May 31, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


003 . NHF-BRF-0074(504) , MARION 006 . STPHV-8507(600) , MADISON
015 . ACBRZ58406-ATRP(001) , MORGAN 016 . ACBRZ58640-ATRP(001) , ETOWAH
017 . ACNU58365-ATRP(001) , CALHOUN 018 . ACOA58349-ATRP(001) , MACON
019 . ACOA58499-ATRP(001) , TUSCALOOSA 020 . ACOA58504-ATRP(001) , TALLAPOOSA
021 . ACOA58551-ATRP(001) , PIKE 022 . ACOA58620-ATRP(001) , MARSHALL
023 . ACOA58773-ATRP(001) , MOBILE 025 . BR-0004(506) , ST. CLAIR
026 . BR-0022(503) , DALLAS *030 . CMAQ-9802(914) , SHELBY
032 . ER-8940(952) , BLOUNT 035 . HPP-STPNU-A146(900) , BIBB
040 . NH-0012(554) , DALE, etc. 042 . NH-HSIP-0013(585) , MARENGO
045 . SRTS-SR-13(912) , TUSCALOOSA 046 . SRTS-SR13(915) , COVINGTON
047 . SRTS-SR13(916) , GENEVA 050 . STPAA-0007(536) , ST. CLAIR
051 . STPAA-0025(537) , ST. CLAIR 052 . STPAA-0075(527) , DEKALB
053 . STPAA-8023(600) , LEE *055 . STPAA-HSIP-0006(548) , MONTGOMERY
056 . STPAA-HSIP-0009(550) , CLAY 057 . STPAA-HSIP-0048(503) , RANDOLPH
058 . STPAA-HSIP-0059(510) , MONROE 059 . STPAA-HSIP-0106(504) , BUTLER
*066 . STPMN-7780(600) , MONTGOMERY 070 . STPNU-2020(200) , COVINGTON
071 . STPNU-3300(211) , HALE *072 . STPNU-HSIP-0022(517) , CHILTON
076 . STPOA-8863(600) , LAUDERDALE 081 . ST-059-888-005 , SHELBY
084 . 99-403-371-000-401 , JEFFERSON 200 . STPOA-2816(201) , ETOWAH

*WITHDRAWN FROM THE LETTING

003 . NHF-BRF-0074(504) MARION COUNTY

LENGTH: 1.38 MILES.

WORKING DAYS: 330
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $59.00

for constructing the Grade, Drain, Base, Pave, and Bridge Replacement and Removal on SR-74 (US-278) at the Buttahatchee River in Hamilton. Length 1.382 mi.

BRACKET ESTIMATE: $8,787,528 TO $10,740,312

VIEW ITEMS


006 . STPHV-8507(600) MADISON COUNTY

LENGTH: 3.57 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $30.00

for constructing the Widening on CR-7 (Zierdt Road) from south of CR-11 (Martin Road) to north of Madison Boulevard (Clearing, Grubbing, Utilities, and New Security Fence) in Huntsville. Length 3.569 mi.

BRACKET ESTIMATE: $1,052,188 TO $1,286,008

VIEW ITEMS


015 . ACBRZ58406-ATRP(001) MORGAN COUNTY

LENGTH: 0.44 MILES.

WORKING DAYS: 225
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $18.00

for constructing the Bridge Replacement and Approaches on CR-41 (Danville Road) over the West Fork of Flint Creek northeast of Neel. Length 0.501 mi.

BRACKET ESTIMATE: $2,860,231 TO $3,495,838

VIEW ITEMS


016 . ACBRZ58640-ATRP(001) ETOWAH COUNTY

LENGTH: 0.13 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 8.00

for constructing the Bridge Replacement and Approaches on CR-87 (Mayo Road) over Bristow Creek west of the junction of SR-179 southwest of Boaz. Length 0.142 mi.

BRACKET ESTIMATE: $384,734 TO $470,230

VIEW ITEMS


017 . ACNU58365-ATRP(001) CALHOUN COUNTY

LENGTH: 5.94 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on Choccolocco Road (CR-55) from Scarborough Lane to the junction of SR-9. Length 5.939 mi.

