Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your comments.


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . ACIM59761-ATRP(001) , CULLMAN 002 . IM-HSIPF-I065(439) , CULLMAN, etc.
005 . BR-0002(550) , COLBERT, etc. 009 . HPP-0035(511) , MONTGOMERY
012 . ACBRZ58496-ATRP(001) , TUSCALOOSA 015 . ACNU58492-ATRP(010) , PERRY
016 . ACNU58530-ATRP(003) , COFFEE 019 . ACNU59362-ATRP(002) , CULLMAN
020 . ACNU59631-ATRP(001) , MACON 021 . ACNU59685-ATRP(010) , WINSTON
022 . ACNU59778-ATRP(004) , ST. CLAIR 023 . ACNU60416-ATRP(001) , COOSA
024 . ACNU60582-ATRP(002) , WINSTON 025 . ACNU60589-ATRP(001) , WINSTON
026 . ACNU60590-ATRP(001) , WINSTON 028 . ACOA61085-ATRP(001) , BARBOUR
029 . ACNU61172-ATRP(002) , CONECUH 030 . ACNU61365-ATRP(002) , MONROE
031 . ACNU61559-ATRP(016) , ESCAMBIA 032 . ACNU61063-ATRP(001) , COFFEE
034 . ACOA58535-ATRP(002) , HOUSTON 036 . ACOA58622-ATRP(001) , ETOWAH
038 . ACAA59567-ATRP(002) , LEE 039 . ACOA59568-ATRP(002) , LEE
040 . ACOA59680-ATRP(007) , MORGAN 041 . ACOA61155-ATRP(001) , BALDWIN
046 . CMAQ-9802(923) , JEFFERSON 048 . NH-0002(565) , COLBERT
049 . NH-0008(576) , RUSSELL 051 . NH-HSIP-0009(553) , MONTGOMERY
052 . NH-HSIP-0074(535) , CALHOUN 055 . SRTS-SR13(903) , JEFFERSON
061 . STPAA-0017(556) , MARION 062 . STPAA-0025(538) , CHEROKEE
063 . STPAA-0281(501) , CLEBURNE 064 . STPAA-HSIP-0004(539) , JEFFERSON
065 . STPAA-HSIP-0021(547) , WILCOX 066 . STPAA-HSIP-0056(502) , WASHINGTON
069 . STPNU-2414(251) , DALLAS 072 . STPOA-2813(250) , ETOWAH
075 . 99-506-690-000-302 , DALLAS, etc. 076 . 99-508-120-017-423 , CHOCTAW
077 . 99-508-601-059-323 , SUMTER

001 . ACIM59761-ATRP(001) CULLMAN COUNTY

LENGTH: 1.31 MILES.

WORKING DAYS: 250
DBE CONTRACT OBLIGATION: 9 % COST OF PLANS: $98.00

for constructing the Interchange (Grade, Drain, Base, Pave, Bridge Culvert Extension and Signs) on I-65 at CR-222 between SR-69 and SR-74 (US-278) in Cullman. Length 1.307 mi.

BRACKET ESTIMATE: $6,030,487 TO $7,370,595

VIEW ITEMS


002 . IM-HSIPF-I065(439) CULLMAN , MORGAN & LIMESTONE COUNTIES

LENGTH: 21.82 MILES.

WORKING DAYS: 120
COST OF PLANS: $ 6.00

for constructing the Median Crossover Protection on I-65 from the Underpass at CR-1223 (MP 313.10) to the Norfolk-Southern Railroad Overpass (MP 341.50) in Decatur. Length 21.919 mi.

BRACKET ESTIMATE: $1,984,174 TO $2,425,102

VIEW ITEMS


005 . BR-0002(550) COLBERT & LAUDERDALE COUNTIES

LENGTH: 0.39 MILES.

WORKING DAYS: 360
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $47.00

for constructing the Bridge Rehabilitation and Painting on SR-2 at the O'Neal Bridge over the Tennessee River. Length 0.392 miles.

BRACKET ESTIMATE: $7,675,587 TO $9,381,273

VIEW ITEMS


009 . HPP-0035(511) MONTGOMERY COUNTY

LENGTH: 2.91 KILOMETERS.

WORKING DAYS: 255
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $61.00

for constructing the Montgomery Outer Loop (Base, Pave, Signing and Traffic Stripe) from south of SR-110 thru the I-85 Interchange. Length 5.500 km.

BRACKET ESTIMATE: $14,653,014 TO $17,909,240

VIEW ITEMS


012 . ACBRZ58496-ATRP(001) TUSCALOOSA COUNTY

LENGTH: 0.01 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 6.00

for constructing the Bridge Replacement on CR-1323 (Moccasin Branch Road) over Unnamed Tributary. Length 0.007 mi.

