Office Engineer

019 . ACNU59768-ATRP(004) , DEKALB

COUNTY: DEKALB

WORKING DAYS: 35

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-479 from the Etowah County Line to the intersection of CR-26. Length 1.581 mi.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.

BRACKET ESTIMATE: $373,501 TO $456,501


THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:

ITEM CODE QUANTITY UNIT ITEM DESCRIPTION
206C010 6 SQYD Removing Concrete Driveway
405A000 1861 GAL Tack Coat
407B000 2 MILE Joint Sealant For Hot Mix Asphalt Pave
424A340 1468 TON Superpave Wrg Surf 1/2" ESAL A/B
424B636 2319 TON Superpave Upr Bndr Lay 1" Esal A/B
424B647 603 TON Superpave Upr Bndr Wide 1" Esal A/B
430B043 640 TON Agg Surf (1" Down, Crusher Run)
600A000 1 LS Mobilization
698A000 1 LS Construction Fuel (Maximum Bid Limited 20,000.00)
701A231 4 MILE Solid White Cl 2 Ty A Traf Str
701A235 4 MILE Solid Yellow Cl 2 Ty A Traf Str
701C001 4 MILE Solid Temporary Traffic Stripe
703A002 170 SQFT Traffic Control Marking, Class 2, Type A
705A037 208 EACH Pavement Markers, Class A-H, Type 2-D
740B000 213 SQFT Construction Signs
740O000 1 EACH Pilot Car