August 29, 2014 Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work for each proposal in the Letting by clicking on the View Items hyperlink to view the Project Item Pages. Please take a minute to review these pages and e-mail us with your


The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size only. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


001 . IM-I022(302) , MARION 003 . BRF-0013(540) , GREENE
007 . STPAA-HPP-0901(501) , CALHOUN 009 . ACAA58374-ATRP(004) , SHELBY*
010 . ACAA60110-ATRP(005) , SHELBY 011 . ACAA61184-ATRP(006) , MOBILE
014 . ACNU58644-ATRP(001) , JACKSON 015 . ACNU59393-ATRP(005) , LAMAR
016 . ACNU60912-ATRP(005) , LAMAR 017 . ACNU60913-ATRP(006) , LAMAR
018 . ACNU60914-ATRP(008) , LAMAR 023 . ACNU61277-ATRP(006) , JACKSON
024 . ACNU61815-ATRP(007) , MORGAN 025 . ACNU61989-ATRP(006) , ESCAMBIA
028 . ACOA59758-ATRP(006) , CULLMAN 030 . ACOA61309-ATRP(003) , MARSHALL
031 . ACNU61558-ATRP(003) , ESCAMBIA 032 . ACOA61560-ATRP(004) , ESCAMBIA
033 . ACOA62332-ATRP(007) , FRANKLIN 038 . BR-0055(500) , COVINGTON
039 . BR-4914(251) , MOBILE 040 . BR-7940(601) , TUSCALOOSA
041 . DE-A105(906) , MADISON 046 . NH-HSIP-0008(572) , LOWNDES
049 . SRTS-SR13(905) , SHELBY 053 . STPAA-0075(525) , BLOUNT
056 . STPAA-0017(557) , PICKENS 057 . STPAA-HSIP-0085(502) , DALE
058 . STPAA-HSIP-0087(513) , COFFEE 061 . EB-MR13(903) , BLOUNT, etc.
063 . STPNU-1414(250) , CLAY 064 . STPOA-1714(250) , COLBERT
065 . STPOA-1714(251) , COLBERT 066 . STPNU-2114(250) , CRENSHAW
067 . RECA-2913(256) , FAYETTE 068 . STPNU-3314(251) , HALE
069 . STPNU-3314(252) , HALE 072 . STPOA-4614(250) , MARENGO
073 . STPOA-7407(601) , CALHOUN 074 . STPOA-UR13(600) , COLBERT
077 . 99-508-134-000-420 , CLARKE 200 . SRTS-SR13(906) , JEFFERSON
*- -WITHDRAWN FROM THE LETTING

001 . IM-I022(302) MARION COUNTY

LENGTH: 10.90 MILES.

WORKING DAYS: 110
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Replacement of Failed Safety Layers on I-22 from just west of Reese Road (MP 6.000) to just west of the SR-171 overpass at MP 16.800. Length 10.902 mi.

BRACKET ESTIMATE: $5,458,837 TO $6,671,912

VIEW ITEMS


003 . BRF-0013(540) GREENE COUNTY

LENGTH: 7.50 MILES.

WORKING DAYS: 290
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $62.00

for constructing the Bridge Replacements (Grade, Drain, Base, and Pave) on SR-13 (US-43) over Needham Creek, Culpepper Creek, and Stephens Creek. Length 1.237 mi.

BRACKET ESTIMATE: $6,606,846 TO $8,075,034

VIEW ITEMS


007 . STPAA-HPP-0901(501) CALHOUN COUNTY

WORKING DAYS: 80
COST OF PLANS: $ 7.00

for constructing the Golden Springs Branch Detention Pond, to include Modified Inlet Structures and Fencing on the Anniston East Bypass from north of Choccolocco Road to south of Lake Yahoo.

BRACKET ESTIMATE: $384,601 TO $470,067

VIEW ITEMS


009 . ACAA58374-ATRP(004) SHELBY COUNTY

LENGTH: 2.26 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $51.00

for constructing the Resurfacing and Traffic Stripe on CR-353 (Hugh Daniel Drive) from approximately 4000 feet east of the junction of SR-38 (US-280) to the junction of CR-41 (Dunavant Road) in Hoover. Length 2.260 mi

BRACKET ESTIMATE: $853,279 TO $1,042,897

**WITHDRAWN FROM THE LETTING**
 

010 . ACAA60110-ATRP(005) SHELBY COUNTY

LENGTH: 8.52 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-47 (Chelsea Road) from the intersection of SR-25 in Columbiana to the junction of CR-49 south of Chelsea. Length 8.523 mi.