BRACKET ESTIMATE: $197,178 TO $240,995

VIEW ITEMS


015 . ACNU58492-ATRP(010) PERRY COUNTY

LENGTH: 5.24 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $ 4.00

for constructing the Full Depth Reclamation, Resurfacing, Guardrail Replacement, and Traffic Stripe on CR-20 from the Hale County Line to the junction of CR-23. Length 5.247 mi.

BRACKET ESTIMATE: $1,102,921 TO $1,348,015

VIEW ITEMS


016 . ACNU58530-ATRP(003) , ACNU58532-ATRP(003) , ACNU58528-ATRP(003) , ACNU58509-ATRP(003) , ACNU58513-ATRP(003) & ACNU58508-ATRP(003) COFFEE COUNTY

LENGTH: 24.78 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $16.00

for constructing the Resurfacing and Traffic Stripe on CR-410 from SR-134 to CR-401; on CR-107 from CR-110 to SR-125; on CR-355/364 (Taylor Mill Road) from SR-141 to the Elba Bypass; on CR-107 from CR-105 to SR-51; on CR-330 from SR-189 to CR-306; and on CR-143 from the Dale County Line to SR-51. Length 24.784 mi.

BRACKET ESTIMATE: $3,049,250 TO $3,726,861

VIEW ITEMS


019 . ACNU59362-ATRP(002) CULLMAN COUNTY

LENGTH: 2.13 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-698/CR-55 from the junction of CR-691 to the junction of SR-91 in Holly Pond. Length 2.126 mi.

BRACKET ESTIMATE: $131,789 TO $161,075

VIEW ITEMS


020 . ACNU59631-ATRP(001) MACON COUNTY

LENGTH: 3.91 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-54 from the junction of SR-199 East to the Notasulga City Limits. Length 3.926 mi.

BRACKET ESTIMATE: $543,362 TO $664,110

VIEW ITEMS


021 . ACNU59685-ATRP(010) WINSTON COUNTY

LENGTH: 12.50 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-12 from the junction of CR-77 in Arley continuing approximately 10 miles around the southern loop of CR-12. Length 12.500 mi.

BRACKET ESTIMATE: $1,442,775 TO $1,763,392

VIEW ITEMS


022 . ACNU59778-ATRP(004) & ACNU59779-ATRP(001) ST. CLAIR COUNTY

LENGTH: 9.90 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on CR-27 (Wolf Creek Road South) from the Shelby County Line to the junction of CR-375 (Cook Springs Cut Off Road) and on CR-54 (Logan Martin Dam Road) from the Logan Martin Dam to the junction of SR-53 (US-231/Martin Street). Length 9.880 mi.

BRACKET ESTIMATE: $1,994,268 TO $2,437,439

VIEW ITEMS


023 . ACNU60416-ATRP(001) COOSA COUNTY

LENGTH: 4.88 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-5 from the junction of CR-125 to the Talladega County Line. Length 4.899 mi.

BRACKET ESTIMATE: $624,143 TO $762,842

VIEW ITEMS


024 . ACNU60582-ATRP(002) WINSTON COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-69 (Newberg Road) from 11th Avenue to the Franklin County Line. Length 6.201 mi.

BRACKET ESTIMATE: $1,140,554 TO $1,394,010

VIEW ITEMS


025 . ACNU60589-ATRP(001) WINSTON COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-19 and CR-32 from the junction of SR-195 near Haleyville to the junction of CR-15. Length 4.679 mi.

BRACKET ESTIMATE: $507,303 TO $620,037

VIEW ITEMS


026 . ACNU60590-ATRP(001) WINSTON COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-32 from the junction of CR-55 to the junction of SR-195 near Double Springs. Length 3.378 mi.

BRACKET ESTIMATE: $388,546 TO $474,890

VIEW ITEMS


028 . ACOA61085-ATRP(001) , ACOA61086-ATRP(001) & ACOA61087-ATRP(001) BARBOUR COUNTY

LENGTH: 15.43 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-97 (Gammage Road), CR-93 (Fox Ridge Road), and CR-32 (Cottonhill Road) in Eufaula as indicated in the plans. Length 8.976 mi.

BRACKET ESTIMATE: $1,319,614 TO $1,612,861

VIEW ITEMS


029 . ACNU61172-ATRP(002) CONECUH COUNTY

LENGTH: 24.04 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-6, CR-5, CR-7, CR-49, CR-73, and CR-95 as indicated in the plans. Length 24.038 mi.

