Office Engineer

Proposal Letting List
February 28, 2014 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I020(345) , CALHOUN 003 . IM-I059(365) , JEFFERSON
004 . APD-IM-0004(521) , WALKER 005 . IM-IMD-I010(323) , MOBILE
007 . HPP-A188(900) , JEFFERSON 009 . ACAA58277-ATRP(001) , MOBILE
011 . ACAA58688-ATRP(001) , JEFFERSON 013 . ACBRZ58475-ATRP(001) , WASHINGTON
014 . ACBRZ58646-ATRP(001) , JACKSON 015 . ACBRZ59407-ATRP(001) , COFFEE
022 . ACNU58438-ATRP(001) , RUSSELL 023 . ACNU58449-ATRP(001) , TALLADEGA
024 . ACNU58485-ATRP(001) , LAMAR 025 . ACNU59334-ATRP(001) , CLARKE
027 . ACNU59557-ATRP(001) , CHAMBERS 028 . ACNU59646-ATRP(001) , LAUDERDALE
029 . ACNU60544-ATRP(001) , HENRY 030 . ACNU61487-ATRP(001) , WASHINGTON
031 . ACNU59584-ATRP(001) , AUTAUGA 033 . ACNU59346-ATRP(001) , MONROE
041 . HSIP-4914(250) , MOBILE 042 . HSIP-STPAA-0049(506) , CLAY
045 . NH-0002(561) , LIMESTONE 046 . NH-0003(586) , ESCAMBIA
047 . NH-0008(575) , MARENGO 048 . NH-0016(515) , MOBILE
049 . NH-0035(528) , JACKSON 050 . NH-0067(506) , MORGAN
062 . SRTS-SR13(918) , MOBILE 064 . STPAA-0016(514) , BALDWIN
065 . STPAA-0017(553) , SUMTER 066 . STPAA-0017(555) , CHOCTAW
067 . STPAA-0018(504) , LAMAR 068 . STPAA-0019(505) , MARION
069 . STPAA-0021(546) , ESCAMBIA 070 . STPAA-0083(501) , CONECUH
071 . STPAA-0215(502) , TUSCALOOSA 072 . STPAA-HSIP-0009(554) , CLEBURNE
073 . STPAA-HSIP-0049(505) , TALLAPOOSA 074 . STPAA-HSIP-0095(503) , HENRY
075 . STPAA-HSIP-0096(504) , LAMAR 076 . STPAA-HSIP-0105(502) , DALE
077 . STPAA-HSIP-0110(503) , BULLOCK 078 . STPAA-HSIP-0110(505) , MONTGOMERY
079 . STPAA-HSIP-0132(502) , ETOWAH 081 . STPAA-HSIP-0219(505) , BIBB
082 . STPAA-7804(602) , AUTAUGA, etc. 083 . STPAA-7806(600) , AUTAUGA
084 . STPNU-0714(250) , BUTLER 085 . STPNU-1009(203) , CHEROKEE
086 . STPNU-2214(250) , CULLMAN 088 . STPNU-3114(250) , GENEVA
089 . STPNU-5100(205) , MONTGOMERY 092 . STPOA-9441(605) , DALE
093 . STPOA-9647(600) , TUSCALOOSA 094 . ST-037-999-011 , JEFFERSON
096 . 99-408-462-013-312 , MARENGO 097 . 99-505-690-950-301 , TUSCALOOSA, etc.
098 . 99-401-690-000-401 , CULLMAN, etc. 099 . 99-401-690-000-402 , BLOUNT, etc.
100 . 99-401-690-000-403 , DEKALB, etc. 101 . 99-401-690-000-404 , BLOUNT, etc.
103 . 99-401-690-000-405 , MADISON, etc. 200 . STPAA-7819(600) , AUTAUGA

001 . IM-I020(345) CALHOUN COUNTY

SHALL BE COMPLETED BY: February 19, 2015
COST OF PLANS: $ 9.00

for constructing the Interchange Lighting on I-20 at SR-21 (Exit 185) in Oxford. Length 0.852 mi.