BRACKET ESTIMATE: $1,798,553 TO $2,198,232

VIEW ITEMS


011 . ACAA61184-ATRP(006) MOBILE COUNTY

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on Juniper Avenue from the junction of SR-13 (US-43) to the junction of Aaron Drive in Satsuma. Length 0.865 mi.

BRACKET ESTIMATE: $240,595 TO $294,061

VIEW ITEMS


014 . ACNU58644-ATRP(001) JACKSON COUNTY

LENGTH: 4.21 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-67 from a point west of Section for a distance of approximately 4.214 miles to the junction of Lakeshore Drive in Langston. Length 4.214 mi.

BRACKET ESTIMATE: $678,425 TO $829,186

VIEW ITEMS


015 . ACNU59393-ATRP(005) LAMAR COUNTY

LENGTH: 6.27 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from the junction of CR-20 to the intersection of SR-18 east of Vernon. Length 6.269 mi.

BRACKET ESTIMATE: $661,975 TO $809,080

VIEW ITEMS


016 . ACNU60912-ATRP(005) LAMAR COUNTY

LENGTH: 7.43 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-41 from the Fayette County Line to the junction of SR-18. Length 7.429 mi.

BRACKET ESTIMATE: $1,513,694 TO $1,850,070

VIEW ITEMS


017 . ACNU60913-ATRP(006) LAMAR COUNTY

LENGTH: 4.12 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from the intersection of SR-18 to the intersection of CR-9 (Blooming Grove Road). Length 4.120 mi.

BRACKET ESTIMATE: $445,442 TO $544,430

VIEW ITEMS


018 . ACNU60914-ATRP(008) LAMAR COUNTY

LENGTH: 2.05 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-75 (Liberty Road) from the Pickens County Line to the junction of SR-96 west of Millport. Length 2.053 mi.

BRACKET ESTIMATE: $269,374 TO $329,234

VIEW ITEMS


023 . ACNU61277-ATRP(006) JACKSON COUNTY

LENGTH: 1.85 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-5 from the Madison County Line to the junction of SR-2 (US-72). Length 1.849 mi.

BRACKET ESTIMATE: $299,436 TO $365,977

VIEW ITEMS


024 . ACNU61815-ATRP(007) MORGAN COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-35 from the Cullman County Line to the intersection of CR-55 in Eva. Length 1.900 mi.

BRACKET ESTIMATE: $291,566 TO $356,359

VIEW ITEMS


025 . ACNU61989-ATRP(006) ESCAMBIA COUNTY

LENGTH: 3.10 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-47 (Three Mile Road) from the Baldwin County Line to the intersection of CR-1 (Jack Springs Road). Length 3.068 mi.

BRACKET ESTIMATE: $445,926 TO $545,020

VIEW ITEMS


028 . ACOA59758-ATRP(006) CULLMAN COUNTY

LENGTH: 8.85 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-1435 from the intersection of SR-157 to the Morgan County Line. Length 8.851 mi.

BRACKET ESTIMATE: $1,463,271 TO $1,788,443

VIEW ITEMS


030 . ACOA61309-ATRP(003) MARSHALL COUNTY

LENGTH: 2.60 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-44 (Fry Gap Road) from the Arab City Limits to the junction of CR-49 (Thompson Falls Road). Length 2.600 mi.

BRACKET ESTIMATE: $358,001 TO $437,557

VIEW ITEMS


031 . ACNU61558-ATRP(003) ESCAMBIA COUNTY

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-30 (Huxford Road) from the intersection of SR-21 to the intersection of CR-45 (Butler Street) in Huxford. Length 2.491 mi.

BRACKET ESTIMATE: $400,603 TO $489,626

VIEW ITEMS


032 . ACOA61560-ATRP(004) ESCAMBIA COUNTY

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on Sowell Road from the Brewton City Limits to the intersection of CR-7 (Kirkland Road) (Site #1) and on CR-7 (Kirkland Road), Sybil Lane, and CR-9 (Old Castleberry Road) from the Brewton City Limits on CR-7 to the Brewton City Limits on CR-9 (Site #2). Length 3.143 mi.

