050 . STPNU-CN13(208) , TALLAPOOSA

COUNTY: TALLAPOOSA

WORKING DAYS: 30

MBE/DBE CONTRACT OBLIGATION: 3 %

for constructing the Resurfacing and Traffic Stripe on CR-17 (North Central Avenue) from the Alexander City Limits to the intersection of SR-63. Length 2.935 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $413,889 TO $505,865


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
401B108 34440 SQYD Bituminous Treatment G (W/Polymer)
405A000 1900 GAL Tack Coat
407B000 3 MILE Joint Sealant For Hot Mix Asphalt Pave
424A346 3750 TON Superpave Wrg Surf Lev 1/2" ESAL A/B
424B640 200 TON Superpave Upr Bndr Pat 1" Esal A/B
430B043 1280 TON Agg Surf (1" Down, Crusher Run)
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 9,000.00)
701A004 6 MILE Solid White Class 1 Type A Traf Stripe
701A012 6 MILE Solid Yellow Class 1 Type A Traffic St
701C001 12 MILE Solid Temporary Traffic Stripe
703A000 320 SQFT Traffic Control Marking, Class 1, Type A
705A037 390 EACH Pavement Markers, Class A-H, Type 2-D
740B000 222 SQFT Construction Signs
740O000 1 EACH Pilot Car