BRACKET ESTIMATE: $728,723 TO $890,661

VIEW ITEMS


003 . IM-I059(365) JEFFERSON COUNTY

LENGTH: 3.37 MILES.

SHALL BE COMPLETED BY: August 1, 2015
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $52.00

for constructing the Polymer Modified Open Graded Friction Course, Concrete Slab Replacement, Guardrail and Median Barrier Replacement, Bridge Rail Retrofit, Traffic Stripe and Signing on I-59 from north of SR-3 (US-31/EB Stephens Expressway) to north of the I-20 Interchange. Length 4.143 mi.

BRACKET ESTIMATE: $12,965,220 TO $15,846,380

VIEW ITEMS


004 . APD-IM-0004(521) , APD-IM-0004(520) & APD-IM-0004(527) WALKER COUNTY

LENGTH: 4.76 MILES.

SHALL BE COMPLETED BY: November 7, 2014
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $106

for constructing the Planing, Ultimate Paving, and Traffic Stripe on SR-4 (US-78/I-22, Corridor X) from the SR-69 Overpass Bridge (MP 60.660) to the Norfolk Southern Railroad Bridge (MP 63.300); from the west end of the Norfolk Southern Railroad Bridge (MP 63.300) to west of Industrial Boulevard (MP 65.410); and from the Overpass Ramps at SR-118 (Approximate MP 57.524) to SR-69 (MP 60.660). Length 7.875 mi.

BRACKET ESTIMATE: $16,413,680 TO $20,061,164

VIEW ITEMS


005 . IM-IMD-I010(323) MOBILE COUNTY

SHALL BE COMPLETED BY: May 15, 2016
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $115

for constructing the Welcome Center Replacement (Grade, Drain, Base, Pave, Demolition, Building, Lighting, Landscaping, Sewer, and Lagoon Removal) on I-10 at the Alabama/Mississippi State Line.

BRACKET ESTIMATE: $14,982,689 TO $18,312,175

VIEW ITEMS


007 . HPP-A188(900) JEFFERSON COUNTY

WORKING DAYS: 130
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $26.00

for constructing the Transportation Enhancement Project (Grade, Drain, Base, Pave, Lighting and Landscaping) for Sidewalks and Streetscape along Cahaba Road between the Botanical Gardens and the Birmingham Zoo. Length 0.465 mi.

BRACKET ESTIMATE: $1,789,085 TO $2,186,660

VIEW ITEMS


009 . ACAA58277-ATRP(001) MOBILE COUNTY

LENGTH: 2.48 MILES.

WORKING DAYS: 280
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $66.00

for constructing the Reconstruction (Grade, Drain, Base, Pave, Signing and Signals) of Wilson Avenue from SR-17 (St. Stephens Road) to 12th Avenue in the Cities of Prichard, Mobile, and Chickasaw. Length 2.477 mi.

BRACKET ESTIMATE: $3,044,328 TO $3,720,846

VIEW ITEMS


011 . ACAA58688-ATRP(001) JEFFERSON COUNTY

WORKING DAYS: 130
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $21.00

for constructing the Traffic Signalization Upgrade on 18th Street North and on 19th Street North in Bessemer.

BRACKET ESTIMATE: $1,585,507 TO $1,937,842

VIEW ITEMS


013 . ACBRZ58475-ATRP(001) WASHINGTON COUNTY

LENGTH: 0.16 MILES.

WORKING DAYS: 240
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 6.00

for constructing the Bridge and Two Relief Bridge Replacements on CR-8 over the Escatawpa River. Length 0.159 mi.

BRACKET ESTIMATE: $2,105,492 TO $2,573,380

VIEW ITEMS


014 . ACBRZ58646-ATRP(001) JACKSON COUNTY

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $10.00

for constructing the Bridge Replacement and Approaches on CR-151 over Bryant Creek east of Pisgah. Length 0.241 mi.

