Office Engineer

049 . STPNU-1803(201) , CONECUH

COUNTY: CONECUH

WORKING DAYS: 40

MBE/DBE CONTRACT OBLIGATION: 3 %

for constructing the Resurfacing and Traffic Stripe on CR-15 from approximately 0.53 miles north of the junction of George Lee Road to the intersection of SR-12 (US-84) in Belleville. Length 3.800 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $460,475 TO $562,803


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
212A000 201 STA Machine Grading Shoulders
405A000 2600 GAL Tack Coat
407B000 4 MILE Joint Sealant For Hot Mix Asphalt Pave
424A340 4000 TON Superpave Wrg Surf 1/2" ESAL A/B
424A346 600 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
600A000 1 LS Mobilization
650A000 1500 CUYD Topsoil
652A100 6 ACRE Seeding
656A010 6 ACRE Mulching
698A000 1 LS Construction Fuel (Maximum Bid Limited 24,000.00)
701A235 6 MILE Solid Yellow Cl 2 Ty A Traf Str
701A245 2 MILE Broken Yellow Cl 2 Ty A Traf Str
701C000 2 MILE Broken Temporary Traffic Stripe
701C001 6 MILE Solid Temporary Traffic Stripe
740B000 372 SQFT Construction Signs
740O000 1 EACH Pilot Car