BRACKET ESTIMATE: $2,750,484 TO $3,361,702

VIEW ITEMS


030 . ACNU61365-ATRP(002) MONROE COUNTY

LENGTH: 5.05 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-23 from the Frisco City Limits to the junction of SR-12 (US-84). Length 5.053 mi.

BRACKET ESTIMATE: $1,009,803 TO $1,234,204

VIEW ITEMS


031 . ACNU61559-ATRP(016) ESCAMBIA COUNTY

LENGTH: 2.93 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Old US-31 (Section located on the west side of the existing SR-3/US-31) from the junction of SR-3 (US-31) north of Pollard to the junction of SR-3 (US-31) near Keego. Length 2.935 mi.

BRACKET ESTIMATE: $492,135 TO $601,499

VIEW ITEMS


032 . ACNU61063-ATRP(001) COFFEE COUNTY

LENGTH: 27.97 MILES.

WORKING DAYS: 60
COST OF PLANS: $ 6.00

for constructing the Micro-Surfacing Treatment and Traffic Stripe on Various County Routes as indicated in the plans. Length 27.965 mi.

BRACKET ESTIMATE: $1,180,625 TO $1,442,986

VIEW ITEMS


034 . ACOA58535-ATRP(002) , ACOA58534-ATRP(002) & ACOA61074-ATRP(015) HOUSTON COUNTY

LENGTH: 11.38 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on CR-44 (Glen Lawrence Road) from Jordan Avenue to Brackin Road in Cowarts (Site #1); on CR-15 (South Park Avenue) from Malvern Road to National Guard Road in Dothan (Site #2); and on Webb Road from Ross Clark Circle in Dothan to the Webb Town Limits (Site #3). Length 11.378 mi.

BRACKET ESTIMATE: $1,911,215 TO $2,335,930

VIEW ITEMS


036 . ACOA58622-ATRP(001) ETOWAH COUNTY

LENGTH: 0.14 MILES.

WORKING DAYS: 150
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $21.00

for constructing the Intersection Improvements on CR-125 (Mountainboro Road) at SR-1 (US-431). Length 0.137 mi.

BRACKET ESTIMATE: $776,252 TO $948,753

VIEW ITEMS


038 . ACAA59567-ATRP(002) LEE COUNTY

LENGTH: 7.24 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-158 from the junction of CR-183 to the junction of CR-379. Length 7.244 mi.

BRACKET ESTIMATE: $2,148,335 TO $2,625,743

VIEW ITEMS


039 . ACOA59568-ATRP(002) LEE COUNTY

LENGTH: 8.72 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-146 (Moore's Mill Road) from the Auburn City Limits to the junction of SR-169. Length 8.744 mi.

BRACKET ESTIMATE: $1,324,959 TO $1,619,394

VIEW ITEMS


040 . ACOA59680-ATRP(007) MORGAN COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 8.00

for constructing the Bridge Replacement on CR-426 (Cave Springs Road) over Ginhouse Branch in Priceville. Length 0.025 mi.

BRACKET ESTIMATE: $243,392 TO $297,479

VIEW ITEMS


041 . ACOA61155-ATRP(001) BALDWIN COUNTY

WORKING DAYS: 95
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $14.00

for constructing the Resurfacing and Traffic Stripe on Windsor Drive and Ridgewood Drive from North Main Street to Bayview Drive in Daphne. Length 1.226 mi.

BRACKET ESTIMATE: $1,444,247 TO $1,765,191

VIEW ITEMS


046 . CMAQ-9802(923) JEFFERSON COUNTY

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $12.00

for constructing the Trussville Greenway and Walking Multi-Use Trail along the Cahaba River in Civitan Park. Length 0.055 mi.

BRACKET ESTIMATE: $359,080 TO $438,876

VIEW ITEMS


048 . NH-0002(565) COLBERT COUNTY

LENGTH: 2.89 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from 0.26 miles east of CR-1 to just east of CR-5 (MP 5.300). Length 2.889 miles.

BRACKET ESTIMATE: $1,393,131 TO $1,702,716

VIEW ITEMS


049 . NH-0008(576) RUSSELL COUNTY

LENGTH: 2.41 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from SR-1 (US-431) to the Georgia State Line. Length 2.409 mi.

BRACKET ESTIMATE: $1,549,406 TO $1,893,718

VIEW ITEMS


051 . NH-HSIP-0009(553) MONTGOMERY COUNTY

WORKING DAYS: 85
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Planing, Safety Widening, Resurfacing, and Traffic Stripe on SR-9 (US-331) from the Crenshaw County Line to the beginning of the 4-Lane Section (MP 83.500). Length 9.506 mi.