BRACKET ESTIMATE: $801,988 TO $980,207

VIEW ITEMS


015 . ACBRZ59407-ATRP(001) COFFEE COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 4.00

for constructing the Bridge Replacement on CR-637 over Whiskey Branch. Length 0.007 mi.

BRACKET ESTIMATE: $185,271 TO $226,443

VIEW ITEMS


022 . ACNU58438-ATRP(001) & ACNU58437-ATRP(002) RUSSELL COUNTY

LENGTH: 15.04 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Resurfacing and Traffic Stripe on CR-4 (Cottonton Road) from Pittsview Highway to SR-165 in Cottonton and on CR-4 (Prudence Road) from CR-49 East (Rutherford Road) to SR-1 (US-431) in Pittsview. Length 15.035 mi.

BRACKET ESTIMATE: $1,719,928 TO $2,102,135

VIEW ITEMS


023 . ACNU58449-ATRP(001) TALLADEGA COUNTY

LENGTH: 6.00 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-399 (Speedway Boulevard) from SR-77 to the Rights-Of-Way (ROW) of I-20 (Exit 173) in Talladega. Length 5.861 mi.

BRACKET ESTIMATE: $2,078,995 TO $2,540,994

VIEW ITEMS


024 . ACNU58485-ATRP(001) LAMAR COUNTY

LENGTH: 12.15 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-35 from the intersection of SR-17 to the Marion County Line. Length 12.154 mi.

BRACKET ESTIMATE: $1,163,286 TO $1,421,795

VIEW ITEMS


025 . ACNU59334-ATRP(001) CLARKE COUNTY

LENGTH: 13.89 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-3 (Winn Road) from CR-3 (McVay Road) to SR-12 (US-84). Length 13.889 mi.

BRACKET ESTIMATE: $1,038,141 TO $1,268,838

VIEW ITEMS


027 . ACNU59557-ATRP(001) , ACOA59561-ATRP(001) & ACNU59562-ATRP(001) CHAMBERS COUNTY

LENGTH: 16.58 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 9.00

for constructing the Full Depth Reclamation, Pave, and Traffic Stripe on CR-289 and CR-222 from CR-216 to SR-1 (US-431); on CR-210 from CR-84 to CR-202; and on CR-222 from CR-289 East to the Georgia State Line. Length 16.295 mi.

BRACKET ESTIMATE: $2,722,600 TO $3,327,622

VIEW ITEMS


028 . ACNU59646-ATRP(001) LAUDERDALE COUNTY

LENGTH: 13.50 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe at Various Sites as indicated in the Plans (Site #1 - on CR-8 from 0.40 miles north of CR-79 to SR-20); (Site #2 - on CR-16 from CR-81 to SR-20); (Site #3 - on CR-47 from SR-13/US-43 to CR-372); and (Site #4 - on CR-26 from 0.57 miles east of SR-207 to CR-125). Length 13.500 mi.

BRACKET ESTIMATE: $1,102,226 TO $1,347,166

VIEW ITEMS


029 . ACNU60544-ATRP(001) HENRY COUNTY

LENGTH: 5.41 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-26 from CR-53 (Brown's Crossroads East) to CR-65 and on CR-65 from CR-26 North to SR-95 (George H. Grimsley Highway) north of Haleburg. Length 5.410 mi.

BRACKET ESTIMATE: $731,781 TO $894,399

VIEW ITEMS


030 . ACNU61487-ATRP(001) WASHINGTON COUNTY

LENGTH: 6.85 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-35 from the Mobile County Line to the intersection of CR-4 in Sims Chapel. Length 6.893 mi.

BRACKET ESTIMATE: $1,349,837 TO $1,649,800

VIEW ITEMS


031 . ACNU59584-ATRP(001) AUTAUGA COUNTY

LENGTH: 7.75 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing, and Traffic Stripe on CR-40 from the intersection of CR-1 to the intersection of CR-19. Length 7.745 mi.

