November 07, 2014, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. IM-I065(399), MORGAN, ETC. 2. IM-I065(454), LOWNDES
3. IM-I065(456), ETC., AUTAUGA 4. IMF-IMDF-I010(329), BALDWIN
6. BR-I065(440), BALDWIN, ETC. 8. NHF-0203(523), COFFEE
10. ACAA60220-ATRP(003), MADISON, ETC. 11. ACOA61072-ATRP(015), HOUSTON
12. ACAA62033F-ATRP(008), MADISON 15. ACBR60922-ATRP(007), ETC., CHAMBERS
17. ACBRZ59682-ATRP(001), MORGAN 18. ACBR60317-ATRP(004), FAYETTE, ETC.
19. ACBRZ60322-ATRP(012), FAYETTE 23. ACNU59757-ATRP(004), CULLMAN
24. ACNU60593-ATRP(008), WINSTON 25. ACNU61346-ATRP(006), ETC., CLARKE
28. ACOA58486-ATRP(005), WALKER 29. ACOA58507-ATRP(010), ETC., COFFEE
30. ACOA58616-ATRP(001), CULLMAN 31. ACOA59419-ATRP(001), BALDWIN
32. ACOA59420-ATRP(001), BALDWIN 33. ACOA61556-ATRP(005), ESCAMBIA
36. BR-0009(521), CLAY 39. ERPR-8980(902), BALDWIN
40. ERPR-8980(903), BALDWIN 41. ERPR-8980(904), MOBILE
44. HSIP-0001(583), HENRY 47. NH-0008(579), LOWNDES
49. NH-0017(558), MOBILE 50. NH-0158(509), MOBILE
51. STPAA-NR13(907), BARBOUR, ETC. 53. STPAA-HSIP-0010(537), MARENGO
54. STPAA-HSIP-0021(550), WILCOX 55. STPAA-HSIP-0069(545), MARENGO
59. STPMN-5114(250), MONTGOMERY 62. STPNU-2914(257), FAYETTE
63. STPNU-5514(251), ETC., PIKE 66. STPOA-9647(600), TUSCALOOSA
200. HPP-A138(900), TUSCALOOSA

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IM-I065(399) ,MORGAN AND LIMESTONE COUNTIES

Contract Time: 130 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on I-65 from 0.6 miles south of the SR-36 (Main Street) Overpass (MP 326.850) to 1.1 miles south of the I-565 Interchange (MP 338.900). Length 12.139 mi.

The Bracket Estimate on this project is from $5,716,041 to $6,986,272 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


2.IM-I065(454) ,LOWNDES COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Slope Repair on I-65 (Northbound Lane Inside Shoulder) at MP 142.800 one mile south of the CR-33 Underpass northeast of Fort Deposit.

The Bracket Estimate on this project is from $391,899 to $478,988 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.IM-I065(456) & 99-406-011-003-403 ,AUTAUGA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Slide Repair at various locations as indicated in the plans. Length 0.212 mi.

The Bracket Estimate on this project is from $339,035 to $414,376 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.IMF-IMDF-I010(329) ,BALDWIN COUNTY

Contract Time: 270 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Guardrail, Traffic Stripe, and Signal Upgrades on I-10 (to include the ramps and side roads) from the east end of the Bayway Bridge to east of the SR-59 Interchange in Loxley . Length 9.221 mi.

The Bracket Estimate on this project is from $12,876,769 to $15,738,273 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.BR-I065(440) ,BALDWIN AND MOBILE COUNTIES

Contract Time: 250 Working Days

for constructing the Various Repairs to Bridges over the Delta River on I-65. Length 6.079 mi.

The Bracket Estimate on this project is from $10,770,562 to $13,164,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $110.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.NHF-0203(523) ,COFFEE COUNTY

Contract Time: 375 Working Days

DBE Goal Percent:8.00

for constructing the Roadway Extension (Grade, Drain, Base, Pave, and Bridge) on SR-203 from a point east of the Whitewater Creek Bridge to the junction of SR-12 (US-84) east of the junction of SR-87 in Elba. Length 2.363 mi.

The Bracket Estimate on this project is from $21,604,729 to $26,405,780 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $118.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA60220-ATRP(003) ,MADISON AND LIMESTONE COUNTIES

Contract Time: 300 Working Days

DBE Goal Percent:10.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-3 (County Line Road) from the intersection of CR-1036 (Madison Boulevard) to the Madison City Limits. Length 5.388 mi.

The Bracket Estimate on this project is from $6,947,938 to $8,491,924 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $81.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACOA61072-ATRP(015) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Chickasaw Street from the junction of Cherokee Avenue to the intersection of SR-1 (US-231/Oates Street) and on South Park Avenue from the intersection of Selma Street to the intersection of SR-12 (US-84/Main Street) in Dothan. Length 2.393 mi.

