Enter search words here:

Office Engineer

032 . ER-8940(952) , BLOUNT

COUNTY: BLOUNT

WORKING DAYS: 30

for constructing the Permanent Restoration Work for the Drainage Area, Fencing, and Clearing of 6 acres on I-65 from 0.5 miles north of the CR-5 underpass (MP 289.800) to south of Mulberry Fork Black Warrior River (MP 290.500). Length 0.070 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $116,955 TO $142,945


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
201C000 1 LS Clearing (APPROX. 6 ACRES)
600A000 1 LS Mobilization
610D003 50 SQYD Filter Blanket Geotextile
635A000 5175 LF Woven Wire Fence
637A000 500 LF Fence Reset
652A100 6 ACRE Seeding
656A010 6 ACRE Mulching
665J002 300 LF Silt Fence
665O001 300 LF Silt Fence Removal
665Q002 300 LF Wattle
740B000 400 SQFT Construction Signs
740D000 200 EACH Channelizing Drums
741C010 2 EACH Port Seq Arrow & Chevron Sign Unit