BRACKET ESTIMATE: $810,528 TO $990,646

VIEW ITEMS


033 . ACNU59346-ATRP(001) , ACNU59347-ATRP(001) & ACNU59348-ATRP(001) MONROE COUNTY

LENGTH: 1.59 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 7.00

for constructing the Resurfacing and Traffic Stripe on South Mount Pleasant Drive from Manford Avenue to the Monroeville City Limits; on Golf/Brookhill Drive from Bergman Avenue to Meadowbrook Drive; and on CR-27 (Clausell Road) from Whiting Drive to the Monroeville City Limits. Length 1.593 mi.

BRACKET ESTIMATE: $206,785 TO $252,737

VIEW ITEMS


041 . HSIP-4914(250) MOBILE COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $16.00

for constructing the Intersection Improvements for CR-358 (Three Notch Road); CR-328 (Dawes Lane); and CR-328 (Dawes Lane Extension) in Mobile. Length 0.100 mi.

BRACKET ESTIMATE: $530,926 TO $648,910

VIEW ITEMS


042 . HSIP-STPAA-0049(506) CLAY COUNTY

LENGTH: 8.21 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-49 from SR-77 (MP 60.329) to SR-9 (MP 68.537) in Lineville. Length 8.208 mi.

BRACKET ESTIMATE: $1,875,687 TO $2,292,506

VIEW ITEMS


045 . NH-0002(561) LIMESTONE COUNTY

LENGTH: 2.66 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on SR-2 (US-72) from York Lane (MP 72.163) to just west of Jefferson Street (MP 74.863) in Athens. Length 2.660 mi.

BRACKET ESTIMATE: $1,106,813 TO $1,352,771

VIEW ITEMS


046 . NH-0003(586) ESCAMBIA COUNTY

LENGTH: 1.15 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Resurfacing (High Performance Chip Seal) and Traffic Stripe on SR-3 (US-31/Twin Bridges Road) from 0.39 miles east of the Railroad Overpass at MP 57.950 to 0.27 miles west of the Little Escambia Creek Bridge east of Flomaton. Length 1.150 mi.

BRACKET ESTIMATE: $103,943 TO $127,041

VIEW ITEMS


047 . NH-0008(575) MARENGO COUNTY

LENGTH: 6.37 MILES.

WORKING DAYS: 55
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from 0.28 miles east of the intersection at SR-28 to east of CR-28. Length 6.365 mi.

BRACKET ESTIMATE: $2,620,420 TO $3,202,735

VIEW ITEMS


048 . NH-0016(515) MOBILE COUNTY

LENGTH: 5.20 MILES.

WORKING DAYS: 130
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $11.00

for constructing the Resurfacing and Traffic Stripe on SR-16 (US-90) from the Halls Mill Creek Bridge to the Pavement Joint at Pinehill Drive in Mobile. Length 5.203 mi.

BRACKET ESTIMATE: $2,417,887 TO $2,955,196

VIEW ITEMS


049 . NH-0035(528) JACKSON COUNTY

LENGTH: 1.98 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-35 from 0.10 miles north of Courtland Street (MP 47.470) to 0.10 miles south of SR-2 (US-72) (MP 49.450). Length 1.979 mi.

BRACKET ESTIMATE: $876,523 TO $1,071,306

VIEW ITEMS


050 . NH-0067(506) MORGAN COUNTY

LENGTH: 7.01 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-67 from the Cullman County Line (MP 10.271) to 0.12 miles north of Entrekin Road (MP 17.268). Length 7.010 mi.

BRACKET ESTIMATE: $1,668,300 TO $2,039,033

VIEW ITEMS


062 . SRTS-SR13(918) MOBILE COUNTY

LENGTH: 0.79 MILES.

WORKING DAYS: 45
COST OF PLANS: $18.00

for constructing the Sidewalks and Crosswalks on 12th Avenue and Kansas Street in Chickasaw. Length 0.794 mi.

