Office Engineer

Proposal Letting List
January 25, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-010(319) , BALDWIN 002 . IM-NHF-I020(339) , CLEBURNE
003 . ITS-STPAAF-9901(001) , AUTAUGA, etc. 004 . IM-I065(405) , MOBILE
005 . BRF-0008(557) , DALLAS 011 . ACBR58483-ATRP(001) , LAMAR
012 . ACBRZ58388-ATPP(001) , CALHOUN 015 . ACBRZ58339-ATRP(0001) , BUTLER
016 . ACNU58473-ATRP(001) , CHILTON 017 . ACNU58615-ATRP(001) , CULLMAN
018 . ACNU58629-ATRP(001) , ST. CLAIR 019 . ACOA58684-ATRP(001) , LIMESTONE
022 . BR-0091(501) , CULLMAN 024 . BRZ-6500(209) , WASHINGTON
*027 . DE-A105(906) , MADISON 028 . DE-A198(927) , CLARKE
031 . ERPR-8930(900) , ESCAMBIA 032 . ERPR-8940(915) , TUSCALOOSA
035 . HRRR-CN13(200) , TALLADEGA 039 . HSIP-0216(501) , TUSCALOOSA
044 . NH-0002(556) , LAUDERDALE 045 . NH-0006(553) , TUSCALOOSA
046 . NH-0013(584) , CLARKE 047 . NH-0157(518) , CULLMAN
049 . NH-0053(568) , MADISON 050 . NH-HISP-0075(526) , JEFFERSON
055 . SRTS-SR12(912) , ETOWAH 058 . STPAA-0003(577) , SHELBY
059 . STPAA-0006(550) , BARBOUR 060 . STPAA-0015(523) , PIKE
061 . STPAA-0036(505) , MORGAN 062 . STPAA-0096(503) , LAMAR
063 . STPAA-0119(504) , SHELBY 064 . STPAA-HSIP-0119(505) , SHELBY
065 . STPAA-0119(506) , SHELBY 066 . STPAA-0172(502) , FRANKLIN, etc.
067 . STPAA-0183(503) , PERRY 068 . STPAA-0195(505) , WINSTON
070 . DE-AL79(912) , SHELBY 071 . STPAA-HSIP-0006(547) , BULLOCK
072 . STPAA-HSIP-007(535) , SUMTER 073 . STPAA-HSIP-0123(507) , GENEVA, etc.
074 . STPAA-HSIP-0134(506) , HENRY 077 . STPNU-3400(207) , HENRY
080 . STPOA-8816(601) , COLBERT 081 . STPOA-HSIP-0103(509) , HOUSTON, etc.
084 . STPPC-5706(202) , RUSSELL 087 . IAR-066-000-001 , WILCOX
201 . HSIP-0069(517) , TUSCALOOSA

*WITHDRAWN FROM THE LETTING

001 . IM-I010(319) BALDWIN COUNTY

LENGTH: 1.08 MILES.

SHALL BE COMPLETED BY: October 16, 2014
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $43.00

for constructing the Grade, Drain, Base, Pave, Signs and Bridges on I-10 Interchange at CR-68 with connector to Baldwin Beach Express. Length 1.084 mi.

BRACKET ESTIMATE: $12,669,544.00 TO $15,484,998.00

VIEW ITEMS


002 . IM-NHF-I020(339) CLEBURNE COUNTY

LENGTH: 4.29 MILES.

SHALL BE COMPLETED BY: May 1, 2015
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $110

for constructing the Additional Lanes (Grade, Drainage, Pavement, Lighting and Signing) on I-20 from SR-46 in Heflin to west of the Tallapoosa River. Length 4.290 mi.

BRACKET ESTIMATE: $26,775,000 TO $32,725,000

VIEW ITEMS


003 . ITS-STPAAF-9901(001) AUTAUGA , MONTGOMERY & ELMORE COUNTIES

SHALL BE COMPLETED BY: March 1, 2014
COST OF PLANS: $30.00

for constructing the Installation of Dynamic Message Signs on I-65 Corridor within the Montgomery Regional Area at Sites as indicated by the plan set.

