwood. Length 14.244 mi.

BRACKET ESTIMATE: $3,230,434 TO $3,948,308

VIEW ITEMS


046 . HCBPP-STPTE-2200(211) CULLMAN COUNTY

LENGTH: 0.05 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 3.00

for constructing the Clarkson Covered Bridge Repair on CR-1043 in Clarkson. Length 0.047 mi.

BRACKET ESTIMATE: $714,874 TO $873,734

VIEW ITEMS


052 . NH-0002(558) LAUDERDALE COUNTY

LENGTH: 1.44 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from CR-30 (Indian Springs Road) to CR-316 (Harris Drive) in Florence. Length 1.444 mi.

BRACKET ESTIMATE: $1,052,764 TO $1,286,712

VIEW ITEMS


055 . NH-0013(589) CLARKE COUNTY

LENGTH: 3.91 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from 0.15 miles north of CR-29 to just north of SR-295 North in Grove Hill. Length 3.907 mi.

BRACKET ESTIMATE: $1,349,331 TO $1,649,182

VIEW ITEMS


056 . NH-0038(531) SHELBY COUNTY

LENGTH: 0.99 MILES.

WORKING DAYS: 310
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $55.00

for constructing the Intersection Improvements on SR-38 (US-280) at SR-119 and the Additional Lanes (Grade, Drain, Base, Pave, and Signals) on SR-119 from Corporate Drive to Brook Highland Parkway. Length 0.984 mi.

BRACKET ESTIMATE: $4,865,630 TO $5,946,882

VIEW ITEMS


057 . NH-0074(533) CULLMAN COUNTY

LENGTH: 3.36 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-74 (US-278) from MP 85.510 in the curb and gutter section to the junction of CR-1647 (MP 88.874). Length 3.364 mi.

BRACKET ESTIMATE: $1,085,320 TO $1,326,502

VIEW ITEMS


061 . SRTS-SR11(912) ETOWAH COUNTY

WORKING DAYS: 40
COST OF PLANS: $ 5.00

for constructing the Installation of Sidewalks, Signage, and Traffic Calming Devices at Eura Brown Elementary School in Gadsden.

BRACKET ESTIMATE: $53,583 TO $65,491

VIEW ITEMS


064 . SRTS-SR13(910) GREENE COUNTY

LENGTH: 0.48 MILES.

WORKING DAYS: 45
COST OF PLANS: $16.00

for constructing the Infrastructure Improvements (Sidewalk Improvements) along Elm Street, Oliver Avenue, and on SR-13 (US-43) in Eutaw. Length 0.300 mi.

BRACKET ESTIMATE: $110,971 TO $135,632

VIEW ITEMS


069 . STPAA-0049(504) TALLAPOOSA COUNTY

LENGTH: 4.62 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on SR-49 from the intersection of SR-22 in New Site to the Clay County Line. Length 4.619 mi.

BRACKET ESTIMATE: $353,798 TO $432,420

VIEW ITEMS


070 . STPAA-0065(500) & STPAA-HSIP-0146(500) JACKSON COUNTY

LENGTH: 13.47 MILES.

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on SR-65 from SR-146 at MP 17.543 to the Tennessee State Line and the Planing, Widening, Resurfacing and Traffic Stripe on SR-146 from SR-65 at MP 0.00 to just west of CR-138 at MP 3.47 southwest of Hytop. Length 13.467 mi.

BRACKET ESTIMATE: $2,050,937 TO $2,506,700

VIEW ITEMS


073 . STPAA-0148(503) CLAY COUNTY

LENGTH: 7.68 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on SR-148 from CR-7 to SR-9 west of Millerville. Length 7.678 mi.

BRACKET ESTIMATE: $541,664 TO $662,034

VIEW ITEMS


074 . STPAA-0180(505) BALDWIN COUNTY

LENGTH: 3.31 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on SR-180 from 0.28 miles west of the Foley Beach Express to east of SR-161 in Orange Beach. Length 3.305 mi.

BRACKET ESTIMATE: $1,327,843 TO $1,622,920

VIEW ITEMS


077 . STPAA-HSIP-0006(548) & 99-406-513-006-401 MONTGOMERY COUNTY

LENGTH: 16.37 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 5.00

for constructing the Widening, Planing, Pipe & Culvert Extensions, Resurfacing, Guardrail Replacement, and Traffic Striping on SR-6 (US-82) from east of the intersection of SR-53 (US-231) (MP 171.145) to the Bullock County Line (MP 179.335). Length 8.189 mi.

BRACKET ESTIMATE: $3,343,678 TO $4,086,717

VIEW ITEMS


078 . STPAA-HSIP-0009(548) & 99-406-261-009-202 ELMORE COUNTY

LENGTH: 8.26 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Widening, Planing, Resurfacing, and Traffic Stripe on SR-9 from the junction of SR-21 (US-231) to the intersection of CR-435 (Powell Loop Road) and Additional Left Turn Lane on SR-14 at the intersection of SR-9 (US-231) in Wetumpka. Length 8.267 mi.