The Bracket Estimate on this project is from $459,372 to $561,455 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACAA62033F-ATRP(008) ,MADISON COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:10.00

for constructing the Northbound Lanes (Grade, Drain, Base, Pave, and Traffic Signals) of CR-7 (Zierdt Road) from a point north of CR-11 (Martin Road) to a point south of Madison Boulevard in Huntsville. Length 2.768 mi.

The Bracket Estimate on this project is from $5,212,232 to $6,370,505 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $132.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBR60922-ATRP(007) & ACBR60923-ATRP(007) ,CHAMBERS COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement and Approaches on CR-258 over Whatley Creek and Chikasanoxee Creek northwest of Five Points. Length 0.511 mi.

The Bracket Estimate on this project is from $1,093,307 to $1,336,265 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ59682-ATRP(001) ,MORGAN COUNTY

Contract Time: 55 Working Days

for constructing the Bridge Replacement on Rescue Road over Kid Creek south of Morgan City. Length 0.101 mi.

The Bracket Estimate on this project is from $308,131 to $376,605 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBR60317-ATRP(004) ,FAYETTE AND MARION COUNTIES

Contract Time: 140 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-36 over Luxapallila Creek west of Winfield. Length 0.199 mi.

The Bracket Estimate on this project is from $1,382,363 to $1,689,555 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACBRZ60322-ATRP(012) ,FAYETTE COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement and Approaches on CR-234 (Mount Pleasant Road) over Belle Creek. Length 0.093 mi.

The Bracket Estimate on this project is from $242,096 to $295,895 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU59757-ATRP(004) ,CULLMAN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-1101 from the Lawrence County Line to the intersection of SR-157. Length 7.710 mi.

The Bracket Estimate on this project is from $1,055,330 to $1,289,848 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACNU60593-ATRP(008) ,WINSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-29 (Rocky Plains Road) from the junction of CR-70 to the junction of CR-25 northeast of Lynn. Length 6.794 mi.

The Bracket Estimate on this project is from $664,591 to $812,277 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU61346-ATRP(006) & ACNU61349-ATRP(006) ,CLARKE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-27, A Street, and a portion of Church Street in Groove Hill. Length 14.160 mi.

The Bracket Estimate on this project is from $1,220,622 to $1,491,871 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACOA58486-ATRP(005) ,WALKER COUNTY

Contract Time: 100 Working Days

for constructing the Resurfacing and Traffic Stripe on 9th Avenue from the junction of 16th Street West to the SR-69 overpass (SR-5) in Jasper. Length 0.857 mi.

The Bracket Estimate on this project is from $878,395 to $1,073,594 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACOA58507-ATRP(010) & ACOA59401-ATRP(010) ,COFFEE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:8.00

for constructing the Roadway Improvements (Grade, Drain, Base, and Pave) on Dauphin Street from the junction of North Main Street to the junction of Shellfield Road and the Phase II Roadway Improvements (Grade, Drain, Base, and Pave) of Dauphin Street from 0.15 miles north of Alberta Street to the intersection of SR-12 (US-84) in Enterprise. Length 0.850 mi.

The Bracket Estimate on this project is from $2,204,868 to $2,694,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $49.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACOA58616-ATRP(001) ,CULLMAN COUNTY

Contract Time: 45 Working Days

for constructing the Additional Turn Lanes, Median Crossover, and Guardrail on SR-3 (US-31) at Park Road in South Vinemont. Length 0.202 mi.

The Bracket Estimate on this project is from $274,299 to $335,255 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.ACOA59419-ATRP(001) ,BALDWIN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Intersection Improvements to include Additional Turn Lanes (Grade, Drain, Base, Pave, and Signals) on CR-65 at the intersection of SR-42 (US-98) west of Foley. Length 0.220 mi.

The Bracket Estimate on this project is from $706,070 to $862,975 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ACOA59420-ATRP(001) ,BALDWIN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Roundabout Installation on CR-64 at the intersection of CR-13 in Daphne. Length 0.132 mi.

The Bracket Estimate on this project is from $925,827 to $1,131,566 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.ACOA61556-ATRP(005) ,ESCAMBIA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Sunset Drive from the junction of CR-1 to the junction of Virginia Drive in Atmore (Site #1); on Martin Luther King Junior Avenue from the Atmore City Limits to the junction of Northgate Drive (Site #2); on Virginia Drive from the junction of East Sunset Drive to the intersection of Northgate Drive in Atmore (Site #3); and on Northgate Drive from the intersection of SR-21 to the intersection of Virginia Drive in Atmore (Site #4). Length 4.877 mi.

