007 . NHF-0006(521) , PICKENS 008 . NHF-BRF-0210(506) , HOUSTON
010 . ACAA58374-ATRP(004) , SHELBY 011 . ACAA59028-ATRP(007) , MADISON
014 . ACAA61006-ATRP(008) , JEFFERSON 017 . ACAA62032-ATRP(003) , JEFFERSON
023 . ACNU58480-ATRP(003) , LAMAR 024 . ACNU59441-ATRP(010) , TALLADEGA
025 . ACNU59550-ATRP(002) , CLAY 026 . ACNU61045-ATRP(003) , DALLAS
* 027 . ACNU61163-ATRP(001) , BALDWIN 028 . ACNU61249-ATRP(006) , CHEROKEE
029 . ACNU61278-ATRP(007) , JACKSON 030 . ACNU61305-ATRP(007) , MARSHALL
031 . ACNU61855-ATRP(005) , LIMESTONE 035 . ACOA59426-ATRP(004) , BALDWIN
036 . ACOA59521-ATRP(003) , BALDWIN 037 . ACOA59592-ATRP(003) , DALLAS
038 . ACOA59759-ATRP(001) , CULLMAN 039 . ACOA59767-ATRP(004) , DEKALB
040 . ACOA61308-ATRP(002) , MARSHALL 041 . ACOA61319-ATRP(007) , MARSHALL
042 . ACOA61557-ATRP(004) , ESCAMBIA 043 . ACOA61853-ATRP(003) , COFFEE
047 . BR-0075(511) , MARSHALL 050 . BRZ-1613(250) , COFFEE
** 053 . ERPR-8930(921) , CONECUH, etc. 056 . HRRR-3614(250) , JACKSON
059 . NH-HSIP-0020(516) , COLBERT 061 . SRTS-SR12(913) , JEFFERSON
062 . STPAA-0017(560) , FRANKLIN, etc. 063 . STPAA-0243(502) , FRANKLIN
064 . STPAA-7804(603) , AUTAUGA 070 . STPNU-1014(250) , CHEROKEE
074 . STPOA-8817(600) , COLBERT 077 . 99-406-261-231-402 , ELMORE
078 . 99-506-690-000-401 , BUTLER, etc. 079 . 99-507-690-000-401 , BARBOUR, etc.

* WITHDRAWN FROM THE LETTING
**ALL BIDS REJECTED

007 . NHF-0006(521) PICKENS COUNTY
LENGTH: 5.17 MILES. WORKING DAYS: 470
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $100

for constructing the Additional Lanes and Bridge Culvert Extension (Grade, Drain, Base, and Pave) on SR-6 (US-82) from the east end of the Lubbub Creek Bridge in Reform to the 4-Lane Section west of Gordo. Length 5.173 mi.

BRACKET ESTIMATE: $26,459,443 TO $32,339,319

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


008 . NHF-BRF-0210(506) HOUSTON COUNTY
LENGTH: 0.58 MILES. WORKING DAYS: 235
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $67.00

for constructing the Bridge (Grade, Drain, Base, Pave, and Signals) over the existing Bridge Culvert on SR-210 (US-84/US-231/Ross Clark Circle) from Fortner Street to Bauman Drive in Dothan. Length 0.582 mi.

BRACKET ESTIMATE: $5,310,043 TO $6,490,052

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


010 . ACAA58374-ATRP(004) SHELBY COUNTY
LENGTH: 2.26 MILES. WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 6 % COST OF PLANS: $51.00

for constructing the Resurfacing and Traffic Stripe on CR-353 (Hugh Daniel Drive) from approximately 4000 feet east of the junction of SR-38 (US-280) to the junction of CR-41 (Dunavant Road) in Hoover. Length 2.260 mi.

BRACKET ESTIMATE: $836,214 TO $1,022,039

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


011 . ACAA59028-ATRP(007) MADISON COUNTY
LENGTH: 0.39 MILES. WORKING DAYS: 300
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $41.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, and Signals) on CR-93 (Winchester Road) over the Flint River in Huntsville. Length 0.387 mi.

BRACKET ESTIMATE: $6,291,505 TO $7,689,618

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


014 . ACAA61006-ATRP(008) JEFFERSON COUNTY
LENGTH: 1.79 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-123 (Tarrant Road) from the junction of SR-3 (US-31) to the junction of CR-121 (New Castle Road) in Gardendale. Length 1.787 mi.