BRACKET ESTIMATE: $2,130,000.00 TO $2,600,000.00

VIEW ITEMS


004 . IM-I065(405) MOBILE COUNTY

LENGTH: 6.35 MILES.

SHALL BE COMPLETED BY: July 1, 2014
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $36.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-65 from north of SR-158 (MP 13.648) in Saraland to north of SR-13 (US-43) (MP 19.988). Length 6.340 mi.

BRACKET ESTIMATE: $8,550,000 TO $10,450,000

VIEW ITEMS


005 . BRF-0008(557) & BRF-0008(564) DALLAS COUNTY

LENGTH: 1.26 MILES.

WORKING DAYS: 220
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $46.00

For constructing the Bridge and Culvert Replacement and Approaches on SR 8 (US 80) (WBR) at Mud Creek Relief west of Browns and Kendricks Branch Near Massillion. Length 1.256 mi.

BRACKET ESTIMATE: $2,401,875 TO $2,906,268

VIEW ITEMS


011 . ACBR58483-ATRP(001) LAMAR COUNTY

LENGTH: 0.15 MILES.

WORKING DAYS: 110
COST OF PLANS: $ 7.00

for constructing the Bridge Replacement (Precast) and Approaches on CR-49 at Hell's Creek northeast of Kingville. Length 0.150 mi.

BRACKET ESTIMATE: $835,000 TO $1,000,000

VIEW ITEMS


012 . ACBRZ58388-ATRP(001) CALHOUN COUNTY

LENGTH: 0.07 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 5.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on Possum Trot Road at an unknown branch in Asberry. Length 0.065 mi.

BRACKET ESTIMATE: $235,000 TO $290,000

VIEW ITEMS


015 . ACBRZ58339-ATRP(001) BUTLER COUNTY

LENGTH: 0.17 MILES.

WORKING DAYS: 80
COST OF PLANS: $ 5.00

for constructing the Bridge Replacement (Precast) and Approaches on CR-53 over Tributary of Patsaliga Creek South of Industry. Length 0.174 mi.

BRACKET ESTIMATE: $405,685 TO $490,878

VIEW ITEMS


016 . ACNU58473-ATRP(001) CHILTON COUNTY

LENGTH: 7.06 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-59 from the CSX Railroad west right of way limits in Verbena to CR-24. Length 7.061 mi.

BRACKET ESTIMATE: $1,380,000 TO $1,690,000

VIEW ITEMS


017 . ACNU58615-ATRP(001) CULLMAN COUNTY

LENGTH: 0.50 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-18 (Commercial Street) from SR-91 to CR-565 in Hanceville. Length 0.500 mi.

BRACKET ESTIMATE: $141,499 TO $172,944

VIEW ITEMS


018 . ACNU58629-ATRP(001) ST. CLAIR COUNTY

LENGTH: 4.98 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on CR-26 from west of Days Drive to SR-144 in Ragland. Length 4.980 mi.

BRACKET ESTIMATE: $1,145,000 TO $1,400,000

VIEW ITEMS


019 . ACOA58684-ATRP(001) LIMESTONE COUNTY

LENGTH: 5.04 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Lucas Ferry Road from SR-99 to Sanderfer Road and on Sanderfer Road from Lucas Ferry Road to SR-3 (US-31) in Athens. Length 5.039 mi.

BRACKET ESTIMATE: $860,000 TO $1,050,000

VIEW ITEMS


022 . BR-0091(501) CULLMAN COUNTY

LENGTH: 0.68 MILES.

WORKING DAYS: 200
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $42.00

for constructing the Bridge Replacement and Approaches on SR-91 at the Broglen River northeast of Hanceville. Length 0.707 mi.

BRACKET ESTIMATE: $4,430,000 TO $5,410,000

VIEW ITEMS


024 . BRZ-6500(209) WASHINGTON COUNTY

LENGTH: 0.03 MILES.

WORKING DAYS: 90
COST OF PLANS: $ 4.00

for constructing the Bridge Replacement (Precast) on CR-28 over Bull Hall Creek Northeast of Hobson. Length 0.025 mi.

