February 22, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


*001 . STPBHF-I065(425) , JEFFERSON 004 . STPOAF-7814(602) , AUTAUGA, etc.
006 . ACAA58299-ATRP(001) , MOBILE 007 . ACAA58619-ATRP(001) , MADISON
008 . ACBRZ58469-ATRP(001) , CHOCTAW 009 . ACNU58581-ATRP(001) , GENEVA
010 . ACOA58390-ATRP(001) , FRANKLIN 011 . ACOA58494-ATRP(001) , TUSCALOOSA
*012 . ACOA58504-ATRP(001) , TALLAPOOSA 014 . DE-A105(906) , MADISON
015 . NH-0053(567) & NH-0001(575) , MADISON 016 . NH-0002(555) , LAUDERDALE
017 . NH-HSIP-0006(552) , CHILTON 018 . NH-0008(569) , MARENGO
*019 . NH-HSIP-0035(525) , DEKALB, etc. 024 . SRTS-SR11(917) , PERRY
030 . STPAA-0003(578) , LIMESTONE 031 . STPAA-0007(533) , TUSCALOOSA
032 . STPAA-0017(548) , CHOCTAW 033 . STPAA-0017(550) , MARION
034 . STPAA-020(515) , LAWRENCE 035 . STPAA-0036(506) , MORGAN
036 . STPAA-0069(542) , MARSHALL 037 . STPAA-0091(504) , CULLMAN
*038 . STPAA-0269(507) , WALKER 039 . STPAA-HSIP-0004(537) , CLEBURNE
041 . STPAA-HSIP-0006(549) , BULLOCK 042 . STPAA-HSIP-0009(551) , CALHOUN
043 . STPAA-HSIP-0110(504) , BULLOCK 050 . STPNU-1205(202) , CHOCTAW
051 . STPNU-1600(226) , COFFEE 052 . STPNU-1908(201) , COOSA
053 . STPNU-1911(201) , COOSA 054 . STPNU-3609(200) , JACKSON
055 . STPNU-CN13(201) , COLBERT 060 . STPOA-2644(200) , ELMORE
075 . 99-401-690-000-301 , CULLMAN 076 . 99-401-690-000-302 , BLOUNT, etc.
077 . 99-803-595-290-301 , SHELBY 078 . 99-403-371-000-302 , JEFFERSON

*-WITHDRAWN FROM THE LETTING


001 . STPBHF-I065(425) JEFFERSON COUNTY

LENGTH: 1.08 MILES.

SHALL BE COMPLETED BY: June 19, 2014
COST OF PLANS: $14.00

for constructing the Interchange Lighting on I-65 at Walker Chapel Road (Exit 267) from MP 266.71 to MP 267.79 in Fultondale. Length 1.079 mi

BRACKET ESTIMATE: $974,543 TO $1,191,109

**WITHDRAWN FROM THE LETTING**

004 . STPOAF-7814(602) AUTAUGA & ELMORE COUNTIES

LENGTH: 1.59 MILES.

WORKING DAYS: 250
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $72.00

for constructing the Additional Lanes (Grade, Drainage, Pavement, Signal and Signing) on CR-29 (Old Farm Lane) from the Prattville City Limits to SR-14. Length 1.594 mi.

BRACKET ESTIMATE: $5,799,946 TO $7,088,823

VIEW ITEMS


006 . ACAA58299-ATRP(001) MOBILE COUNTY

SHALL BE COMPLETED BY: December 1, 2013
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $25.00

for constructing the Grade, Drain, Base, and Pave on Broad Street from Michigan Avenue to 15th Street west of I-10 in Mobile. Length 0.982 mi.

BRACKET ESTIMATE: $1,929,167 TO $2,357,871

VIEW ITEMS


007 . ACAA58619-ATRP(001) MADISON COUNTY

LENGTH: 1.95 MILES.

WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-17 (Old Madison Pike) from CR-14 (Hughes Road) to CR-19 (Slaughter Road) in Madison. Length 1.952 mi.

