Office Engineer

Proposal Letting List
September 27, 2013 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


007 . NHF-0901(500) , CALHOUN 011 . HPP-0216(502) , TUSCALOOSA
015 . ACAA57910-ATRP(001) , RUSSELL 016 . ACAA58359-ATRP(001) , MONTGOMERY
017 . ACAA58372-ATRP(001) , JEFFERSON 018 . ACAA59586-ATRP(001) , AUTAUGA
021 . ACBR60156-ATRP(001) , MACON 023 . ACBRZ58403-ATRP(001) , CLEBURNE
024 . ACBRZ58656-ATRP(001) , MARSHALL 027 . ACNU58304-ATRP(001) , MOBILE
028 . ACNU58308-ATRP(001) , CONECUH 029 . ACNU58317-ATRP(001) , CONECUH
030 . ACNU58319-ATRP(001) , CONECUH 031 . ACNU58320-ATRP(001) , CONECUH
032 . ACNU58470-ATRP(001) , MONROE 033 . ACNU59639-ATRP(001) , MACON
034 . ACNU59994-ATRP(001) , ESCAMBIA 035 . ACNU59996-ATRP(001) , ESCAMBIA
038 . ACOA58389-ATRP(001) , COLBERT 039 . ACOA60203-ATRP(001) , HOUSTON
040 . ACOA58424-ATRP(001) , BALDWIN 042 . CMAQ-9802(914) , SHELBY
048 . RHCH-RR13(902) , COFFEE, etc. 051 . SRTS-SR13(914) , HOUSTON
054 . STPHV-STPAA-0001(577) , MADISON 056 . STPNU-4300(204) , LOWNDES
058 . STPOA-8157(600) , ETOWAH 062 . ST-059-119-009 , SHELBY
065 . 99-507-690-000-301 , BARBOUR, etc. 200 . BRZ-4800(211) , MARSHALL

007 . NHF-0901(500) CALHOUN COUNTY

WORKING DAYS: 305
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $117

for constructing the Grade, Drain, Base, Pave, Bridge Culverts, Signing and Signals on SR-901 (Anniston E. Bypass) from 1500' south of Lake Yahou to SR-1 (US-431) in Anniston. Length 3.731 mi.

BRACKET ESTIMATE: $12,554,822 TO $15,344,782

VIEW ITEMS


011 . HPP-0216(502) TUSCALOOSA COUNTY

LENGTH: 0.30 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $30.00

for constructing the Safety Widening, Resurfacing and Traffic Stripe on SR-216 (Intersection Improvements at Connie Drive in Lakeview). Length 0.302 mi

BRACKET ESTIMATE: $497,886 TO $608,528

VIEW ITEMS


015 . ACAA57910-ATRP(001) RUSSELL COUNTY

LENGTH: 0.91 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Airport Road from CR-61 (Summerville Road) to Riverchase Drive in Phenix City. Length 0.905 mi.

BRACKET ESTIMATE: $178,317 TO $217,944

VIEW ITEMS


016 . ACAA58359-ATRP(001) MONTGOMERY COUNTY

LENGTH: 7.09 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-85 (Old Carter Hill/Pike Road) from US-82 to CR-83 (Wallahatchie Road). Length 7.094 mi.

BRACKET ESTIMATE: $1,522,692 TO $1,861,069

VIEW ITEMS


017 . ACAA58372-ATRP(001) JEFFERSON COUNTY

LENGTH: 3.42 MILES.

WORKING DAYS: 110
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $23.00

for constructing the Planing, Resurfacing, Ramps and Bridge Improvements, and Traffic Stripe on Lorna Road from the Cahaba River to SR-3 (US-31) & Resurfacing, Sidewalk Improvements, and Traffic Stripe on Patton Chapel Road from Lorna Road to SR-3 (US-31) in Hoover. Length 3.418 mi.

BRACKET ESTIMATE: $1,576,976 TO $1,927,415

VIEW ITEMS


018 . ACAA59586-ATRP(001) AUTAUGA COUNTY

LENGTH: 7.91 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing and Traffic Stripe on CR-57 from the Prattville City Limits to CR-40. Length 7.905 mi.

BRACKET ESTIMATE: $1,117,310 TO $1,365,602

VIEW ITEMS


021 . ACBR60156-ATRP(001) , ACBR60157-ATRP (001) & ACBR60158-ATRP (001) MACON COUNTY

LENGTH: 0.53 MILES.