The Bracket Estimate on this project is from $762,867 to $932,393 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.BR-0009(521) ,CLAY COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Grade, Drain, Base and Pave) on SR-9 over Little Hillabee Creek. Length 0.624 mi.

The Bracket Estimate on this project is from $2,967,299 to $3,626,699 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $38.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.ERPR-8980(902) ,BALDWIN COUNTY

Contract Time: 30 Working Days

for constructing the Permanent Restoration of Damaged Sites at Various Locations as indicated in the plans.

The Bracket Estimate on this project is from $102,369 to $125,118 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.ERPR-8980(903) ,BALDWIN COUNTY

Contract Time: 30 Working Days

for constructing the Permanent Restoration of Damaged Sites at Various Locations as indicated in the plans.

The Bracket Estimate on this project is from $115,214 to $140,817 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.ERPR-8980(904) ,MOBILE COUNTY

Contract Time: 40 Working Days

for constructing the Permanent Restoration of Damaged Sites at Various Locations as indicated in the plans.

The Bracket Estimate on this project is from $95,065 to $116,191 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.HSIP-0001(583) ,HENRY COUNTY

Contract Time: 30 Working Days

for constructing the Cross Slope Corrections on the Northbound Roadway of SR-1 (US-431) just south of the Barbour County Line from MP 50.100 to MP 50.290. Length 0.191 mi.

The Bracket Estimate on this project is from $215,435 to $263,310 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-0008(579) ,LOWNDES COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-8 (US-80) from the end project limits of Old Town Creek (MP 100.143) to the Selma-Montgomery Trail Interpretive Center (MP 106.018). Length 5.874 mi.

The Bracket Estimate on this project is from $1,613,877 to $1,972,516 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.NH-0017(558) ,MOBILE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 (US-45) from north of the I-65 Interchange in Prichard to north of the intersection of SR-158. Length 5.240 mi.

The Bracket Estimate on this project is from $1,499,116 to $1,832,253 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.NH-0158(509) ,MOBILE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-158 from just west of the I-65 Overpass to the intersection of SR-13 (US-43) in Saraland. Length 2.229 mi.

The Bracket Estimate on this project is from $1,317,732 to $1,610,561 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-NR13(907) ,BARBOUR, DALE, AND HENRY COUNTIES

Contract Time: 130 Working Days

DBE Goal Percent:3.00

for constructing the Curb Ramp Installations and Modifications on State Routes at Various Locations as indicated in the plans.

The Bracket Estimate on this project is from $484,600 to $592,289 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-HSIP-0010(537) ,MARENGO COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-10 from just east of SR-13 (US-43) (MP 45.681) to just east of SR-25 (MP 53.485). Length 7.804 mi.

The Bracket Estimate on this project is from $1,633,258 to $1,996,205 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0021(550) ,WILCOX COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-21 from the Monroe County Line to the intersection of SR-10 in Oak Hill. Length 7.000 mi.

The Bracket Estimate on this project is from $1,671,437 to $2,042,867 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0069(545) ,MARENGO COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-69 from the Horse Creek Bridge to south of the intersection of SR-10 (MP 54.445). Length 5.815 mi.

The Bracket Estimate on this project is from $1,113,465 to $1,360,902 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPMN-5114(250) ,MONTGOMERY COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-23 (Butler Mill Road) from the intersection of CR-24 (West Old Hayneville Road) to the Right-Of-Way Limits of the CSX Railroad. Length 5.711 mi.

The Bracket Estimate on this project is from $984,419 to $1,203,179 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPNU-2914(257) ,FAYETTE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Guardrail, and Traffic Stripe on CR-53 from the junction of SR-102 to the intersection of CR-49 southeast of Hubbertville. Length 4.133 mi.

The Bracket Estimate on this project is from $608,873 to $744,178 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-5514(251) & STPNU-5514(250) ,PIKE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-1135 from the junction of CR-1170 to the junction of CR-1101 and on CR-3307 from the junction of CR-3306 to the junction of CR-3304. Length 7.380 mi.

The Bracket Estimate on this project is from $608,640 to $743,894 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPOA-9647(600) ,TUSCALOOSA COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, Bridge Culvert, and Striping) on Hunter Creek Road over Two Mile Creek in Northport. Length 0.069 mi.

The Bracket Estimate on this project is from $314,799 to $384,754 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.HPP-A138(900) ,TUSCALOOSA COUNTY

Contract Time: 90 Working Days

for constructing the Pedestrian Improvements at Various Locations in the City of Northport. Length 0.434 mi.

The Bracket Estimate on this project is from $194,897 to $238,207 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)