BRACKET ESTIMATE: $766,361 TO $936,663

VIEW ITEMS


008 . ACBRZ58469-ATRP(001) CHOCTAW COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 5.00

for constructing the Bridge (Culvert) Replacement on Henry Doherty Road (CR-119) over Tuckabum Creek near Lisman. Length 0.005 mi.

BRACKET ESTIMATE: $168,508 TO $205,954

VIEW ITEMS


009 . ACNU58581-ATRP(001) GENEVA COUNTY

LENGTH: 0.34 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on CR-45 (Commerce Street) from SR-167 easterly for approximately 0.343 miles in Hartford. Length 0.343 mi.

BRACKET ESTIMATE: $90,995 TO $111,216

VIEW ITEMS


010 . ACOA58390-ATRP(001) FRANKLIN COUNTY

LENGTH: 0.58 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Jackson Avenue from Tuscaloosa Street to Cotaco Street in Russellville. Length 0.576 mi.

BRACKET ESTIMATE: $267,246 TO $326,633

VIEW ITEMS


011 . ACOA58494-ATRP(001) TUSCALOOSA COUNTY

LENGTH: 0.56 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $21.00

for constructing the Widening, Resurfacing, and Realignment on Loop Rd. from Fairmont Dr. to Woodland Rd. in Tuscaloosa. Length 0.560 mi.

BRACKET ESTIMATE: $2,229,894 TO $2,725,426

VIEW ITEMS


012 . ACOA58504-ATRP(001) TALLAPOOSA COUNTY

LENGTH: 7.67 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Resurfacing, Grade, Drainage Improvements and Traffic Stripe at various sites on Coley Creek Road, Scott Road, and Sunny Level Cutoff as indicated in the plans. Length 7.668 mi.

BRACKET ESTIMATE: $1,657,754 TO $2,026,144

**WITHDRAWN FROM THE LETTING**

014 . DE-A105(906) MADISON COUNTY

LENGTH: 0.75 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $29.00

for constructing the Streetscape and Safety Improvements on CR-74 (Providence Main St) from SR-2 (US-72) to CR-28 (Old Monrovia Rd) in Huntsville. Length 0.750 mi.

BRACKET ESTIMATE: $773,882 TO $945,856

VIEW ITEMS


015 . NH-0001(575) & NH-0053(567) MADISON COUNTY

LENGTH: 10.52 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-53 (US-231) and SR-1 (US-431) at various sites in Huntsville as indicated in the plans. Length 5.256 mi.

BRACKET ESTIMATE: $3,477,914 TO $4,250,784

VIEW ITEMS


016 . NH-0002(555) LAUDERDALE COUNTY

LENGTH: 3.50 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (Florence Blvd) from MP 33.940 near Tune Ave to MP 37.620 at CR-20 (Indian Springs Dr) in Florence. Length 3.495 mi.

BRACKET ESTIMATE: $1,872,630 TO $2,288,770

VIEW ITEMS


017 . NH-HSIP-0006(552) CHILTON COUNTY

LENGTH: 8.78 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, Widening, and Traffic Stripe on SR-6 (US-82) from Mulberry Creek (MP 106.885) to the Autauga County Line (MP 115.660). Length 8.775 mi.

BRACKET ESTIMATE: $2,467,683 TO $3,016,056

VIEW ITEMS


018 . NH-0008(569) MARENGO COUNTY

LENGTH: 4.85 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from east of SR-13 (US-43) (MP 36.124) to the Hale County Line (MP 40.974). Length 4.849 mi.

BRACKET ESTIMATE: $1,020,447 TO $1,247,213

VIEW ITEMS


019 . NH-HSIP-0035(525) DEKALB & JACKSON COUNTIES

LENGTH: 3.95 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-35 from north of Davis Avenue (MP 33.050) to CR-47 and CR-100 (MP 37.000). Length 3.949 mi.

BRACKET ESTIMATE: $2,612,002 TO $3,192,447

**ALL BIDS REJECTED**

024 . SRTS-SR11(917) PERRY COUNTY

LENGTH: 0.27 MILES.

