November 08, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I065(400) , MORGAN, etc. 002 . IM-I065(441) , BUTLER
003 . IM-0004(535) , WALKER 004 . IM-HSIPF-I065(428) , CHILTON
009 . ACAA59064F-STPMBF-7503(600) , MOBILE 014 . NHF-0006(545) , BIBB
018 . ACAA58367-ATRP(001) , JEFFERSON 019 . ACAA58370-ATRP(001) , JEFFERSON
020 . ACAA58618-DE-A195(935) , MADISON 024 . ACRB58547-ATRP(001) , CRENSHAW
025 . ACBRZ58328-ATRP(001) , ESCAMBIA 027 . ACBRZ58626-ATRP(001) , ETOWAH
031 . ACNU58430-ATRP(001) , ESCAMBIA 032 . ACNU58558-ATRP(001) , PIKE
038 . ACNU59771-ATRP(001) , DEKALB 039 . ACNU59995-ATRP(001) , ESCAMBIA
044 . ACOA59555-ATRP(001) , CHAMBERS 053 . SRTS-SR13(912) , TUSCALOOSA
057 . STPAA-0069(543) , WALKER 058 . STPAA-0075(528) , DEKALB
059 . STPAA-0188(503) , MOBILE 062 . STPNU-2800(215) , ETOWAH

001 . IM-I065(400) MORGAN & CULLMAN COUNTIES

LENGTH: 11.26 MILES.

SHALL BE COMPLETED BY: August 1, 2014
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from Hurricane Creek (MP 315.665) to 0.6 miles south of SR-36 (MP 326.874) in Hartselle. Length 11.261 mi.

BRACKET ESTIMATE: $5,569,307 TO $6,806,930

VIEW ITEMS


002 . IM-I065(441) BUTLER COUNTY

LENGTH: 7.55 MILES.

SHALL BE COMPLETED BY: July 31, 2014
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Counting Units on I-65 from 0.7 miles south of Beaver Creek (MP 124.490) to the north end of the CSX Railroad Bridge (MP 132.120) through Greenville. Length 7.629 mi.

BRACKET ESTIMATE: $4,576,766 TO $5,593,825

VIEW ITEMS


003 . IM-0004(535) WALKER COUNTY

LENGTH: 1.52 MILES.

SHALL BE COMPLETED BY: January 2, 2015
COST OF PLANS: $12.00

for constructing the Interchange Lighting on SR-4 (I-22) at CR-371 (Industrial Parkway), Exit 65 in Jasper. Length 1.515 mi.

BRACKET ESTIMATE: $1,132,856 TO $1,384,601

VIEW ITEMS


004 . IM-HSIPF-I065(428) & IM-HSIPF-I065(431) CHILTON COUNTY

LENGTH: 27.92 MILES.

SHALL BE COMPLETED BY: December 12, 2014
COST OF PLANS: $11.00

for constructing the Guiderail Installation on I-65 from the Autauga County Line to the Shelby County Line. Length 27.925 mi.

BRACKET ESTIMATE: $1,685,663 TO $2,060,255

VIEW ITEMS


009 . ACAA59064F-STPMBF-7503(600) MOBILE COUNTY

LENGTH: 3.24 MILES.

WORKING DAYS: 425
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $155

for constructing the Grade, Drain, Base, Pave, Bridge Replacement, and Signals on the 5 Lane Section of Schillinger Road from Howells Ferry Road to just north of the intersection of SR-42 (US-98). Length 3.446 mi.

BRACKET ESTIMATE: $18,196,842 TO $22,240,585

VIEW ITEMS


014 . NHF-0006(545) BIBB COUNTY

WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $125

for constructing the Base, Pave, & Partial Grade and Drain on SR-6 (US-82) from east of SR-25 to east of CR-20 in Centreville. Length 4.796 mi.

BRACKET ESTIMATE: $12,872,480 TO $15,733,032

VIEW ITEMS


018 . ACAA58367-ATRP(001) JEFFERSON COUNTY

LENGTH: 1.41 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Mount Olive Road from CR-118 (Fieldstown Road) to CR-112 (Mount Olive Boulevard) in Gardendale. Length 1.410 mi.

BRACKET ESTIMATE: $332,778 TO $406,729

VIEW ITEMS


019 . ACAA58370-ATRP(001) JEFFERSON COUNTY

LENGTH: 0.72 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 2.00

for constructing the Planing, Resurfacing and Traffic Stripe on CR-1523 (Shady Grove Road) from the intersection of CR-118 (Fieldstown Road) to the junction of Carrington Drive in Gardendale. Length 0.722 mi.

BRACKET ESTIMATE: $197,946 TO $241,934

VIEW ITEMS


020 . ACAA58618-DE-A195(935) MADISON COUNTY

LENGTH: 0.08 MILES.

WORKING DAYS: 160
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $23.00

for constructing the Bridge Replacement on CR-77 (Holmes Avenue) over Pinhook Creek in the city of Huntsville. Length 0.081 mi.