BRACKET ESTIMATE: $546,436 TO $667,867

VIEW ITEMS


033 . ACOA62332-ATRP(007) FRANKLIN COUNTY

LENGTH: 3.15 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 2.00

for constructing the Resurfacing and Traffic Stripe on CR-54 (Underwood Road) from the junction of SR-17 (US-43) to the intersection of CR-48 and CR-77 in Russellville. Length 3.152 mi.

BRACKET ESTIMATE: $386,685 TO $472,616

VIEW ITEMS


038 . BR-0055(500) COVINGTON COUNTY

LENGTH: 0.26 MILES.

WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $25.00

for constructing the Bridge Removal and Replacement (Grade, Drain, Base, and Pave) on SR-55 over Jackson Pond in Lockhart. Length 0.264 mi.

BRACKET ESTIMATE: $1,464,333 TO $1,789,740

VIEW ITEMS


039 . BR-4914(251) MOBILE COUNTY

LENGTH: 0.29 MILES.

WORKING DAYS: 195
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $15.00

for constructing the Bridge Replacement and Approaches on CR-28 (Old Pascagoula Road) over Jackson Creek. Length 0.289 mi.

BRACKET ESTIMATE: $1,239,173 TO $1,514,545

VIEW ITEMS


040 . BR-7940(601) TUSCALOOSA COUNTY

LENGTH: 0.16 MILES.

WORKING DAYS: 230
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $36.00

for constructing the Bridge Replacement on SR-215 over the Kansas City Southern Railway and 19th Avenue East. Length 0.265 mi.

BRACKET ESTIMATE: $4,643,168 TO $5,674,983

VIEW ITEMS


041 . DE-A105(906) MADISON COUNTY

LENGTH: 0.26 MILES.

WORKING DAYS: 90
DBE CONTRACT OBLIGATION: 2 % COST OF PLANS: $25.00

for constructing the Streetscape and Safety Improvements on CR-74 (Providence Main Street) from the bridge over Dry Creek to the intersection of Biltmore Drive in Huntsville. Length 0.255 mi.

BRACKET ESTIMATE: $822,843 TO $1,005,697

VIEW ITEMS


046 . NH-HSIP-0008(572) LOWNDES COUNTY

LENGTH: 5.87 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the end of the project limits of Old Town Creek (MP 100.143) to the Selma - Montgomery Trail Interpretive Center (MP 106.018). Length 5.874 mi.

BRACKET ESTIMATE: $2,123,081 TO $2,594,877

VIEW ITEMS


049 . SRTS-SR13(905) SHELBY COUNTY

WORKING DAYS: 30
COST OF PLANS: $12.00

for constructing the Sidewalks along Island Street and Park Road at Montevallo Elementary School in Montevallo. Length 0.250 mi.

BRACKET ESTIMATE: $122,475 TO $149,691

VIEW ITEMS


053 . STPAA-0075(525) BLOUNT COUNTY

LENGTH: 3.31 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on SR-75 from the intersection of SR-74 (US-278) in Snead to the Marshall County Line. Length 3.307 mi.

BRACKET ESTIMATE: $569,021 TO $695,470

VIEW ITEMS


056 . STPAA-0017(557) PICKENS COUNTY

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $11.00

for constructing the Resurfacing and Traffic Stripe on SR-17 from the North City Limits of Carrollton (MP 201.234) to north of the intersection of 18th Avenue Southwest (MP 208.250) in Reform. Length 7.015 mi.

BRACKET ESTIMATE: $1,177,409 TO $1,439,055

VIEW ITEMS


057 . STPAA-HSIP-0085(502) DALE COUNTY

LENGTH: 2.89 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 9.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-85 from the intersection of SR-167 to the junction of SR-92 in Clayhatchee. Length 2.880 mi.

BRACKET ESTIMATE: $1,093,600 TO $1,336,622

VIEW ITEMS


058 . STPAA-HSIP-0087(513) COFFEE COUNTY

LENGTH: 7.68 MILES.

WORKING DAYS: 80
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $12.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-87 from the junction SR-134 to the junction of SR-12 (US-84) in Elba. Length 7.675 mi.

BRACKET ESTIMATE: $2,967,653 TO $3,264,419

VIEW ITEMS


061 . EB-MR13(903) BLOUNT & JACKSON COUNTIES

WORKING DAYS: 45
COST OF PLANS: $ 8.00

for the Demolition and Removal of Structures on SR-35 in Section and SR-160 in Hayden.