BRACKET ESTIMATE: $493,466 TO $603,125

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


017 . ACAA62032-ATRP(003) JEFFERSON COUNTY
LENGTH: 3.05 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $10.00

for constructing the Resurfacing and Traffic Stripe on Deerfoot Parkway from the I-59 Interchange to the junction of Old Springville Road. Length 3.159 mi

BRACKET ESTIMATE: $851,968 TO $1,041,294

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


023 . ACNU58480-ATRP(003) LAMAR COUNTY
LENGTH: 2.78 MILES. WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-2 from the Fayette County Line to the junction of SR-96 in Kennedy. Length 2.779 mi.

BRACKET ESTIMATE: $355,716 TO $434,764

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


024 . ACNU59441-ATRP(010) TALLADEGA COUNTY
LENGTH: 0.60 MILES. WORKING DAYS: 120
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $30.00

for constructing the Roadway Improvements (Grade, Drain, Base, and Pave) on SR-77 and on the I-20 Westbound Exit Ramp from just south of the I-20 Interchange to just north of Magnolia Street in Lincoln. Length 0.596 mi.

BRACKET ESTIMATE: $1,126,736 TO $1,377,122

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


025 . ACNU59550-ATRP(002) & ST-014-999-001 CLAY COUNTY
LENGTH: 0.87 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe, and Signals at Various Sites in the City of Ashland as indicated in the plans. Length 0.922 mi.

BRACKET ESTIMATE: $365,089 TO $446,220

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


026 . ACNU61045-ATRP(003) DALLAS COUNTY
LENGTH: 8.78 MILES. WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 4.00

for constructing the Resurfacing, Traffic Stripe, and Guardrail Replacement on CR-33 from the intersection of SR-22 to the junction of CR-960 in Orrville (Site #1) and on CR-31 from the intersection of CR-960 to the junction of CR-73 south of Orrville (Site #2). Length 8.777 mi.

BRACKET ESTIMATE: $1,537,700 TO $1,879,411

VIEW ITEMS

Return To: Proposal Letting List (Top of web page)


027 . ACNU61163-ATRP(001) BALDWIN COUNTY
LENGTH: 3.01 MILES. WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $15.00

for constructing the Resurfacing and Traffic Stripe on CR-2 (Gulf State Park Road 2) from the junction of SR-135 to the junction of SR-182 in Gulf Shores. Length 3.013 mi.

BRACKET ESTIMATE: $664,693 TO $812,402

**WITHDRAWN FROM THE LETTING**

028 . ACNU61249-ATRP(006) & ACNU61250-ATRP(006) CHEROKEE COUNTY

LENGTH: 9.14 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 6.00

for constructing the Resurfacing, Traffic Stripe, and Guardrail Improvements on CR-99 from the junction of CR-41 to the Georgia State Line and on CR-41 from the intersection CR-46 to the Georgia State Line. Length 9.198 mi.

BRACKET ESTIMATE: $1,046,981 TO $1,279,644

VIEW ITEMS


029 . ACNU61278-ATRP(007) JACKSON COUNTY

LENGTH: 7.20 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-43 from the DeKalb County Line to the intersection of SR-35 in Section. Length 7.209 mi.

BRACKET ESTIMATE: $974,697 TO $1,191,296

VIEW ITEMS


030 . ACNU61305-ATRP(007) MARSHALL COUNTY

LENGTH: 3.20 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-847 (Mat Morrow Road) from the intersection of CR-418 (Ruth Road) to the junction of SR-53 (US-231) north of Arab. Length 3.200 mi.

BRACKET ESTIMATE: $540,813 TO $660,993

VIEW ITEMS


031 . ACNU61855-ATRP(005) & ACNU61856-ATRP(005) LIMESTONE COUNTY

LENGTH: 3.11 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 6.00

for constructing the Resurfacing and Traffic Stripe on Garrett Road from the junction of SR-3 (US-31) to a point near Piney Creek in Decatur (Site #1) and on Morris Road from the junction of Easter Ferry Road to the intersection of SR-127 in Elkmont (Site #2). Length 6.832 mi.

BRACKET ESTIMATE: $1,455,372 TO $1,778,788

VIEW ITEMS


035 . ACOA59426-ATRP(004) BALDWIN COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 125
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $34.00

for constructing the Widening, Resurfacing and Traffic Stripe on CR-20 from the intersection of South Hickory Street to the intersection of SR-59 in Foley. Length 0.996 mi.

BRACKET ESTIMATE: $1,546,074 TO $1,889,646

VIEW ITEMS


036 . ACOA59521-ATRP(003) BALDWIN COUNTY

LENGTH: 2.53 MILES.

WORKING DAYS: 295
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $100

for constructing the Roadway Extension (Grade, Drain, Base, Pave, and Signals) on Pride Drive from SR-59 (Gulf Shores Parkway) to the intersection of CR-20 and Roadway Improvements on CR-1186 (Juniper Street) from the junction of CR-20 to just north of the Pride Drive Extension in Foley. Length 2.527 mi.