BRACKET ESTIMATE: $155,652 TO $190,241

VIEW ITEMS


064 . STPAA-0016(514) BALDWIN COUNTY

LENGTH: 3.23 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 7.00

for constructing the Resurfacing and Traffic Stripe on SR-16 (US-90) from just east of the I-10/SR-16 (US-90) Eastbound Ramp (MP 44.748) to just west of SR-181 (MP 47.978). Length 3.229 mi.

BRACKET ESTIMATE: $729,715 TO $891,874

VIEW ITEMS


065 . STPAA-0017(553) SUMTER COUNTY

LENGTH: 7.59 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from 0.360 miles north of I-20/59 to the junction of SR-28. Length 8.045 mi.

BRACKET ESTIMATE: $1,781,901 TO $2,177,879

VIEW ITEMS


066 . STPAA-0017(555) CHOCTAW COUNTY

LENGTH: 8.77 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from the south end of the Tuckabum Creek Bridge (MP 116.255) to the Sumter County Line (MP 125.036). Length 8.770 mi.

BRACKET ESTIMATE: $1,409,646 TO $1,722,901

VIEW ITEMS


067 . STPAA-0018(504) LAMAR COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-18 from 10th Street to the junction of SR-17 in Vernon. Length 1.000 mi.

BRACKET ESTIMATE: $345,638 TO $422,446

VIEW ITEMS


068 . STPAA-0019(505) MARION COUNTY

LENGTH: 5.98 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-19 from the junction of SR-74 (MP 11.510) to just north of CR-20 (MP 17.480). Length 5.984 mi.

BRACKET ESTIMATE: $1,479,467 TO $1,808,237

VIEW ITEMS


069 . STPAA-0021(546) ESCAMBIA COUNTY

LENGTH: 10.76 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from 0.2 miles south of I-65 (MP 7.947) to the south abutment of the Little River Bridge. Length 10.760 mi.

BRACKET ESTIMATE: $1,997,313 TO $2,441,160

VIEW ITEMS


070 . STPAA-0083(501) CONECUH COUNTY

LENGTH: 21.46 MILES.

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-83 from the intersection of SR-3 (US-31) (MP 0.009) to the Monroe County Line (MP 21.628). Length 21.458 mi.

BRACKET ESTIMATE: $3,541,908 TO $4,328,998

VIEW ITEMS


071 . STPAA-0215(502) TUSCALOOSA COUNTY

LENGTH: 1.47 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-215 (University Boulevard) from the east end of the ABS Railroad Overpass to 200 feet north of Brookhill Road in Tuscaloosa. Length 1.476 mi.

BRACKET ESTIMATE: $531,083 TO $649,101

VIEW ITEMS


072 . STPAA-HSIP-0009(554) CLEBURNE COUNTY

LENGTH: 10.33 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing, Widening, and Traffic Stripe on SR-9 from the Clay County Line to I-20. Length 10.330 mi.

BRACKET ESTIMATE: $3,152,580 TO $3,853,153

VIEW ITEMS


073 . STPAA-HSIP-0049(505) TALLAPOOSA COUNTY

LENGTH: 9.09 MILES.

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-49 from SR-50 to the junction of South Broadnax Street in Dadeville. Length 9.093 mi.

BRACKET ESTIMATE: $2,112,504 TO $2,581,949

VIEW ITEMS


074 . STPAA-HSIP-0095(503) HENRY COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-95 from the North Town Limits of Haleburg to 0.9 miles north of Lisenby Road in Abbeville. Length 11.679 mi.

BRACKET ESTIMATE: $3,372,938 TO $4,122,480

VIEW ITEMS


075 . STPAA-HSIP-0096(504) LAMAR COUNTY

LENGTH: 2.81 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-96 from MP 18.740 to west of the Fayette County Line (MP 21.545). Length 2.804 mi.

