Office Engineer

Proposal Letting List
April 04, 2014 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . BRF-0002(545) , LAUDERDALE 002 . BRF-0008(567) , LOWNDES
005 . ACAA58368-ATRP(001) , JEFFERSON 006 . ACAA59583-ATRP(001) , AUTAUGA
007 . ACNU59673-ATRP(002) , LIMESTONE 010 . ACBR58649-ATRP(001) , MADISON
014 . ACNU58342-ATRP(001) , DALLAS 015 . ACNU58411-ATRP(001) , CHILTON
016 . ACNU58489-ATRP(001) , LAMAR 018 . ACNU58659-ATRP(001) , ST. CLAIR
019 . ACNU59332-ATRP(001) , CHOCTAW 020 . ACNU59363-ATRP(001) , CULLMAN
021 . ACNU59388-ATRP(001) , GREENE 024 . ACOA58338-ATRP(001) , BUTLER
025 . ACOA58652-ATRP(001) , MARSHALL 026 . ACOA60250-ATRP(001) , LIMESTONE
027 . ACOA61154-ATRP(001) , BALDWIN 033 . DE-AL66(938) , ESCAMBIA
037 . HSIP-0012(558) , HOUSTON 041 . NH-0008(574) , MARENGO
042 . NH-0012(557) , HOUSTON 043 . NH-0013(590) , CLARKE
044 . NH-0013(591) , LAUDERDALE 045 . NH-0013(592) , FRANKLIN
046 . NH-0074(531) , WINSTON 047 . NH-0074(534) , BLOUNT
048 . NH-HSIP-0053(569) , MONTGOMERY 049 . NH-HSIP-0163(502) , MOBILE
052 . SRTS-SR11(906) , LOWNDES 055 . STPAA-0020(518) , LAUDERDALE
056 . STPAA-0051(511) , RUSSELL 057 . STPAA-0145(505) , CHILTON
058 . STPAA-0181(506) , BALDWIN 059 . STPAA-0195(503) , WALKER
060 . STPAA-0195(504) , WALKER 061 . STPAA-0281(501) , CLEBURNE *
063 . STPAA-HSIP-0010(536) , BARBOUR 064 . STPAA-HSIP-0041(513) , MONROE, etc.
065 . STPAA-HSIP-0047(504) , MONROE 066 . STPAA-HSIP-0054(500) , GENEVA
069 . STPAA-HSIP-0169(501) , RUSSELL, etc. 070 . STPAA-HSIP-0171(512) , FAYETTE
072 . STPAA-MR13(902) , CHEROKEE 075 . STPNU-0314(250) , BARBOUR
076 . STPNU-2414(250) , DALLAS 078 . STPNU-3914(250) , LAUDERDALE
081 . TCSP-12AL(001) , GENEVA 084 . 99-501-690-000-301 , CHEROKEE, etc.
200 . BRZ-6400(213) , WALKER 201 . STPNU-3025(203) , FRANKLIN

* - WITHDRAWN FROM LETTING


001 . BRF-0002(545) LAUDERDALE COUNTY

WORKING DAYS: 185
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $47.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, and Bridge Removal) on the Eastbound Lane of SR-2 (US-72) over Bluewater Creek east of Killen. Length 0.667 mi.

BRACKET ESTIMATE: $2,807,766 TO $3,431,714

VIEW ITEMS


002 . BRF-0008(567) LOWNDES COUNTY

LENGTH: 1.42 MILES.

WORKING DAYS: 180
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $40.00

for constructing the Bridge Replacement (Grade, Drain, Base, and Pave) on the Westbound Roadway of SR-8 (US-80) over Tallawassee Creek east of Lowndesboro. Length 1.419 mi.

BRACKET ESTIMATE: $2,846,815 TO $3,479,441

VIEW ITEMS


005 . ACAA58368-ATRP(001) JEFFERSON COUNTY

WORKING DAYS: 130
COST OF PLANS: $12.00

for constructing the Traffic Signal Installations on CR-118 (Fieldstown Road) from I-65 North to SR-3 (US-31) in Gardendale.

BRACKET ESTIMATE: $498,022 TO $608,694

VIEW ITEMS


006 . ACAA59583-ATRP(001) AUTAUGA COUNTY

LENGTH: 6.55 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-165 from SR-14 in Autaugaville to the intersection of SR-6 (US-82). Length 6.559 mi.