BRACKET ESTIMATE: $337,937.00 TO $413,034.00

VIEW ITEMS


027 . DE-A105(906) MADISON COUNTY

LENGTH: 0.75 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $29.00

for constructing the Streetscape and Safety Improvements on CR-74 (Providence Main St) from SR-2 (US-72) to CR-28 (Old Monrovia Rd) in Huntsville. Length 0.750 mi.

BRACKET ESTIMATE: $773,882 TO $945,856

**WITHDRAWN FROM THE LETTING**

028 . DE-A198(927) CLARKE COUNTY

LENGTH: 0.92 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 5.00

for constructing the Lighting Improvements on US-43 in Thomasville. Length 0.920 mi.

BRACKET ESTIMATE: $340,000 TO $400,000

VIEW ITEMS


031 . ERPR-8930(900) ESCAMBIA COUNTY

LENGTH: 0.07 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Permanent Slope Repair on CR-27 (Robinson Road) approximately 0.9 miles northwest of Sardis Church Road northeast of Robinsonville. Length 0.056 mi.

BRACKET ESTIMATE: $75,500.00 TO $92,278.00

VIEW ITEMS


032 . ERPR-8940(915) TUSCALOOSA COUNTY

LENGTH: 0.22 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $12.00

for constructing the Slide Repair on SR-6 (US-82) 0.7 miles west of Box Creek west of Tuscaloosa. Length 0.217 mi.

BRACKET ESTIMATE: $1,390,000 TO $1,700,000

VIEW ITEMS


035 . HRRR-CN13(200) TALLADEGA COUNTY

LENGTH: 7.91 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Traffic Stripe, Markers, Legends, and Signs on CR-103 from CR-24 to SR-76 and on CR-26 from CR-511 to 10th Street north of Sylacauga. Length 7.910 mi.

BRACKET ESTIMATE: $105,686 TO $129,172

VIEW ITEMS


039 . HSIP-0216(501) TUSCALOOSA COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 30
COST OF PLANS: $25.00

for constructing the Intersection Improvements on SR-216 at CR-60 (Rockhouse Rd/Woodland Lake Rd) west of Lakeview. Length 0.283 mi.

BRACKET ESTIMATE: $391,026 TO $477,920

VIEW ITEMS


044 . NH-0002(556) LAUDERDALE COUNTY

LENGTH: 2.55 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-2 (US-72) from Meadow Ridge Lane to east of Wheeler Hills Road (MP 55.120) west of Rogersville. Length 2.553 mi.

BRACKET ESTIMATE: $1,230,000 TO $1,500,000

VIEW ITEMS


045 . NH-0006(553) TUSCALOOSA COUNTY

LENGTH: 4.36 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $12.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82)(MP 44.790) in Northport to Rice Mine Road (MP 49.146) in Tuscaloosa. Length 4.356 mi.

BRACKET ESTIMATE: $2,240,867 TO $2,711,449

VIEW ITEMS


046 . NH-0013(584) CLARKE COUNTY

LENGTH: 7.50 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) as indicated on plan set. Length 7.504 mi.

BRACKET ESTIMATE: $1,431,000.00 TO $1,750,000.00

VIEW ITEMS


047 . NH-0157(518) CULLMAN COUNTY

LENGTH: 4.16 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-157 from SR-69 (MP 0.633) in East Point to South of SR-3 (US-31) (MP 4.794). Length 4.161 mi.

BRACKET ESTIMATE: $1,256,590.00 TO $1,520,473.00

VIEW ITEMS


049 . NH-0053(568) MADISON COUNTY

LENGTH: 4.22 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) from the Tennessee River Bridge (MP 306.754) to just north of Meadowbrook Road (MP 311.038). Length 4.217 mi.

BRACKET ESTIMATE: $1,708,082.00 TO $2,087,656.00

VIEW ITEMS


050 . NH-HSIP-0075(526) JEFFERSON COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Widening, Resurfacing, Loop Detectors, and Traffic Stripe on SR-75 from Huffman Rd to South of Fox Hill Rd (MP 1.9030 to MP 4.930) south of Center Point. Length 3.00 mi.

