COUNTY: BALDWIN
WORKING DAYS: 80
MBE/DBE CONTRACT OBLIGATION: 3 %
for constructing the Planing, Resurfacing, and Traffic Stripe on SR-42 (US-98) from SR-104 (MP 43.685) to CR-98 (MP 52.241) in Barnwell. Length 8.555 mi.The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.
BRACKET ESTIMATE: $2,317,798 TO $2,832,864
| ITEM CODE | QUANTITY | UNIT | ITEM DESCRIPTION | |
|---|---|---|---|---|
| 206C000 | 99 | SQYD | Removing Concrete Sidewalk | |
| 206D003 | 10 | LF | Removing Curb And Gutter | |
| 206D005 | 80 | LF | Removing Gutter | |
| 212A000 | 208 | STA | Machine Grading Shoulders | |
| 405A000 | 15644 | GAL | Tack Coat | |
| 407B000 | 36 | MILE | Joint Sealant For Hot Mix Asphalt Pave | |
| 408A052 | 141441 | SQYD | Plane Pvmt Appr 1.10" - 2.0" | |
| 410H000 | 1 | EACH | Material Remixing Device | |
| 424A360 | 24247 | TON | Superpave Wrg Surf 1/2" ESAL C/D | |
| 424B655 | 25 | TON | Superpave Upr Bndr Pat 1" Esal C/D | |
| 424B659 | 100 | TON | Superpave Upr Bndr Lev 1" Esal C/D | |
| 424B662 | 876 | TON | Superpave Upr Bndr Wide 1" Esal C/D | |
| 600A000 | 1 | LS | Mobilization | |
| 610D003 | 2681 | SQYD | Filter Blanket Geotextile | |
| 614A000 | 1 | CUYD | Slope Paving | |
| 618A000 | 139 | SQYD | Concrete Sidewalk, 4" Thick | |
| 650A000 | 5837 | CUYD | Topsoil | |
| 652A100 | 15 | ACRE | Seeding | |
| 652C000 | 17 | ACRE | Mowing | |
| 654A001 | 240 | SQYD | Solid Sodding (Bermuda) | |
| 656A010 | 15 | ACRE | Mulching | |
| 665A000 | 8 | ACRE | Temporary Seeding | |
| 665B001 | 16 | TON | Temporary Mulching | |
| 665G000 | 25 | EACH | Sand Bags | |
| 665J002 | 250 | LF | Silt Fence | |
| 665O001 | 250 | LF | Silt Fence Removal | |
| 665Q002 | 250 | LF | Wattle | |
| 666A001 | 8 | ACRE | Pest Control Treatment | |
| 674A000 | 500 | LF | Construction Safety Fence | |
| 680A001 | 1 | LS | Geometric Controls | |
| 698A000 | 1 | LS | Construction Fuel (Maximum Bid Limited 140,000.00) | |
| 701A227 | 19 | MILE | Solid White Cl 2 Ty A Traf Str 5" W | |
| 701A230 | 10 | MILE | Solid Yellow Cl 2 Ty A Traf Str 5" W | |
| 701A239 | 11 | MILE | Broken White Cl 2 Ty A Traf Str 5" W | |
| 701A244 | 6 | MILE | Broken Yellow Cl 2 Ty A Traf Str 5" W | |
| 701B207 | 10329 | LF | Dotted Cl 2 Ty A Traf Str 5" W | |
| 701C000 | 17 | MILE | Broken Temporary Traffic Stripe | |
| 701C001 | 29 | MILE | Solid Temporary Traffic Stripe | |
| 701G146 | 66 | LF | Solid White Cl W Ty A Traf Str 5" W | |
| 701G150 | 33 | LF | Broken Yellow Cl W Ty A Traf Str 5" W | |
| 701H002 | 66 | LF | Solid Traffic Stripe Removed Tape | |
| 701H007 | 33 | LF | Broken Traffic Stripe Removed Tape | |
| 703A002 | 14242 | SQFT | Traffic Control Marking, Class 2, Type A | |
| 703B002 | 1188 | SQFT | Traffic Control Legends, Class 2, Type A | |
| 703D001 | 9520 | SQFT | Temporary Traffic Control Markings | |
| 705A030 | 1009 | EACH | Pavement Markers, Class A-H, Type 2-C | |
| 705A031 | 853 | EACH | Pavement Markers, Class A-H, Type 1-A | |
| 705A032 | 534 | EACH | Pavement Markers, Class A-H, Type 1-B | |
| 705A037 | 746 | EACH | Pavement Markers, Class A-H, Type 2-D | |
| 705A038 | 288 | EACH | Pavement Markers, Class A-H, Type 2-E | |
| 730H001 | 22688 | LF | Loop Wire | |
| 740B000 | 1492 | SQFT | Construction Signs | |
| 740D000 | 250 | EACH | Channelizing Drums | |
| 740O000 | 1 | EACH | Pilot Car | |
| 741C010 | 2 | EACH | Port Seq Arrow & Chevron Sign Unit |