BRACKET ESTIMATE: $754,655 TO $922,356

VIEW ITEMS


007 . ACNU59673-ATRP(002) & ACAA59662-ATRP(002) LIMESTONE COUNTY

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on Elk River Mills Road from Baker Hill Road to Tillman Mill Road (Site #1); and on Nick Davis Road from Mooresville Road to Sanderson Road (Site #2). Length 7.972 mi.

BRACKET ESTIMATE: $1,187,775 TO $1,451,724

VIEW ITEMS


010 . ACBR58649-ATRP(001) MADISON COUNTY

LENGTH: 0.14 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Bridge Replacement (Grade, Drain, Base, Pave, and Bridge Removal) on CR-16 (Wall Triana Highway) over Mill Creek in Madison. Length 0.143 mi.

BRACKET ESTIMATE: $698,434 TO $853,642

VIEW ITEMS


014 . ACNU58342-ATRP(001) DALLAS COUNTY

LENGTH: 1.92 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing, Traffic Stripe, and Guardrail Installation on CR-115 from the junction of CR-988 to the intersection of CR-33 south of Orrville. Length 1.923 mi

BRACKET ESTIMATE: $331,303 TO $404,925

VIEW ITEMS


015 . ACNU58411-ATRP(001) CHILTON COUNTY

LENGTH: 1.40 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 7.00

for constructing the Resurfacing, Guardrail, Culvert Replacement, and Striping on CR-28 (Lake Mitchell Road) from Nell Street to just west of I-65. Length 1.403 mi.

BRACKET ESTIMATE: $371,454 TO $453,999

VIEW ITEMS


016 . ACNU58489-ATRP(001) LAMAR COUNTY

LENGTH: 12.71 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Leveling, Resurfacing, and Traffic Stripe on CR-49 from the intersection of CR-36 to the intersection CR-16 through Beaverton. Length 12.799 mi.

BRACKET ESTIMATE: $1,235,217 TO $1,509,710

VIEW ITEMS


018 . ACNU58659-ATRP(001) & ACNU59780-ATRP(001) ST. CLAIR COUNTY

LENGTH: 17.90 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Resurfacing and Traffic Stripe on CR-33 from SR-53 (US-231) to CR-24 and on CR-36 from SR-7 (US-11) to SR-23. Length 17.732 mi.

BRACKET ESTIMATE: $3,696,313 TO $4,517,715

VIEW ITEMS


019 . ACNU59332-ATRP(001) CHOCTAW COUNTY

LENGTH: 7.44 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-25 from the junction of CR-9 to the intersection of Copper Lane. Length 7.438 mi.

BRACKET ESTIMATE: $1,426,035 TO $1,742,931

VIEW ITEMS


020 . ACNU59363-ATRP(001) CULLMAN COUNTY

LENGTH: 0.80 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Patching, Leveling, Resurfacing, and Traffic Stripe on CR-1669 from the Fairview City Limits to the intersection of SR-69. Length 0.800 mi.

BRACKET ESTIMATE: $250,056 TO $305,624

VIEW ITEMS


021 . ACNU59388-ATRP(001) GREENE COUNTY

LENGTH: 14.67 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-181 from the SR-14 Interchange to the Pickens County Line. Length 14.673 mi.

BRACKET ESTIMATE: $2,486,490 TO $3,039,043

VIEW ITEMS


024 . ACOA58338-ATRP(001) BUTLER COUNTY

LENGTH: 1.58 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on Conecuh Street from SR-10 to SR-3 (US-31) in Greenville. Length 1.592 mi.

BRACKET ESTIMATE: $343,357 TO $419,659

VIEW ITEMS


025 . ACOA58652-ATRP(001) & ACOA58653-ATRP(001) MARSHALL COUNTY

LENGTH: 4.78 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-10 (Sundown Drive Northwest/7th Avenue Northwest) from SR-53 (US-231) to CR-2 (Hulaco Road) (Site #1); on CR-44 (Fry Gap Road) from CR-64 (Main Street) to the Arab City Limits (Site #2); and on 10th Street Northwest from SR-69 (Cullman Road) to CR-18 (12th Avenue) in Arab (Site #3). Length 4.783 mi.

BRACKET ESTIMATE: $915,441 TO $1,118,872

VIEW ITEMS


026 . ACOA60250-ATRP(001) LIMESTONE COUNTY

LENGTH: 3.13 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-83 (Lindsay Lane) from CR-24 (Huntsville-Brownsferry Road) to SR-251 in Athens. Length 3.128 mi.