BRACKET ESTIMATE: $1,437,995 TO $1,757,549

VIEW ITEMS


055 . SRTS-SR12(912) ETOWAH COUNTY

WORKING DAYS: 40
COST OF PLANS: $ 8.00

for constructing the Safety Improvements at W.E. Striplin and C.A. Donehoo Elementary Schools in the city of Gadsden as indicated in the plans.

BRACKET ESTIMATE: $68,609.00 TO $83,017.00

VIEW ITEMS


058 . STPAA-0003(577) SHELBY COUNTY

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, Loop Detectors, and Traffic Stripe on SR-3 (US-31) from the I-65 Bridge at Calera to I-65 in Alabaster (MP 245.665 to MP 252.997). Length 7.331 mi.

BRACKET ESTIMATE: $2,337,813 TO $2,857,327

VIEW ITEMS


059 . STPAA-0006(550) BARBOUR COUNTY

LENGTH: 8.14 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing, Planing, and Traffic Stripe on SR-6 (US-82) from the Bullock County Line to West of CR-79 (Poplar Springs Road). Length 8.143 mi.

BRACKET ESTIMATE: $1,474,010.00 TO $1,783,552.00

VIEW ITEMS


060 . STPAA-0015(523) PIKE COUNTY

LENGTH: 2.59 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-15 (US-29) from north of Madison Street to north of CR-7708 (Needmore Road) in Troy. Length 2.592 mi.

BRACKET ESTIMATE: $826,379.00 TO $1,010,018.00

VIEW ITEMS


061 . STPAA-0036(505) MORGAN COUNTY

LENGTH: 4.87 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-36 from CR-36 (New Cut Road) to SR-3 (US-31) in Hartselle. Length 4.874 mi.

BRACKET ESTIMATE: $1,100,000 TO $1,350,000

VIEW ITEMS


062 . STPAA-0096(503) LAMAR COUNTY

LENGTH: 3.87 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-96 from east of SR-17 (Old Kennedy "Y") (MP 15.875) to east of CR-2 (Gordo Road) (MP 18.740) in Kennedy. Length 2.864 mi.

BRACKET ESTIMATE: $1,050,000 TO $1,300,000

VIEW ITEMS


063 . STPAA-0119(504) SHELBY COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-119 from north of SR-25 (MP 0.040) to SR-3 (US-31) (MP 11.600) south of Alabaster. Length 11.170 mi.

BRACKET ESTIMATE: $2,810,694 TO $3,435,292

VIEW ITEMS


064 . STPAA-HSIP-0119(505) SHELBY COUNTY

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-119 from SR-38 (US-280) to the Shelby/Jefferson County Line (MP 28.000 to MP 31.750) south of Leeds. Length 3.750 mi.

BRACKET ESTIMATE: $1,142,211 TO $1,396,036

VIEW ITEMS


065 . STPAA-0119(506) SHELBY COUNTY

LENGTH: 9.50 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Guardrail on SR-119 from SR-3 (US-31) (MP 18.500) to SR-38 (US-280) (MP 28.000) in Pelham. Length 9.50 mi.

BRACKET ESTIMATE: $2,132,190 TO $2,606,010

VIEW ITEMS


066 . STPAA-0172(502) FRANKLIN & MARION COUNTIES

LENGTH: 4.25 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-172 from near Wilson West Road (MP 5.600) through Hodges to south of the Marion County Line (MP 9.420). Length 4.249 mi.

BRACKET ESTIMATE: $1,142,708 TO $1,396,643

VIEW ITEMS


067 . STPAA-0183(503) PERRY COUNTY

LENGTH: 7.32 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on SR-183 from Beaverdam Creek (MP 34.781) to the Chilton County Line (MP 42.105). Length 7.324 mi.

BRACKET ESTIMATE: $1,391,242 TO $1,700,407

VIEW ITEMS


068 . STPAA-0195(505) WINSTON COUNTY

LENGTH: 2.15 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-195 from south of Layne Hill Rd. (MP 40.140) to SR-13 (MP 42.179) in Haleyville. Length 2.146 mi.