BRACKET ESTIMATE: $1,088,730 TO $1,330,670

VIEW ITEMS


076 . STPAA-HSIP-0105(502) DALE COUNTY

LENGTH: 9.05 MILES.

WORKING DAYS: 110
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $21.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-105 from just north of Jones Street in Ozark to just north of CR-33 in Skipperville. Length 9.052 mi.

BRACKET ESTIMATE: $2,334,603 TO $2,853,404

VIEW ITEMS


077 . STPAA-HSIP-0110(503) BULLOCK COUNTY

LENGTH: 7.57 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Widening, Resurfacing and Traffic Stripe on SR-110 from 0.4 miles east of CR-7 to the intersection of SR-6 (US-82) in Lofield. Length 7.575 mi.

BRACKET ESTIMATE: $2,258,074 TO $2,759,869

VIEW ITEMS


078 . STPAA-HSIP-0110(505) MONTGOMERY COUNTY

LENGTH: 7.88 MILES.

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-110 from east of Chantilly Parkway (MP 4.650) to the Bullock County Line (MP 14.127). Length 7.884 mi.

BRACKET ESTIMATE: $3,587,597 TO $4,384,841

VIEW ITEMS


079 . STPAA-HSIP-0132(502) ETOWAH COUNTY

LENGTH: 7.70 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 5.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-132 from the Blount County Line in Altoona to the intersection of SR-74. Length 7.699 mi.

BRACKET ESTIMATE: $2,327,347 TO $2,844,535

VIEW ITEMS


081 . STPAA-HSIP-0219(505) BIBB COUNTY

LENGTH: 8.11 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $14.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-219 from the Perry County Line to the junction of SR-6 (US-82) in Centreville. Length 8.111 mi.

BRACKET ESTIMATE: $2,017,937 TO $2,466,368

VIEW ITEMS


082 . STPAA-7804(602) AUTAUGA & ELMORE COUNTIES

LENGTH: 0.76 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 8.00

for constructing the Resurfacing and Traffic Stripe on CR-2 (Cobbs Ford Road) from CR-75 (McQueen Smith Road) to SR-6 (US-82) in Prattville. Length 0.757 mi.

BRACKET ESTIMATE: $395,964 TO $483,956

VIEW ITEMS


083 . STPAA-7806(600) AUTAUGA COUNTY

LENGTH: 1.07 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-2 (Wetumpka Street) from the junction of CR-2 (North Washington Street) to the junction of SR-3 (US-31/South Memorial Drive) in Prattville. Length 1.072 mi.

BRACKET ESTIMATE: $226,491 TO $276,822

VIEW ITEMS


084 . STPNU-0714(250) BUTLER COUNTY

LENGTH: 11.20 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing and Traffic Stripe on CR-65 from the junction of CR-59 to the junction of CR-62. Length 11.203 mi.

BRACKET ESTIMATE: $911,618 TO $1,114,200

VIEW ITEMS


085 . STPNU-1009(203) & STPNU-1022(201) CHEROKEE COUNTY

LENGTH: 3.75 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-31 from the junction of SR-25 (US-411) to the junction of CR-16 west of Forney and on CR-69 from the junction of CR-118 to the junction of CR-487 in Centre. Length 3.750 mi.

BRACKET ESTIMATE: $427,582 TO $522,600

VIEW ITEMS


086 . STPNU-2214(250) CULLMAN COUNTY

LENGTH: 4.88 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-8 from the junction of CR-35 to the junction of SR-69 southwest of Dodge City. Length 4.882 mi.

BRACKET ESTIMATE: $699,847 TO $855,369

VIEW ITEMS


088 . STPNU-3114(250) GENEVA COUNTY

LENGTH: 4.22 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from the Florida State Line to SR-103 southeast of Slocomb. Length 4.220 mi.

BRACKET ESTIMATE: $671,419 TO $820,623

VIEW ITEMS


089 . STPNU-5100(205) MONTGOMERY COUNTY

LENGTH: 5.91 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $13.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-36 (Hayneville Ridge Road) from SR-6 (US-82) to the Bullock County Line. Length 5.905 mi.