BRACKET ESTIMATE: $661,521 TO $808,526

VIEW ITEMS


027 . ACOA61154-ATRP(001) BALDWIN COUNTY

LENGTH: 42.00 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on South Hoyle Avenue from CR-57 (Brady Road) to the L & N Railroad Right-Of-Way (ROW) in Bay Minette. Length 0.424 mi.

BRACKET ESTIMATE: $183,065 TO $223,746

VIEW ITEMS


033 . DE-AL66(938) ESCAMBIA COUNTY

LENGTH: 0.12 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $11.00

for constructing the Industrial Park Improvements (Grade, Drain, Base, and Pave) on Wind River Road Extension from CR-14 to Wind River Road South in Atmore. Length 0.093 mi.

BRACKET ESTIMATE: $318,997 TO $389,886

VIEW ITEMS


037 . HSIP-0012(558) HOUSTON COUNTY

LENGTH: 0.32 MILES.

WORKING DAYS: 30
COST OF PLANS: $11.00

for constructing the Superelevation Improvements on SR-12 (US-84) at Sanitary Dairy Road in Cowarts. Length 0.385 mi.

BRACKET ESTIMATE: $280,863 TO $343,276

VIEW ITEMS


041 . NH-0008(574) & 99-408-462-008-236 MARENGO COUNTY

LENGTH: 5.02 MILES.

WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from just east of CR-28 to 0.65 miles west of SR-13 (US-43) to include the Lime Stabilization of the Shoulders on SR-8 (US-80) from (MP 31.750) to (MP 33.990) in Demopolis. Length 2.510 mi.

BRACKET ESTIMATE: $1,584,391 TO $1,936,477

VIEW ITEMS


042 . NH-0012(557) HOUSTON COUNTY

LENGTH: 8.77 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $13.00

for constructing the Resurfacing and Traffic Stripe on SR-12 (US-84) from west of CR-75 to the east end of the Chattahoochee River Bridge and the Bridge Rail Retrofitting of the Westbound Lane of the Chattahoochee River Bridge. Length 8.768 mi.

BRACKET ESTIMATE: $3,349,112 TO $4,093,359

VIEW ITEMS


043 . NH-0013(590) CLARKE COUNTY

LENGTH: 8.26 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from 0.32 miles north of CR-3 (McVay Road ) to 0.15 miles north of CR-29. Length 8.261 mi.

BRACKET ESTIMATE: $3,141,939 TO $3,840,148

VIEW ITEMS


044 . NH-0013(591) LAUDERDALE COUNTY

LENGTH: 4.90 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-13 (US-43) from 0.40 miles north of SR-64 to the Tennessee State Line. Length 4.903 mi.

BRACKET ESTIMATE: $1,164,177 TO $1,422,883

VIEW ITEMS


045 . NH-0013(592) FRANKLIN COUNTY

LENGTH: 1.86 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-13 from 0.08 miles north of Old Tuscaloosa Road in Phil Campbell to 0.12 miles south of Sand Pit Road. Length 1.856 mi.

BRACKET ESTIMATE: $550,865 TO $673,279

VIEW ITEMS


046 . NH-0074(531) WINSTON COUNTY

LENGTH: 2.30 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from the Marion County Line (MP 26.090) to the intersection of SR-5 (MP 28.530) west of Natural Bridge. Length 2.298 mi.

BRACKET ESTIMATE: $775,122 TO $947,371

VIEW ITEMS


047 . NH-0074(534) BLOUNT COUNTY

LENGTH: 3.74 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on SR-74 (US-278) from just east of CR-36 to the Etowah County Line. Length 3.740 mi.

BRACKET ESTIMATE: $968,867 TO $1,184,170

VIEW ITEMS


048 . NH-HSIP-0053(569) & 99-406-513-053-402 MONTGOMERY COUNTY

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Planing, Safety Widening, Resurfacing, Pipe Extensions, Guardrail, and Traffic Stripe on SR-53 (US-231) from Athey Road (MP 101.000) to just south of SR-6 (US-82) (MP 105.330). Length 4.329 mi.

BRACKET ESTIMATE: $3,187,603 TO $3,895,959

VIEW ITEMS


049 . NH-HSIP-0163(502) MOBILE COUNTY

LENGTH: 2.48 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-163 from the junction of SR-193 to the south abutment of the Dog River Bridge east of Theodore. Length 2.482 mi

BRACKET ESTIMATE: $722,311 TO $882,824

VIEW ITEMS


052 . SRTS-SR11(906) LOWNDES COUNTY

WORKING DAYS: 45
COST OF PLANS: $15.00

for constructing the Sidewalk and Crosswalk Improvements along Various Routes in Fort Deposit. Length 0.540 mi.