BRACKET ESTIMATE: $1,422,247 TO $1,738,302

VIEW ITEMS


018 . ACOA58349-ATRP(001) MACON COUNTY

LENGTH: 1.24 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $14.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-30 (Franklin Road) from CR-95 (Motley Lane) to CR-126 (Old Montgomery Road) in Tuskegee. Length 1.241 mi.

BRACKET ESTIMATE: $460,848 TO $563,258

VIEW ITEMS


019 . ACOA58499-ATRP(001) TUSCALOOSA COUNTY

LENGTH: 1.86 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on Crescent Ridge Road (CR-45) from Alabama Avenue NE to Valley Hills Drive in Tuscaloosa. Length 1.855 mi.

BRACKET ESTIMATE: $761,887 TO $931,195

VIEW ITEMS


020 . ACOA58504-ATRP(001) TALLAPOOSA COUNTY

LENGTH: 7.67 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Resurfacing, Grade, Drainage Improvements, and Traffic Stripe on Coley Creek Road, Scott Road, and Sunny Level Cutoff as indicated in the plans in Alexander City. Length 6.951 mi.

BRACKET ESTIMATE: $1,516,441 TO $1,853,428

VIEW ITEMS


021 . ACOA58551-ATRP(001) PIKE COUNTY

LENGTH: 1.66 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $22.00

for constructing the Widening, Planing, Resurfacing, and Traffic Stripe on East Madison Street, Montgomery Street, and South Three Notch Street (SR-15/US-29) in Troy. Length 1.100 mi.

BRACKET ESTIMATE: $809,812 TO $989,770

VIEW ITEMS


022 . ACOA58620-ATRP(001) MARSHALL COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Resurfacing Improvements at various locations (Rose Road, George Wallace Drive, and Railroad Avenue) in Albertville Industrial Park. Length 2.326 mi.

BRACKET ESTIMATE: $700,545 TO $856,222

VIEW ITEMS


023 . ACOA58773-ATRP(001) MOBILE COUNTY

LENGTH: 0.96 MILES.

SHALL BE COMPLETED BY: May 1, 2014
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $59.00

for constructing the I-65, Frontage Road Relocation and the Roadway Improvements (Grade, Drain, Base, Pave, and Signals) on SR-158 in Saraland. Length 0.950 mi.

BRACKET ESTIMATE: $5,162,461 TO $6,309,675

VIEW ITEMS


025 . BR-0004(506) ST. CLAIR COUNTY

LENGTH: 0.27 MILES.

WORKING DAYS: 225
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $28.00

for constructing the Bridge Replacement and Approaches on SR-4 (US-78) over Wolf Creek northwest of Pell City. Length 0.274 mi.

BRACKET ESTIMATE: $1,367,129 TO $1,670,935

VIEW ITEMS


026 . BR-0022(503) DALLAS COUNTY

SHALL BE COMPLETED BY: May 1, 2014
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Grade, Drain, Base, Pave, and Bridge Replacement on SR-22 over Valley Creek in Selma. Length 0.146 mi.

BRACKET ESTIMATE: $2,022,246 TO $2,471,634

VIEW ITEMS


030 . CMAQ-9802(914) SHELBY COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Grade, Drain, Base, and Pave of Park & Ride Lot on Shelby West Parkway 0.75 miles north of CR-87 near the Shelby County Airport. Length 0.207 mi.

BRACKET ESTIMATE: $561,346 TO $686,089

*WITHDRAWN FROM THE LETTING*
 

032 . ER-8940(952) BLOUNT COUNTY

LENGTH: 0.70 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Permanent Restoration Work for the Drainage Area, Fencing, and Clearing of 6 acres on I-65 from 0.5 miles north of the CR-5 underpass (MP 289.800) to south of Mulberry Fork Black Warrior River (MP 290.500). Length 0.070 mi.

BRACKET ESTIMATE: $116,955 TO $142,945

VIEW ITEMS


035 . HPP-STPNU-A146(900) BIBB COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $29.00

for constructing the Intersection Improvements (Turn Lanes, Planing, Resurfacing, Traffic Signals and Traffic Stripe) on SR-7 (US-11) at the junction of SR-5 in Woodstock. Length 0.757 mi.