BRACKET ESTIMATE: $2,960,335 TO $3,618,187

VIEW ITEMS


079 . STPAA-HSIP-0021(545) & STPAA-HSIP-0047(503) MONROE COUNTY

LENGTH: 8.59 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the 2 ft Widening, Resurfacing, and Traffic Stripe on SR-21/SR-47 from 0.058 miles south of the Beatrice City Limits to the junction of SR-47 and on SR-47 from the junction of SR-21 to 0.2 miles east of CR-9. Length 8.592 mi.

BRACKET ESTIMATE: $1,723,515 TO $2,106,519

VIEW ITEMS


080 . STPAA-HSIP-0068(507) CHEROKEE COUNTY

LENGTH: 7.02 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 9.00

for constructing the Widening, Resurfacing, and Traffic Stripe on SR-68 from the Dekalb County Line to the intersection of SR-25 (US-411) in Leesburg. Length 7.020 mi.

BRACKET ESTIMATE: $1,669,673 TO $2,040,712

**WITHDRAWN FROM THE LETTING**
 

081 . STPAA-HSIP-0170(500) & 99-406-261-170-301 ELMORE COUNTY

LENGTH: 11.82 MILES.

WORKING DAYS: 125
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $13.00

for constructing the Widening, Planing, and Resurfacing on SR-170 from the junction of SR-9 (US-231) (MP 0.000) to the junction of SR-63 (MP 11.680) & Additional Left Turn Lanes on SR-170 and SR-9 (US-231). Length 11.823 mi.

BRACKET ESTIMATE: $4,608,865 TO $5,633, 057

VIEW ITEMS


086 . STPNU-5723(201) RUSSELL COUNTY

LENGTH: 4.46 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Leveling, Resurfacing and Traffic Stripe on CR-41 (Boswell Road) from CR-28 (Sandfort Road) to SR-169 in Crawford. Length 4.459 mi.

BRACKET ESTIMATE: $873,546 TO $1,067,668

VIEW ITEMS


087 . STPNU-HSIP-0022(517) CHILTON COUNTY

LENGTH: 7.83 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing, Widening, and Traffic Stripe on SR-22 from the Dallas County Line to the SR-6 (US-82) Overpass in Maplesville. Length 7.805 mi.

BRACKET ESTIMATE: $3,410,513 TO $4,168,405

VIEW ITEMS


090 . ST-016-999-014 COFFEE COUNTY

LENGTH: 1.87 MILES.

WORKING DAYS: 125
COST OF PLANS: $26.00

for constructing the Pavement Rehabilitation on Tiger Drive from SR-166 to CR-364 (Taylor Mill Road) in Elba. Length 1.902 mi.

BRACKET ESTIMATE: $1,259,895 TO $1,539,871

VIEW ITEMS


091 . ST-037-999-011 JEFFERSON COUNTY

LENGTH: 0.59 MILES.

WORKING DAYS: 120
COST OF PLANS: $46.00

for constructing the Additional Lanes on SR-150 from 0.062 miles west of Grove Boulevard to 0.450 miles east of I-459 and the Grade, Drain, Widening, Signing, Striping, and Signals on the I-459 Northbound Ramps in Hoover. Length 0.591 mi.

BRACKET ESTIMATE: $3,436,995 TO $4,200,772

VIEW ITEMS


092 . ST-040-888-006 & ST-040-888-007 LAWRENCE COUNTY

LENGTH: 1.51 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 9.00

for constructing the Base, Pave, and Traffic Stripe on CR-434 from the north Right-of-Way of Norfolk Southern Railroad to the intersection of SR-20 (US-72) & Addition of Turn Lanes on SR-20 at CR-434 near Hillsboro. Length 1.514 mi.

BRACKET ESTIMATE: $461,125 TO $563,598

VIEW ITEMS


093 . ST-051-110-004 MONTGOMERY COUNTY

LENGTH: 0.33 MILES.

WORKING DAYS: 75
COST OF PLANS: $23.00

for constructing the Intersection Improvements (Grade, Drain, Base, Pave, Striping, and Signing) on SR-110 at CR-83 (Wallahatchie Road). Length 0.331 mi.

BRACKET ESTIMATE: $715,370 TO $874,341

VIEW ITEMS


095 . 99-509-022-182-400 BALDWIN COUNTY

CALENDAR DAYS: 365
COST OF PLANS: $ 2.00

for constructing the Maintenance Dredging at Little Lagoon Pass in Gulf Shores.

BRACKET ESTIMATE: $504,450 TO $616,550

VIEW ITEMS


096 . 99-609-491-010-300 MOBILE COUNTY

CALENDAR DAYS: 100
COST OF PLANS: $ 2.00

for constructing the Video Wall Upgrades at the Traffic Management Center and at the Southwest Region Construction Office in Mobile.

BRACKET ESTIMATE: $1,442,295 TO $1,762,805

VIEW ITEMS


200 . DE-A204(936) LOWNDES COUNTY

LENGTH: 2.04 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on Cemetery Road, Old Letohatchee Road, Old Swamp Road, Pecan Street, and West South Street in Hayneville. Length 2.037 mi.

BRACKET ESTIMATE: $204,291 TO $249,689

VIEW ITEMS