BRACKET ESTIMATE: $2,907,044 TO $3,553,054

VIEW ITEMS


052 . NH-HSIP-0074(535) CALHOUN COUNTY

LENGTH: 7.04 MILES.

WORKING DAYS: 65
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from the Etowah County Line to SR-200 (MP 155.576). Length 7.041 mi.

BRACKET ESTIMATE: $2,726,173 TO $3,331,989

VIEW ITEMS


055 . SRTS-SR13(903) JEFFERSON COUNTY

LENGTH: 0.37 MILES.

WORKING DAYS: 45
COST OF PLANS: $12.00

for constructing the Sidewalk Improvements along 12th Avenue North at Abrams Elementary School in Bessemer. Length 0.365 mi.

BRACKET ESTIMATE: $121,651 TO $148,685

VIEW ITEMS


061 . STPAA-0017(556) MARION COUNTY

LENGTH: 0.42 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-17 from the junction of Old Hackleburg Road to 70 feet east of North Street in Hackleburg. Length 0.416 mi.

BRACKET ESTIMATE: $196,027 TO $239,588

VIEW ITEMS


062 . STPAA-0025(538) & 99-501-105-025-401 CHEROKEE COUNTY

LENGTH: 16.66 MILES.

WORKING DAYS: 115
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $15.00

for constructing the Culvert Extensions, Resurfacing and Traffic Stripe on SR-25 (US-411) from CR-161 to the Georgia State Line. Length 8.350 mi.

BRACKET ESTIMATE: $2,726,120 TO $3,331,924

VIEW ITEMS


063 . STPAA-0281(501) & 99-404-154-281-402 CLEBURNE COUNTY

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-281 from the Clay County Line to the south end of the bridge overpass at CR-24 (MP 487.280) and the Guardrail Replacement on SR-281 (Scenic Byway). Length 20.167 mi.

BRACKET ESTIMATE: $1,584,087 TO $1,936,107

VIEW ITEMS


064 . STPAA-HSIP-0004(539) JEFFERSON COUNTY

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 7.00

for constructing the Safety Widening, Planing, Resurfacing, Traffic Stripe, Guardrail End Anchor Replacement, and Bridge Rail Retrofit on SR-4 (US-78) from 19th Street in Irondale to 0.147 miles west of I-20. Length 6.716 mi.

BRACKET ESTIMATE: $3,479,430 TO $4,252,637

VIEW ITEMS


065 . STPAA-HSIP-0021(547) WILCOX COUNTY

LENGTH: 5.09 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 6.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-21 from 100 feet north of SR-10 in Oak Hill to the junction of SR-28. Length 5.093 mi.

BRACKET ESTIMATE: $1,114,763 TO $1,362,488

VIEW ITEMS


066 . STPAA-HSIP-0056(502) WASHINGTON COUNTY

LENGTH: 12.95 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-56 from the Mississippi State Line to just east of the intersection of CR-1 in Chatom. Length 12.948 mi.

BRACKET ESTIMATE: $1,600,380 TO $1,956,019

VIEW ITEMS


069 . STPNU-2414(251) DALLAS COUNTY

LENGTH: 5.32 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-37 from the intersection of CR-16 to the junction of CR-222. Length 5.321 mi.

BRACKET ESTIMATE: $859,460 TO $1,050,451

VIEW ITEMS


072 . STPOA-2813(250) ETOWAH COUNTY

LENGTH: 4.18 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic on CR-162 (Steel Station Road) from the intersection of CR-56 (Pleasant Valley Road) to the intersection of SR-77. Length 4.180 mi.

BRACKET ESTIMATE: $1,308,227 TO $1,598,944

VIEW ITEMS


075 . 99-506-690-000-302 DALLAS & MONTGOMERY COUNTIES

WORKING DAYS: 130
COST OF PLANS: $ 2.00

for the Maintenance Bridge Painting on various structures within the Sixth Division.

BRACKET ESTIMATE: $1,045,685 TO $1,278,059

VIEW ITEMS


076 . 99-508-120-017-423 CHOCTAW COUNTY

LENGTH: 0.10 MILES.

WORKING DAYS: 50
COST OF PLANS: $ 7.00

for the Bridge Coating on SR-17 at Yantley and Souwilpa Creeks.

BRACKET ESTIMATE: $381,515 TO $466,297

VIEW ITEMS


077 . 99-508-601-059-323 SUMTER COUNTY

WORKING DAYS: 100
COST OF PLANS: $ 9.00

for the Bridge Coating at various bridges on I-20/59.

BRACKET ESTIMATE: $870,045 TO $1,063,389

VIEW ITEMS