BRACKET ESTIMATE: $8,295,128 TO $10,138,490

VIEW ITEMS


037 . ACOA59592-ATRP(003) DALLAS COUNTY

LENGTH: 1.62 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 7.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-48 (Water Avenue) from the junction of Race Street to the east City Limits of Selma. Length 1.625 mi.

BRACKET ESTIMATE: $519,495 TO $634,939

VIEW ITEMS


038 . ACOA59759-ATRP(001) CULLMAN COUNTY

LENGTH: 4.10 MILES.

WORKING DAYS: 40
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-1223 from the junction of SR-3 (US-31) to the junction of CR-1242 north of West Point. Length 4.138 mi.

BRACKET ESTIMATE: $919,792 TO $1,124,191

VIEW ITEMS


039 . ACOA59767-ATRP(004) DEKALB COUNTY

LENGTH: 2.30 MILES.

WORKING DAYS: 60
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 4.00

for constructing the Resurfacing and Traffic Stripe on CR-127 from the junction of CR-271 to the junction of CR-89 in Fort Payne. Length 2.241 mi.

BRACKET ESTIMATE: $593,847 TO $725,813

VIEW ITEMS


040 . ACOA61308-ATRP(002) MARSHALL COUNTY

LENGTH: 6.78 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on CR-14 (Warrenton Road) from a point near the junction of CR-44 (Fry Gap Road) to the intersection of SR-69 in Guntersville. Length 6.827 mi.

BRACKET ESTIMATE: $913,504 TO $1,116,504

VIEW ITEMS


041 . ACOA61319-ATRP(007) MARSHALL COUNTY

LENGTH: 3.60 MILES.

WORKING DAYS: 35
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-409 (Martling Road) from the intersection of CR-513 (Martling Gap Road) to the junction of CR-649 (Burgess Road) Length 3.560 mi.

BRACKET ESTIMATE: $629,747 TO $769,691

VIEW ITEMS


042 . ACOA61557-ATRP(004) ESCAMBIA COUNTY

LENGTH: 8.59 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 8.00

for constructing the Resurfacing and Traffic Stripe on Deere Creek Road from the intersection of Jones Road to the intersection of Rockaway Creek Road in Atmore (Site #1); on Airport Road from the intersection of Beacon Lane to the junction of SR-3 (US-31) in Atmore (Site #2); on CR-17 (18th Avenue) from the junction of SR-3 (US-31) to the junction of CR-27 (Carver Avenue) in Atmore (Site #3); and on CR-27 (Carver Avenue/Pouncey Road/Robinsonville Road) from the Atmore City Limits to the intersection of CR-5 (Canoe Road North) (Site #4). Length 8.586 mi.

BRACKET ESTIMATE: $1,269,181 TO $1,551,221

VIEW ITEMS


043 . ACOA61853-ATRP(003) COFFEE COUNTY

LENGTH: 1.49 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 6.00

for constructing the Widening, Resurfacing, and Traffic Stripe on Coppinville Road from the intersection of SR-12 (US-84) to the junction of SR-134 in Enterprise. Length 1.486 mi.

BRACKET ESTIMATE: $406,357 TO $496,658

VIEW ITEMS


047 . BR-0075(511) MARSHALL COUNTY

LENGTH: 0.68 MILES.

WORKING DAYS: 275
DBE CONTRACT OBLIGATION: 8 % COST OF PLANS: $48.00

for constructing the Bridge Replacement (Grade, Drain, Base, and Pave) on SR-75 over Scarham Creek. Length 0.681 mi.

BRACKET ESTIMATE: $3,989,535 TO $4,876,098

VIEW ITEMS


050 . BRZ-1613(250) COFFEE COUNTY

WORKING DAYS: 30
COST OF PLANS: $ 3.00

for the Bridge Coating on CR-342 over Big Creek (Site #A); on CR-410 over Bucks Mill Creek (Site #B); on CR-427 over Pages Creek (Site #C); and on CR-473 over Cripple Creek (Site #D).

BRACKET ESTIMATE: $83,469 TO $102,018

VIEW ITEMS


053 . ERPR-8930(921) CONECUH & ESCAMBIA COUNTIES

WORKING DAYS: 340
DBE CONTRACT OBLIGATION: 10 % COST OF PLANS: $79.00

for constructing the Divisionwide Emergency Repairs at Various Sites as indicated in the plans.

BRACKET ESTIMATE: $2,430,589 TO $2,970,720

**ALL BIDS REJECTED**

056 . HRRR-3614(250) JACKSON COUNTY

LENGTH: 0.11 MILES.