BRACKET ESTIMATE: $531,518 TO $649,633

VIEW ITEMS


070 . DE-AL79(912) SHELBY COUNTY

CALENDAR DAYS: 75
COST OF PLANS: $ 6.00

for constructing the Interpretive Center Boardwalk in Ebenezer Swamp Wetlands on the University of Montevallo campus.

BRACKET ESTIMATE: $224,294.00 TO $274,137.00

VIEW ITEMS


071 . STPAA-HSIP-0006(547) BULLOCK COUNTY

WORKING DAYS: 110
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-6 (US-82) from the divided 4-lane east of CR-40 in Union Springs to the end of the divided 4-lane (MP 205.895). Length 6.144 mi.

BRACKET ESTIMATE: $4,100,000 TO $5,000,000

VIEW ITEMS


072 . STPAA-HSIP-0007(535) SUMTER COUNTY

LENGTH: 8.99 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the Mississippi State Line to north of Mallard Drive (MP 8.9990) in York. Length 8.989 mi.

BRACKET ESTIMATE: $1,758,163.00 TO $2,148,866.00

VIEW ITEMS


073 . STPAA-HSIP-0123(507) & STPAA-HSIP-0123(508) GENEVA & HOUSTON COUNTIES

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $20.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-123 from just north of CR-69 through Wicksburg to SR-12 (US-84). Length 9.051 mi.

BRACKET ESTIMATE: $2,207,414 TO $2,697,951

VIEW ITEMS


074 . STPAA-HSIP-0134(506) HENRY COUNTY

LENGTH: 8.39 MILES.

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-134 from CR-55 to the Houston County Line. Length 8.388 mi.

BRACKET ESTIMATE: $2,130,132.00 TO $2,603,495.00

VIEW ITEMS


077 . STPNU-3400(207) HENRY COUNTY

LENGTH: 3.54 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-16 from the Dale County Line to SR-173. Length 3.537 mi.

BRACKET ESTIMATE: $415,530 TO $507,870

VIEW ITEMS


080 . STPOA-8816(601) COLBERT COUNTY

LENGTH: 0.86 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing, Planing, Traffic Stripe, Pavement Markers, Markings and Legends on CR-24 from SR-13 (US-43) to CR-22 in Muscle Shoals. Length 0.862 mi.

BRACKET ESTIMATE: $304,693.00 TO $372,403.00

VIEW ITEMS


081 . STPOA-HSIP-0103(509) & STPAA-HSIP-0103(510) HOUSTON & GENEVA COUNTIES

LENGTH: 8.43 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $20.00

for constructing the Widening, Resurfacing, and Traffic Stripe on SR-103 from SR-52 (MP 9.014) to SR-123 (MP 17.441) north of Slocomb. Length 8.427 mi.

BRACKET ESTIMATE: $2,112,241 TO $2,581,628

VIEW ITEMS


084 . STPPC-5706(202) RUSSELL COUNTY

LENGTH: 3.86 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-39 (Nuckols Road) from the intersection of CR-18 (Oswichee Road) to the intersection of CR-24 (Bradley Road). Length 3.857 mi.

BRACKET ESTIMATE: $569,519.00 TO $696,079.00

VIEW ITEMS


087 . IAR-066-000-001 WILCOX COUNTY

LENGTH: 0.58 MILES.

SHALL BE COMPLETED BY: April 30, 2014
COST OF PLANS: $39.00

for constructing the Grade, Drain, Pavement, and Bridge on Industrial Access Road from 0.7 mi south of CR-27 to SR-5 0.5 mi north of CR-1 near Sunny South. Length 0.578 mi.

BRACKET ESTIMATE: $3,814,064 TO $4,661,634

VIEW ITEMS


201 . HSIP-0069(517) TUSCALOOSA COUNTY

LENGTH: 0.15 MILES.

WORKING DAYS: 35
COST OF PLANS: $15.00

for constructing the Intersection Improvements (Grade, Drainage, Pavement and Signal) on SR-69 at CR-65 (Bear Creek Road) at Taylorville. Length 0.146 mi.

BRACKET ESTIMATE: $465,000 TO $570,000

VIEW ITEMS


Return To: Top of this Page