BRACKET ESTIMATE: $201,083 TO $245,768

VIEW ITEMS


055 . STPAA-0020(518) LAUDERDALE COUNTY

LENGTH: 5.15 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-20 from Natchez Trace Parkway to 0.12 miles east of CR-222. Length 5.151 mi.

BRACKET ESTIMATE: $1,395,688 TO $1,705,841

VIEW ITEMS


056 . STPAA-0051(511) RUSSELL COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-51 from 0.14 miles south of CR-164 to the Lee County Line. Length 6.086 mi.

BRACKET ESTIMATE: $1,645,919 TO $2,011,678

VIEW ITEMS


057 . STPAA-0145(505) CHILTON COUNTY

LENGTH: 3.62 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-145 from just east of SR-3 (US-31) (MP 0.034) to the junction of I-65 (MP 3.677) in Clanton. Length 3.616 mi.

BRACKET ESTIMATE: $2,085,903 TO $2,549,437

VIEW ITEMS


058 . STPAA-0181(506) BALDWIN COUNTY

LENGTH: 1.39 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Planing, Resurfacing and Traffic Stripe on SR-181 from near SR-16 (US-90) (MP 16.493) to the intersection of SR-3 (US-31) (MP 18.260). Length 1.070 mi.

BRACKET ESTIMATE: $953,220 TO $1,165,047

VIEW ITEMS


059 . STPAA-0195(503) WALKER COUNTY

LENGTH: 5.80 MILES.

WORKING DAYS: 100
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on SR-195 from the junction of SR-5 (US-78) to 1.766 miles north of CR-27 (Falls City Road). Length 5.800 mi.

BRACKET ESTIMATE: $2,541,890 TO $3,106,755

VIEW ITEMS


060 . STPAA-0195 (504) WALKER COUNTY

LENGTH: 5.80 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-195 from 1.766 miles north of CR-27 (Falls City Road) to the Winston County Line. Length 5.798 mi.

BRACKET ESTIMATE: $1,714,884 TO $2,095,970

VIEW ITEMS


061 . STPAA-0281(501) CLEBURNE COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-281 from the Clay County Line to the south end of the overpass at CR-24 (MP 487.280) and the Guardrail Replacement on SR-281 (Scenic Byway). Length 20.167 mi.

BRACKET ESTIMATE: $1,584,087 TO $1,936,107

*** WITHDRAWN FROM LETTING ***

063 . STPAA-HSIP-0010(536) BARBOUR COUNTY

LENGTH: 5.49 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $10.00

for constructing the Planing, Safety Widening, Resurfacing and Traffic Stripe on SR-10 from the Pike County Line to Reynolds Street in Clio. Length 5.486 mi.

BRACKET ESTIMATE: $1,410,176 TO $1,723,549

VIEW ITEMS


064 . STPAA-HSIP-0041(513) & 99-408-663-041-315 MONROE & WILCOX COUNTIES

LENGTH: 6.56 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Safety Widening, Resurfacing and Traffic Stripe on SR-41 and Intersection Improvements at CR-8 from 0.055 miles south of the Monroe County Line to 1.340 miles north of CR-12. Length 6.553 mi.

BRACKET ESTIMATE: $1,036,821 TO $1,267,226

VIEW ITEMS


065 . STPAA-HSIP-0047(504) & STPAA-HSIP-0083(502) MONROE COUNTY

LENGTH: 4.93 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Safety Widening, Resurfacing and Traffic Stripe on SR-47 from 0.2 miles north of the intersection of CR-9 to 0.334 miles north of the intersection of SR-83 in Midway and on SR-83 from the Conecuh County Line to the intersection of SR-47 in Midway. Length 4.867 mi.

BRACKET ESTIMATE: $762,381 TO $931,800

VIEW ITEMS


066 . STPAA-HSIP-0054(500) , 99-407-312-054-801 & 99-507-312-054-801 GENEVA COUNTY

LENGTH: 6.75 MILES.

WORKING DAYS: 140
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $33.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-54 from the Covington County Line to the Pavement Joint just west of SR-52 and the Bridge Culvert Installation (Grade, Drain, Base, & Pave) at Various Locations on SR-54.