WORKING DAYS: 30
COST OF PLANS: $ 4.00

for constructing the Guardrail Installation on CR-67 from a point approximately 6.246 miles south of the junction of SR-35 proceeding southwesterly for approximately 0.113 miles northeast of Langston. Length 0.113 mi.

BRACKET ESTIMATE: $121,054 TO $147,954

VIEW ITEMS


059 . NH-HSIP-0020(516) COLBERT COUNTY

LENGTH: 0.19 MILES.

WORKING DAYS: 50
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $24.00

for constructing the Additional Median Deceleration and Acceleration Lanes on SR-20 (Alternate US-72) at MP 29.500 to include the removal of the Westbound Merge Lane from CR-22 in Muscle Shoals. Length 0.417 mi.

BRACKET ESTIMATE: $817,687 TO $999,395

VIEW ITEMS


061 . SRTS-SR12(913) JEFFERSON COUNTY

WORKING DAYS: 40
COST OF PLANS: $21.00

for constructing the Sidewalks, Traffic Control Markings and Signs along various streets in Midfield as indicated in the plans. Length 0.529 mi.

BRACKET ESTIMATE: $172,043 TO $210,274

VIEW ITEMS


062 . STPAA-0017(560) FRANKLIN & MARION COUNTIES

LENGTH: 6.80 MILES.

WORKING DAYS: 45
DBE CONTRACT OBLIGATION: 5 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-17 (US-43) from 0.32 miles south of the Franklin County Line to just south of the junction of SR-13 (MP 301.660). Length 6.801 mi.

BRACKET ESTIMATE: $1,459,234 TO $1,783,508

VIEW ITEMS


063 . STPAA-0243(502) FRANKLIN COUNTY

LENGTH: 2.39 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 4 % COST OF PLANS: $ 3.00

for constructing the Resurfacing and Traffic Stripe on SR-243 from the junction of CR-44 to the junction of SR-24. Length 2.392 mi.

BRACKET ESTIMATE: $717,870 TO $877,396

VIEW ITEMS


064 . STPAA-7804(603) AUTAUGA COUNTY

LENGTH: 1.00 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 9.00

for constructing the Resurfacing and Traffic Stripe on CR-2 (East Main Street) from the junction of Shady Oak Lane to the intersection of CR-75 (McQueen Smith Road) in Prattville. Length 1.068 mi.

BRACKET ESTIMATE: $365,858 TO $447,159

VIEW ITEMS


070 . STPNU-1014(250) & STPNU-1014(251) CHEROKEE COUNTY

LENGTH: 4.60 MILES.

WORKING DAYS: 30
DBE CONTRACT OBLIGATION: 3 % COST OF PLANS: $ 5.00

for constructing the Resurfacing and Traffic Stripe on CR-47 from the junction of SR-273 to the junction of CR-52 and on CR-46 from the junction of CR-15 to the junction of CR-91. Length 4.600 mi.

BRACKET ESTIMATE: $530,159 TO $647,973

VIEW ITEMS


074 . STPOA-8817(600) COLBERT COUNTY

LENGTH: 0.39 MILES.

WORKING DAYS: 75
DBE CONTRACT OBLIGATION: 7 % COST OF PLANS: $18.00

for constructing the Roadway Improvements on Montgomery Avenue from the Norfolk Southern Railroad to the junction of 6th Street in Sheffield. Length 0.390 mi.

BRACKET ESTIMATE: $1,237,773 TO $1,512,833

VIEW ITEMS


077 . 99-406-261-231-402 ELMORE COUNTY

WORKING DAYS: 45
COST OF PLANS: $10.00

for the constructing the Slide Correction and Drainage Repairs (Grade, Drain, Base, and Pave) on the Southbound Shoulder of SR-9 (US-231) from milepost 117.372 to 117.262 south of Wetumpka. Length 0.131 mi.

BRACKET ESTIMATE: $251,072 TO $306,866

VIEW ITEMS


078 . 99-506-690-000-401 BUTLER & MONTGOMERY COUNTIES

WORKING DAYS: 45
COST OF PLANS: $ 3.00

for constructing the Bridge Abutment Slope Pavement and Joint Repair on Various Bridges within the Sixth Division.

BRACKET ESTIMATE: $162,744 TO $198,909

VIEW ITEMS


079 . 99-507-690-000-401 BARBOUR , COFFEE , COVINGTON , CRENSHAW & GENEVA COUNTIES

WORKING DAYS: 55
COST OF PLANS: $17.00

for constructing the Pile Encasements and Riprap Placement on Various Bridges in the Seventh Division.

BRACKET ESTIMATE: $540,102 TO $660,125

VIEW ITEMS


Return To: Top of this Page