BRACKET ESTIMATE: $767,971 TO $938,631

VIEW ITEMS


092 . STPOA-9441(605) DALE COUNTY

LENGTH: 0.65 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-59 from the intersection of SR-53 (US-231) to Hinton Waters Avenue in Midland City. Length 0.647 mi.

BRACKET ESTIMATE: $145,984 TO $178,424

VIEW ITEMS


093 . STPOA-9647(600) TUSCALOOSA COUNTY

LENGTH: 0.07 MILES.

WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, Bridge Culvert, and Striping) on Hunter Creek Road over Two Mile Creek in Northport. Length 0.069 mi.

BRACKET ESTIMATE: $321,223 TO $392,606

VIEW ITEMS


094 . ST-037-999-011 JEFFERSON COUNTY

LENGTH: 0.59 MILES.

WORKING DAYS: 150
COST OF PLANS: $44.00

for constructing the Additional Lanes on SR-150 from 0.062 miles west of Grove Boulevard to 0.450 miles east of I-459 and the Grade, Drain, Widening, Signing, Striping, and Signals on the I-459 Northbound Ramps in Hoover. Length 0.591 mi.

BRACKET ESTIMATE: $2,552,492 TO $3,119,712

VIEW ITEMS


096 . 99-408-462-013-312 MARENGO COUNTY

LENGTH: 0.07 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 9.00

for constructing the Culvert Extension on SR-13 (US-43) at MP 117.25 in Linden. Length 0.071 mi.

BRACKET ESTIMATE: $241,661 TO $295,364

VIEW ITEMS


097 . 99-505-690-950-301 TUSCALOOSA & CHILTON COUNTIES

WORKING DAYS: 50
COST OF PLANS: $11.00

for the Maintenance Bridge Painting on SR-22 and SR-6 (US-82) at sites as indicated in the plans.

BRACKET ESTIMATE: $356,944 TO $436,264

VIEW ITEMS


098 . 99-401-690-000-401 CULLMAN & MARSHALL COUNTIES

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for the Liter Collection and Maintenance Roadside Mowing at various sites in Cullman and Marshall Counties.

BRACKET ESTIMATE: $237,737 TO $290,567

VIEW ITEMS


099 . 99-401-690-000-402 BLOUNT & ST. CLAIR COUNTIES

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for the Liter Collection and Maintenance Roadside Mowing at various sites in Blount and St Clair Counties.

BRACKET ESTIMATE: $158,537 TO $193,767

VIEW ITEMS


100 . 99-401-690-000-403 DEKALB & JACKSON COUNTIES

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for the Liter Collection and Maintenance Roadside Mowing at various sites in DeKalb and Jackson Counties.

BRACKET ESTIMATE: $142,337 TO $173,967

VIEW ITEMS


101 . 99-401-690-000-404 BLOUNT & ST. CLAIR COUNTIES

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for the Liter Collection and Maintenance Roadside Mowing at various sites on I-20, I-59, and I-65.

BRACKET ESTIMATE: $249,437 TO $304,867

VIEW ITEMS


103 . 99-401-690-000-405 MADISON & JACKSON COUNTIES

WORKING DAYS: 24
COST OF PLANS: $ 4.00

for the Liter Collection and Maintenance Roadside Mowing at various sites on I-565 and SR-2.

BRACKET ESTIMATE: $106,337 TO $129,967

VIEW ITEMS


200 . STPAA-7819(600) AUTAUGA COUNTY

LENGTH: 1.37 MILES.

WORKING DAYS: 35
COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Shelia Boulevard from SR-3 (US-31/South Memorial Drive) to CR-2 (East Main Street) in Prattville. Length 1.371 mi.

BRACKET ESTIMATE: $473,258 TO $578,427

VIEW ITEMS

Return To: Top of this Page