WORKING DAYS: 170
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $31.00

for constructing the Bridge Replacements, Approaches, and Guardrail End Anchor Installation on CR-9 over Old Town Creek and Town Creek Reliefs west of the Bullock County Line. Length 0.531 mi.

BRACKET ESTIMATE: $2,043,944 TO $2,498,154

VIEW ITEMS


023 . ACBRZ58403-ATRP(001) CLEBURNE COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge) on CR-46 (Bells Mill Road) over Cane Creek in Heflin. Length 0.044 mi.

BRACKET ESTIMATE: $136,462 TO $166,787

VIEW ITEMS


024 . ACBRZ58656-ATRP(001) MARSHALL COUNTY

LENGTH: 0.03 MILES.

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 7.00

for constructing the Bridge Replacement on CR-63 (Welcome Home Church Road) over Slab Creek near Nixon Chapel. Length 0.034 mi.

BRACKET ESTIMATE: $537,540 TO $656,994

VIEW ITEMS


027 . ACNU58304-ATRP(001) MOBILE COUNTY

LENGTH: 14.09 MILES.

WORKING DAYS: 115
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Planing, Resurfacing, Guardrail Replacement, and Striping on CR-96 (Coy Smith Highway) from School Street in Citronelle to SR-13 (US-43) in Mount Vernon. Length 14.091 mi.

BRACKET ESTIMATE: $3,775,111 TO $4,614,025

VIEW ITEMS


028 . ACNU58308-ATRP(001) CONECUH COUNTY

LENGTH: 1.44 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Culvert Extension on CR-42 (Brooklyn Road/South Main Street) from the South City Limits of Evergreen to SR-12 (US-84) in Evergreen. Length 1.449 mi.

BRACKET ESTIMATE: $375,183 TO $458,557

VIEW ITEMS


029 . ACNU58317-ATRP(001) CONECUH COUNTY

LENGTH: 12.82 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-5 from SR-12 (US-84) in Repton to CR-30 in Burnt Corn and from Murder Creek to the Pipkin Bypass in Skinnerton. Length 12.831 mi.

BRACKET ESTIMATE: $1,561,517 TO $1,908,521

VIEW ITEMS


030 . ACNU58319-ATRP(001) CONECUH COUNTY

LENGTH: 9.90 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-29 from the intersection of SR-83 in Evergreen to the Sepulga River Bridge. Length 9.902 mi.

BRACKET ESTIMATE: $1,147,663 TO $1,402,663

VIEW ITEMS


031 . ACNU58320-ATRP(001) CONECUH COUNTY

LENGTH: 5.20 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-20 from the intersection of CR-15 to the intersection of Ivey Cemetery Road north of Belleville. Length 5.200 mi.

BRACKET ESTIMATE: $561,211 TO $685,925

VIEW ITEMS


032 . ACNU58470-ATRP(001) MONROE COUNTY

LENGTH: 4.86 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing, Guardrail Installation and Traffic Stripe on CR-42 from the junction of SR-41 to CR-30. Length 4.856 mi.

BRACKET ESTIMATE: $1,236,278 TO $1,511,006

VIEW ITEMS


033 . ACNU59639-ATRP(001) MACON COUNTY

LENGTH: 2.24 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing and Traffic Stripe on CR-54 (East Main Street) from Railroad Avenue East to Whitman Hill Road in Notasulga. Length 2.238 mi.

BRACKET ESTIMATE: $329,210 TO $402,367

VIEW ITEMS


034 . ACNU59994-ATRP(001) ESCAMBIA COUNTY

LENGTH: 4.45 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing and Traffic Stripe on CR-12 (Woods Road & Robinsonville Road) from the intersection of CR-1 to the intersection of CR-27 (Pouncey Road) in Robinsonville. Length .450 mi.

BRACKET ESTIMATE: $862,237 TO $1,053,845

VIEW ITEMS


035 . ACNU59996-ATRP(001) ESCAMBIA COUNTY

LENGTH: 5.74 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Widening, Resurfacing, Guardrail Replacement, and Striping on CR-6 (Wolflog Road) from the intersection of SR-113 to the intersection of SR-3 (US-31) Northeast of Flomaton. Length 5.808 mi.

BRACKET ESTIMATE: $1,159,166 TO $1,416,758

VIEW ITEMS


038 . ACOA58389-ATRP(001) COLBERT COUNTY

LENGTH: 0.99 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $15.00

for constructing the Concrete Pavement Rehabilitation, Resurfacing, Traffic Signals and Traffic Stripe on Second Street from Jackson Highway to Woodward Avenue in Sheffield. Length 0.994 mi.