BRACKET ESTIMATE: $1,244,553 TO $1,521,121

VIEW ITEMS


040 . NH-0012(554) & NH-0012(555) DALE & HOUSTON COUNTIES

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $18.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-12 (US-84) from the Dale County Line to 0.35 miles east of SR-123 and from the pavement joint east of Armory Road to the Houston County Line in Daleville. Length 7.655 mi.

BRACKET ESTIMATE: $3,038,005 TO $3,713,117

VIEW ITEMS


042 . NH-HSIP-0013(585) MARENGO COUNTY

LENGTH: 5.49 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the Clark County Line (MP 96.823) to north of SR-10 (MP 102.365). Length 5.492 mi.

BRACKET ESTIMATE: $1,181,757 TO $1,444,370

VIEW ITEMS


045 . SRTS-SR13(912) TUSCALOOSA COUNTY

LENGTH: 0.54 MILES.

WORKING DAYS: 35
COST OF PLANS: $19.00

for constructing the Infrastructure Improvements (Sidewalks) along 26th Avenue, 28th Street, Mayfield Way, and 22nd Avenue in Northport. Length 0.484 mi.

BRACKET ESTIMATE: $103,252 TO $126,196

VIEW ITEMS


046 . SRTS-SR13(915) COVINGTON COUNTY

LENGTH: 0.59 MILES.

WORKING DAYS: 45
COST OF PLANS: $12.00

for constructing the Sidewalk Improvements on SR-9 (US-331) from Nix Avenue to Opp Elementary School in Opp. Length 0.592 mi.

BRACKET ESTIMATE: $110,462 TO $135,009

VIEW ITEMS


047 . SRTS-SR13(916) GENEVA COUNTY

WORKING DAYS: 45
COST OF PLANS: $16.00

for constructing the Sidewalk Improvements on North Broad Street from West Main Street (SR-52) to Johnson Street at Samson Elementary School as indicated in the plans in Samson. Length 0.608 mi.

BRACKET ESTIMATE: $123,277 TO $150,672

VIEW ITEMS


050 . STPAA-0007(536) ST. CLAIR COUNTY

LENGTH: 4.69 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from south of Steele at (MP 181.320) to the Etowah County Line (MP 186.010). Length 4.689 mi.

BRACKET ESTIMATE: $751,156 TO $918,080

VIEW ITEMS


051 . STPAA-0025(537) ST. CLAIR COUNTY

LENGTH: 3.97 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25 (US-411) from the Jefferson County Line (MP 170.360) in Leeds to Church Street (MP 174.330) in Moody. Length 3.969 mi.

BRACKET ESTIMATE: $1,326,073 TO $1,620,756

VIEW ITEMS


052 . STPAA-0075(527) DEKALB COUNTY

LENGTH: 1.84 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-75 from 0.3 miles south of CR-326 and CR-41 (MP 77.860) to 0.05 miles north of CR-76 (Barron Road) (MP 79.700) south of Fyffe. Length 1.840 mi.

BRACKET ESTIMATE: $1,110,456 TO $1,357,223

VIEW ITEMS


053 . STPAA-8023(600) LEE COUNTY

LENGTH: 1.62 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-246 from the intersection of CR-295 to the intersection of CR-298 in Smiths Station. Length 1.622 mi.

BRACKET ESTIMATE: $508,960 TO $622,062

VIEW ITEMS


055 . STPAA-HSIP-0006(548) MONTGOMERY COUNTY

LENGTH: 8.18 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, Widening, and Traffic Stripe on SR-6 (US-82) from east of SR-53 (US-231) (MP 171.145) to the Bullock County Line (MP 179.335). Length 8.189 mi.

BRACKET ESTIMATE: $3,236,849 TO $3,956,149

*WITHDRAWN FROM THE LETTING*

056 . STPAA-HSIP-0009(550) CLAY COUNTY

LENGTH: 7.35 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing, Widening, and Traffic Stripe on SR-9 from the South City Limits of Ashland to the south end of the Railroad Bridge at MP 188.260 in Lineville. Length 7.354 mi.