BRACKET ESTIMATE: $3,172,716 TO $3,877,764

VIEW ITEMS


069 . STPAA-HSIP-0169(501) RUSSELL & LEE COUNTIES

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-169 from the intersection SR-8 (US-80) to just west of CR-175. Length 5.745 mi.

BRACKET ESTIMATE: $2,112,284 TO $2,581,680

VIEW ITEMS


070 . STPAA-HSIP-0171(512) FAYETTE COUNTY

LENGTH: 7.94 MILES.

WORKING DAYS: 115
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $12.00

for constructing the Safety Widening, Resurfacing and Traffic Stripe on SR-171 from the Tuscaloosa County Line to 0.158 miles north of SR-159. Length 10.870 mi.

BRACKET ESTIMATE: $2,660,445 TO $3,251,654

VIEW ITEMS


072 . STPAA-MR13(902) CHEROKEE COUNTY

LENGTH: 2.95 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 8.00

for constructing the Resurfacing and Traffic Stripe on SR-283 from the intersection of SR-25 to the intersection of SR-68 in Centre (Site #1); on SR-68 from the intersection of SR-283 to the intersection of SR-9 in Centre (Site #2); and on SR-9 from the intersection of SR-68 to the end of the five-lane section of SR-9 in Cedar Bluff at MP 264.63 (Site #3). Length 2.950 mi.

BRACKET ESTIMATE: $1,827,511 TO $2,233,625

VIEW ITEMS


075 . STPNU-0314(250) BARBOUR COUNTY

LENGTH: 21.68 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 6.00

for constructing the Bituminous Surface Treatment and Traffic Stripe on CR-75 from the Henry County Line to the junction of SR-131 (Site #1); on CR-79 from the intersection of SR-1 (US-431) to the intersection of SR-131 (Site #2); on CR-24 (Bud Gary Road, Williams Mill Road, Jack Hightower Road) from the junction of SR-30 to the junction of CR-79 (Site #3); and on CR-28 (County Shop Road) from Browder Street in Clayton to CR-79 (Site #4). Length 21.678 mi.

BRACKET ESTIMATE: $545,666 TO $666,925

VIEW ITEMS


076 . STPNU-2414(250) DALLAS COUNTY

LENGTH: 2.18 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 from the northern Right-Of-Way (ROW) limits of the CSX Railroad near SR-22 to approximately 700 feet north of CR-188. Length 2.180 mi.

BRACKET ESTIMATE: $481,241 TO $588,183

VIEW ITEMS


078 . STPNU-3914(250) LAUDERDALE COUNTY

LENGTH: 6.17 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-2 from 0.60 miles east of CR-188 to CR-15 (Site 1); on CR-51 from CR-76 to CR-50 (Site 2); and on CR-89 from CR-50 to CR-505 (Site 3). Length 6.171 mi.

BRACKET ESTIMATE: $551,406 TO $673,941

VIEW ITEMS


081 . TCSP-12AL(001) GENEVA COUNTY

LENGTH: 0.08 MILES.

WORKING DAYS: 45
COST OF PLANS: $ 6.00

for constructing the Sidewalk Improvements and Street Lighting Updates on SR-52 (Main Street) from Ripley Street to Broad Street in Samson. Length 0.077 mi.

BRACKET ESTIMATE: $151,344 TO $184,976

VIEW ITEMS


084 . 99-501-690-000-301 CHEROKEE , CULLMAN & MARSHALL COUNTIES

LENGTH: 0.57 MILES.

WORKING DAYS: 150
COST OF PLANS: $18.00

for the Maintenance Bridge Painting along Various Routes within the First Division. Length 0.584 mi.

BRACKET ESTIMATE: $892,163 TO $1,090,421

VIEW ITEMS


200 . BRZ-6400(213) WALKER COUNTY

LENGTH: 0.02 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 4.00

for constructing the Partial Bridge Replacement of the Deteriorated Deck (Clean, Prime, Paint Steel Section of Bridge, and Guardrail Upgrade) on the Overtown Bridge over the Norfolk Southern Railroad on CR-179 (Plywood Plank Road). Length 0.057 mi.

BRACKET ESTIMATE: $226,478 TO $276,806

VIEW ITEMS


201 . STPNU-3025(203) FRANKLIN COUNTY

LENGTH: 2.70 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-48 from the Russellville City Limits to the intersection of CR-77. Length 2.700 mi.

BRACKET ESTIMATE: $475,017 TO $580,577

VIEW ITEMS