BRACKET ESTIMATE: $790,608 TO $966,298

VIEW ITEMS


039 . ACOA60203-ATRP(001) HOUSTON COUNTY

LENGTH: 4.42 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-10 (Westgate Parkway) from CR-3 to SR-1 (US-431); on CR-40 (Lafayette Street) from Woodland Drive to 6th Avenue; and on Montana Street from SR-12 (US-84) to SR-53 (US-231) in Dothan. Length 4.418 mi.

BRACKET ESTIMATE: $1,003,591 TO $1,226,611

VIEW ITEMS


040 . ACOA58424-ATRP(001) BALDWIN COUNTY

LENGTH: 0.57 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Storm Drainage Repairs on Church Street from Fels Avenue to Morphy Avenue in Fairhope. Length 0.057 mi.

BRACKET ESTIMATE: $112,613 TO $137,638

VIEW ITEMS


042 . CMAQ-9802(914) SHELBY COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $16.00

for constructing the Grade, Drain, Base, and Pave of Park & Ride Lot on Shelby West Parkway 0.75 miles north of CR-87 near the Shelby County Airport. Length 0.207 mi.

BRACKET ESTIMATE: $561,346 TO $686,089

VIEW ITEMS


048 . STPRR-STPRH-RR13(902) COFFEE , COVINGTON & GENEVA COUNTIES

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $11.00

for the Removal of Various Abandoned Railroad Crossings along the Alabama & Florida Rail Line in Coffee, Covington, and Geneva Counties.

BRACKET ESTIMATE: $629,355 TO $769,880

VIEW ITEMS


051 . SRTS-SR13(914) HOUSTON COUNTY

LENGTH: 0.90 MILES.

WORKING DAYS: 75
COST OF PLANS: $13.00

for constructing the Sidewalk Improvements on South Park Avenue from Fortner Street to West Selma Street and on Woodland Drive from Valley Forge Road to South Park Avenue in Dothan. Length 0.895 mi.

BRACKET ESTIMATE: $151,458 TO $185,115

VIEW ITEMS


054 . STPHV-STPAA-0001(577) MADISON COUNTY

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $29.00

for constructing the Intersection Improvements on SR-1 (US-431) at Sutton Road, Caldwell Lane, Plainview Drive, and Old Big Cove Road in Huntsville. Length 0.706 mi.

BRACKET ESTIMATE: $1,992,226 TO $2,434,943

VIEW ITEMS


056 . STPNU-4300(204) LOWNDES COUNTY

LENGTH: 7.50 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-13 from CR-17 to Main Street and on CR-2 from Main Street to SR-21 in Mosses. Length 7.499 mi.

BRACKET ESTIMATE: $1,135,379 TO $1,387,685

VIEW ITEMS


058 . STPOA-8157(600) ETOWAH COUNTY

LENGTH: 2.41 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-419 (Colvin Gap Road) from the Calhoun County Line to the intersection of CR-420 (Sibert Street South) in Hokes Bluff. Length 2.411 mi.

BRACKET ESTIMATE: $555,525 TO $678,976

VIEW ITEMS


062 . ST-059-119-009 SHELBY COUNTY

LENGTH: 0.24 MILES.

WORKING DAYS: 60
COST OF PLANS: $15.00

for constructing the Turn Lanes and Intersection Improvements (Grade, Drain, Base, Pave, Signing, Striping, and Signals) on SR-119 (Montevallo Road) and on CR-80 (Mission Hills Road) south of Alabaster. Length 0.238 mi.

BRACKET ESTIMATE: $589,513 TO $720,516

VIEW ITEMS


065 . 99-507-690-000-301 BARBOUR , COFFEE , GENEVA & PIKE COUNTIES

WORKING DAYS: 75
COST OF PLANS: $15.00

for constructing the Pile Encasements and Riprap Placement on Various Bridges in the Seventh Division.

BRACKET ESTIMATE: $344,882 TO $421,522

VIEW ITEMS


200 . BRZ-4800(211) MARSHALL COUNTY

LENGTH: 0.04 MILES.

WORKING DAYS: 75
COST OF PLANS: $ 7.00

for constructing the Bridge Replacement and Approaches on CR-3 (Douglas-Hyatt Road) over Big Branch in Horton. Length 0.042 mi.

BRACKET ESTIMATE: $276,793 TO $338,302

VIEW ITEMS