BRACKET ESTIMATE: $2,166,040 TO $2,647,383

VIEW ITEMS


057 . STPAA-HSIP-0048(503) RANDOLPH COUNTY

LENGTH: 9.37 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing, Widening, and Traffic Stripe on SR-48 from the City of Woodland (MP 24.947) to the Alabama/Georgia State Line. Length 9.374 mi.

BRACKET ESTIMATE: $3,509,175 TO $4,288,991

VIEW ITEMS


058 . STPAA-HSIP-0059(510) MONROE COUNTY

LENGTH: 12.98 MILES.

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Widening, Resurfacing, Guardrail Installation and Traffic Stripe on SR-59 from the north end of the Little River Bridge to the junction of SR-21 in Uriah. Length 12.962 mi.

BRACKET ESTIMATE: $1,967,679 TO $2,404,941

VIEW ITEMS


059 . STPAA-HSIP-0106(504) & 99-406-074-106-220 BUTLER COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Resurfacing, Widening, and Slope Repair on SR-106 from 0.5 miles east of CR-17 (MP 9.450) to the junction of SR-55 (MP 10.800) near Georgiana. Length 1.349 mi.

BRACKET ESTIMATE: $1,350,986 TO $1,651,205

VIEW ITEMS


066 . STPMN-7780(600) & IAR-051-000-005 MONTGOMERY COUNTY

LENGTH: 3.24 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $55.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Fiber Optic and Signals on W.L. Dickinson Drive from CSX Railroad to 0.23 miles south of SR-9 (US-231) including Industrial Access Improvements at Maxwell AFB (Gunter Annex) Cyber Commander. Length 1.886 mi.

BRACKET ESTIMATE: $2,484,723 TO $3,036,884

*WITHDRAWN FROM THE LETTING*

070 . STPNU-2020(200) COVINGTON COUNTY

LENGTH: 7.73 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-24 east of the Conecuh National Forest from the junction of SR-137 to the junction of SR-55. Length 7.729 mi.

BRACKET ESTIMATE: $781,531 TO $955,205

VIEW ITEMS


071 . STPNU-3300(211) HALE COUNTY

LENGTH: 7.92 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 4.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-2 from the Marengo County Line to the junction of SR-69. Length 7.920 mi.

BRACKET ESTIMATE: $1,312,090 TO $1,603,666

VIEW ITEMS


072 . STPNU-HSIP-0022(517) CHILTON COUNTY

LENGTH: 7.83 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $11.00

for constructing the Planing, Resurfacing, Widening, and Traffic Stripe on SR-22 from the Dallas County Line to the SR-6 (US-82) Overpass in Maplesville. Length 7.805 mi.

BRACKET ESTIMATE: $3,015,055 TO $3,685,068

*WITHDRAWN FROM THE LETTING*

076 . STPOA-8863(600) LAUDERDALE COUNTY

LENGTH: 0.20 MILES.

WORKING DAYS: 135
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $29.00

for constructing the Grade, Drain, Base, & Pave on Railroad Avenue and Bridge Replacement on Hermitage Drive over the Tennessee Southern Railroad in Florence. Length 0.202 mi.

BRACKET ESTIMATE: $1,814,438 TO $2,217,647

VIEW ITEMS


081 . ST-059-888-005 SHELBY COUNTY

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-61 from SR-145 to SR-25 in Wilsonville. Length 2.724 mi.

BRACKET ESTIMATE: $840,151 TO $1,026,851

VIEW ITEMS


084 . 99-403-371-000-401 JEFFERSON COUNTY

WORKING DAYS: 125
COST OF PLANS: $ 6.00

for the Maintenance Roadside Mowing at Various Locations along I-20, I-65, I-459, and SR-4 as indicated in the plans.

BRACKET ESTIMATE: $402,013 TO $491,349

VIEW ITEMS


200 . STPOA-2816(201) ETOWAH COUNTY

LENGTH: 0.11 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 6.00

for constructing the Bridge Replacement on Steele Station Road over Rook Creek west of Rainbow City. Length 0.011 mi.

BRACKET ESTIMATE: $ 301,384.00 TO $368,358

VIEW ITEMS


Return To: Top of this Page