BRACKET ESTIMATE: $86,510 TO $105,734

VIEW ITEMS


063 . STPNU-1414(250) CLAY COUNTY

LENGTH: 5.66 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-7 from the intersection of SR-148 to the junction of CR-18. Length 5.662 mi.

BRACKET ESTIMATE: $633,065 TO $773,746

VIEW ITEMS


064 . STPOA-1714(250) COLBERT COUNTY

LENGTH: 4.19 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-24 (6th Street) east of Muscle Shoals from the pavement joint near Cave Springs Church to the intersection of CR-48 (County Line Road). Length 4.187 mi.

BRACKET ESTIMATE: $293,952 TO $359,275

VIEW ITEMS


065 . STPOA-1714(251) COLBERT COUNTY

LENGTH: 1.18 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-40 (Foster Mill Road) from the junction of River Road to Town Creek. Length 1.284 mi.

BRACKET ESTIMATE: $130,878 TO $159,962

VIEW ITEMS


066 . STPNU-2114(250) , STPNU-2114(251) & STPNU-2114(252) CRENSHAW COUNTY

LENGTH: 13.18 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-7 (Hickory Grove Road) from the intersection of SR-10 to the junction of Center Ridge Road (Site #1); on CR-50 (Campground Church Road) from the junction of CR-59 to the intersection of SR-10 (US-29) (Site #2); and on CR-59 (Petrey Highway) from the Luverne City Limits to CR-50 (Live Oak Road) (Site# 3). Length 13.309 mi.

BRACKET ESTIMATE: $1,254,043 TO $1,532,719

VIEW ITEMS


067 . RECA-2913(256) FAYETTE COUNTY

LENGTH: 4.24 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $ 3.00

for constructing the Resurfacing, Guardrail Installation, and Traffic Stripe on CR-12 from the intersection of SR-171 to the junction of CR-35. Length 4.241 mi.

BRACKET ESTIMATE: $882,079 TO $1,078,096

VIEW ITEMS


068 . STPNU-3314(251) HALE COUNTY

LENGTH: 2.68 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-7 from the junction of SR-61 to the intersection of SR-14 east of Greensboro. Length 2.678 mi.

BRACKET ESTIMATE: $310,249 TO $379,194

VIEW ITEMS


069 . STPNU-3314(252) HALE COUNTY

LENGTH: 3.74 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-15 from the junction of Lock 6 Road to the junction of SR-14 in Sawyerville. Length 3.735 mi.

BRACKET ESTIMATE: $409,547 TO $500,557

VIEW ITEMS


072 . STPOA-4614(250) MARENGO COUNTY

LENGTH: 3.00 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-21 from the junction CR-19 to the junction of SR-8 (US-80) in Demopolis. Length 2.996 mi.

BRACKET ESTIMATE: $910,606 TO $1,112,962

VIEW ITEMS


073 . STPOA-7407(601) CALHOUN COUNTY

WORKING DAYS: 70
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $20.00

for constructing the Safety Improvements (Resurfacing, Drainage, Guardrail, Striping, and Signing) on CR-198 (Greenbrier Dear Road) from west of Christine Avenue to Hillyer Robinson Industrial Parkway in Anniston. Length 1.047 mi.

BRACKET ESTIMATE: $933,082 TO $1,140,433

VIEW ITEMS


074 . STPOA-UR13(600) COLBERT COUNTY

LENGTH: 5.37 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe at Various Sites in Muscle Shoals as indicated in the plans. Length 5.368 mi.

BRACKET ESTIMATE: $608,422 TO $743,627

VIEW ITEMS


077 . 99-508-134-000-420 CLARKE COUNTY

LENGTH: 0.16 MILES.

WORKING DAYS: 40
COST OF PLANS: $ 9.00

for constructing the Guardrail Installation on SR-69 at Tallahatta Creek (Site #1) and Bashi Creek (Site #2) and on SR-154 at Morgan Creek (Site #3).

BRACKET ESTIMATE: $214,253 TO $261,865

VIEW ITEMS


200 . SRTS-SR13(906) JEFFERSON COUNTY

LENGTH: 0.21 MILES.

WORKING DAYS: 30
COST OF PLANS: $12.00

for constructing the Sidewalks at Pinson High School. Length 0.210 mi.

BRACKET ESTIMATE: $108,007 TO $132,008

VIEW ITEMS