WORKING DAYS: 60
COST OF PLANS: $12.00

for constructing the Sidewalk Improvements along West Avenue in Uniontown. Length 0.221 mi.

BRACKET ESTIMATE: $105,000 TO $130,000

VIEW ITEMS


030 . STPAA-0003(578) LIMESTONE COUNTY

LENGTH: 4.61 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-3 (US-31) from Thomas Hammonds Rd (MP 362.387) to Pitts Blvd (MP 367.000) north of Oakland. Length 4.605 mi.

BRACKET ESTIMATE: $1,630,447 TO $1,992,768

VIEW ITEMS


031 . STPAA-0007(533) TUSCALOOSA COUNTY

LENGTH: 0.38 MILES.

WORKING DAYS: 30
COST OF PLANS: $16.00

for constructing the Planing, Widening, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the Mercedes Parking Entrance to CR-1141 (Blackbery Rd) in Vance. Length 0.381 mi.

BRACKET ESTIMATE: $532,668 TO $651,039

VIEW ITEMS


032 . STPAA-0017(548) CHOCTAW COUNTY

LENGTH: 7.32 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from north of SR-10 in Butler (MP 108.934) to the south end of the Tuckabum Creek Bridge (MP 116.257). Length 7.323 mi.

BRACKET ESTIMATE: $1,494,531 TO $1,826,649

VIEW ITEMS


033 . STPAA-0017(550) MARION COUNTY

LENGTH: 5.94 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, Traffic Stripe on SR-17 from near CR-1 (MP 280.568) to north of CR-476 (MP 286.283). Length 5.935 mi.

BRACKET ESTIMATE: $1,235,270 TO $1,509,774

VIEW ITEMS


034 . STPAA-0020(515) LAWRENCE COUNTY

LENGTH: 0.22 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 (US-72 ALT) from (MP 43.000) to SR-101 (MP 43.219) in Town Creek. Length 0.218 mi.

BRACKET ESTIMATE: $150,872 TO $184,399

VIEW ITEMS


035 . STPAA-0036(506) MORGAN COUNTY

LENGTH: 5.68 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-36 from Talucah Road (MP 38.710) to west of SR-53 (US-231) (MP 44.473) north of Valhermoso Springs. Length 5.681 mi.

BRACKET ESTIMATE: $1,446,981 TO $1,768,532

VIEW ITEMS


036 . STPAA-0069(542) MARSHALL COUNTY

LENGTH: 4.66 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-69 from 0.5 miles south of Scant City (MP 272.69) to 0.1 miles south of CR-14 (Warrenton Road) (MP 277.35). Length 4.660 mi.

BRACKET ESTIMATE: $2,612,002 TO $3,192,447

VIEW ITEMS


037 . STPAA-0091(504) CULLMAN COUNTY

LENGTH: 5.14 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-91 from Sullivan Creek (MP 9.190) to 0.2 miles west of I-65 (MP 14.330). Length 5.140

BRACKET ESTIMATE: $763,610 TO $933,301

VIEW ITEMS


038 . STPAA-0269(507) WALKER COUNTY

LENGTH: 9.40 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, End Anchors, and Traffic Stripe on SR-269 from south of CR-22 (MP 32.120) to SR-69 (MP 41.524) in Jasper. Length 9.404 mi.

BRACKET ESTIMATE: $1,759,907 TO $2,150,998

**ALL BIDS REJECTED**

039 . STPAA-HSIP-0004(537) CLEBURNE COUNTY

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-4 (US-78) from SR-46 to CR-61 in Heflin. Length 6.935 mi.

BRACKET ESTIMATE: $2,080,187 TO $2,542,451

VIEW ITEMS


041 . STPAA-HSIP-0006(549) BULLOCK COUNTY

WORKING DAYS: 135
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from the Montgomery County Line (MP 179.335) to Bowlin Creek (MP 193.578). Length 14.242 mi.

BRACKET ESTIMATE: $4,211,061 TO $5,146,853

VIEW ITEMS


042 . STPAA-HSIP-0009(551) CALHOUN COUNTY

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planning, Resurfacing, Widening, and Traffic Stripe on SR-9 from MP 238.243 to Cherokee County Line in Piedmont. Length 4.984 mi.