BRACKET ESTIMATE: $1,813,695 TO $2,216,738

VIEW ITEMS


024 . ACBR58547-ATRP(001) & ACBR58545 ATRP(001) CRENSHAW COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Bridge Replacements and Approaches on CR-59 over Cedar Creek approximately 1.5 miles north of Luverne and over Bee Creek approximately 6.0 miles north of Luverne. Length 0.211 mi.

BRACKET ESTIMATE: $471,959 TO $576,839

VIEW ITEMS


025 . ACBRZ58328-ATRP(001) ESCAMBIA COUNTY

LENGTH: 3.23 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $26.00

for constructing the Grade, Drain, Base, Pave, Resurfacing, and Bridge Replacement on CR-99 (Atmosphere Road) from CR-1 (Jack Springs Road) to CR-4 (Poarch Road) in Poarch. Length 3.229 mi.

BRACKET ESTIMATE: $1,752,000 TO $2,141,334

VIEW ITEMS


027 . ACBRZ58626-ATRP(001) ETOWAH COUNTY

LENGTH: 0.28 MILES.

WORKING DAYS: 225
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $22.00

for constructing the Bridge Replacement and Approaches on CR-83 (Bud Umphrey Road) over Bristow Creek northeast of Walnut Grove. Length 0.316 mi.

BRACKET ESTIMATE: $1,645,055 TO $2,010,623

VIEW ITEMS


031 . ACNU58430-ATRP(001) ESCAMBIA COUNTY

LENGTH: 3.39 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-5 (Canoe Road North) from the intersection of SR-3 (US-31) to the intersection of CR-27 (Robinsonville Road) in Canoe. Length 3.390 mi.

BRACKET ESTIMATE: $636,501 TO $777,945

VIEW ITEMS


032 . ACNU58558-ATRP(001) & ACNU58554-ATRP(001) PIKE COUNTY

LENGTH: 9.25 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Patching, Resurfacing, Traffic Stripe, and Guardrail on CR-6600 from SR-223 North to CR-6602 northeast of Troy and on CR-7702 from the Montgomery County Line to CR-7707 north of Troy. Length 9.249 mi.

BRACKET ESTIMATE: $1,685,008 TO $2,059,454

VIEW ITEMS


038 . ACNU59771-ATRP(001) DEKALB COUNTY

LENGTH: 1.67 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-50 (Traylor Street) from the junction of CR-56 to the junction of SR-75 in Fyffe. Length 1.665 mi.

BRACKET ESTIMATE: $246, 322 TO $301, 061

VIEW ITEMS


039 . ACNU59995-ATRP(001) ESCAMBIA COUNTY

LENGTH: 3.62 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Pea Ridge Road from west of the Brewton City Limits to the intersection of SR-41. Length 3.617 mi.

BRACKET ESTIMATE: $580,970 TO $710,075

VIEW ITEMS


044 . ACOA59555-ATRP(001) & ACOA59556-ATRP(001) CHAMBERS COUNTY

LENGTH: 7.48 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Widening, Resurfacing and Traffic Stripe on Magnolia Road from 21st Ave SW East to near SR-15 (US-29) in Lanett and on CR-299 (1299) from CR-83 (1083) East in Cusseta to CR-208 (1208). Length 7.480 mi.

BRACKET ESTIMATE: $1,748,397 TO $2,136,929

VIEW ITEMS


053 . SRTS-SR13(912) TUSCALOOSA COUNTY

LENGTH: 0.36 MILES.

WORKING DAYS: 35
COST OF PLANS: $15.00

for constructing the Infrastructure Improvements (Sidewalks) along 26th Avenue, 28th Street, and Mayfield Way in Northport. Length 0.356 mi.

BRACKET ESTIMATE: $91,035 TO $111,264

VIEW ITEMS


057 . STPAA-0069(543) WALKER COUNTY

LENGTH: 11.11 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing, Loop Detectors, and Traffic Stripe on SR-69 from Center Street in Oakman to the intersection of Elliott Boulevard and 20th Street in Jasper. Length 11.105 mi.

BRACKET ESTIMATE: $2,349,343 TO $2,871,420

VIEW ITEMS


058 . STPAA-0075(528) DEKALB COUNTY

LENGTH: 8.07 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-75 from south of SR-40 in Henagar to just north of SR-117 in Ider. Length 7.070 mi.

BRACKET ESTIMATE: $1,845,548 TO $2,255,669

VIEW ITEMS


059 . STPAA-0188(503) MOBILE COUNTY

LENGTH: 0.50 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-188 from 0.1 mile north of I-10 to the north Abutment of the Franklin Creek Bridge north of Grand Bay. Length 0.496 mi.

BRACKET ESTIMATE: $185,375 TO $226,566

VIEW ITEMS


062 . STPNU-2800(215) ETOWAH COUNTY

LENGTH: 1.79 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-276 (Stephens Gap Road) from the intersection of CR-15 (Duck Springs Road) to the intersection of SR-7 (US-11) in Reece City. Length 1.789 mi.

BRACKET ESTIMATE: $480,846 TO $587,701

VIEW ITEMS