BRACKET ESTIMATE: $1,071,410 TO $1,309,501

VIEW ITEMS


043 . STPAA-HSIP-0110(504) BULLOCK COUNTY

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Widening on SR-110 from Montgomery County Line (MP 14.077) to CR-7 (MP 24.684). Length 10.606 mi.

BRACKET ESTIMATE: $2,757,986 TO $3,370,872

VIEW ITEMS


050 . STPNU-1205(202) CHOCTAW COUNTY

LENGTH: 4.43 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-32 from CR-45 to CR-9 east of Yantley. Length 4.430 mi.

BRACKET ESTIMATE: $797,441 TO $974,651

VIEW ITEMS


051 . STPNU-1600(226) & STPNU-1600(227) COFFEE COUNTY

LENGTH: 2.45 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-353 from CR-364 to SR-189 and on CR-106 from CR-109 to SR-53(US-231). Length 2.450 mi.

BRACKET ESTIMATE: $518,672 TO $633,932

VIEW ITEMS


052 . STPNU-1908(201) COOSA COUNTY

LENGTH: 4.80 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing, Traffic Stripe, and End Anchors on CR-55 from Chilton County Line (Lay Dam) to Clay Creek. Length 4.800 mi.

BRACKET ESTIMATE: $450,694 TO $550,848

VIEW ITEMS


053 . STPNU-1911(201) COOSA COUNTY

LENGTH: 2.10 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-86 from Harris Street to Tallapoosa County Line in Goodwater. Length 2.100 mi.

BRACKET ESTIMATE: $304,699 TO $372,409

VIEW ITEMS


054 . STPNU-3609(200) JACKSON COUNTY

LENGTH: 3.72 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-11 from the intersection of SR-2 (US-72) in Aspel to the intersection of SR-35 in Lim Rock. Length 3.719 mi.

BRACKET ESTIMATE: $443,671 TO $542,264

VIEW ITEMS


055 . STPNU-CN13(201) COLBERT COUNTY

LENGTH: 5.80 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe at Site 1 and Site 2 as indicated on Title Sheet near Barton. Length 5.803 mi.

BRACKET ESTIMATE: $288,517 TO $352,632

VIEW ITEMS


060 . STPOA-2644(200) ELMORE COUNTY

LENGTH: 4.63 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on Jackson/Old Ware Rd. (CR-103) from Peace Church Rd. North to Redland Rd. north of Old Bingham. Length 4.633 mi.

BRACKET ESTIMATE: $938,869 TO $1,147,507

VIEW ITEMS


075 . 99-401-690-000-301 CULLMAN , & MARSHALL COUNTIES

WORKING DAYS: 60
COST OF PLANS: $ 3.00

for the Litter Collection and Maintenance Roadside Mowing on Various State Routes in District Four as indicated in the Plans.

BRACKET ESTIMATE: $128,289 TO $156,797

VIEW ITEMS


076 . 99-401-690-000-302 BLOUNT & ST. CLAIR COUNTIES

WORKING DAYS: 90
COST OF PLANS: $ 3.00

for the Liter Collection and Maintenance Roadside Mowing on Various State Routes as indicated in the plans.

BRACKET ESTIMATE: $137,289 TO $167,797

VIEW ITEMS


077 . 99-803-595-290-301 SHELBY COUNTY

LENGTH: 6.06 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 5.00

for constructing the Widening, Resurfacing and Traffic Stripe at Various Sites in Oak Mountain State Park as indicated by the plans. Length 5.897 mi.

BRACKET ESTIMATE: $363,714 TO $444,539

VIEW ITEMS


078 . 99-403-371-000-302 JEFFERSON COUNTY

WORKING DAYS: 120
COST OF PLANS: $ 6.00

for the Maintenance Roadside Mowing on Various State Routes as indicated in the plans.

BRACKET ESTIMATE: $79,506 TO $97,174

VIEW ITEMS