Office Engineer

Proposal Letting List
January 30, 2015, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. IM-I059(362), TUSCALOOSA 6. ACAA59463-ATRP(003), JEFFERSON
8. ACAA59598-ATRP(005), ELMORE 10. ACAA61187-ATRP(003), MOBILE
11. ACAA61188-ATRP(005), MOBILE 17. ACBRZ58445-ATRP(001), RUSSELL
20. ACBRZ58641-ATRP(003), ETOWAH 22. ACBR59641-ATRP(010), FRANKLIN
26. ACBRZ59676-ATRP(009), MORGAN 29. ACNU59343-ATRP(004), MONROE
31. ACNU61036-ATRP(005), AUTAUGA 32. ACNU61163-ATRP(001), BALDWIN
33. ACNU61336-ATRP(008), CHOCTAW 34. ACNU61339-ATRP(002), CHOCTAW
35. ACNU61361-ATRP(009), CLARKE 36. ACNU62248-ATRP(010), ST. CLAIR
40. ACOA59645-ATRP(001), FRANKLIN 55. IM-HSIP-I085(344), LEE
56. IMF-I065(447), SHELBY 61. NH-0013(593), FAYETTE
62. NH-0042(527), BALDWIN 64. SRTS-SR12(913), JEFFERSON
65. STPAA-0017(563), PICKENS 68. STPAA-0079(514), JACKSON
69. STPAA-0177(501), CLARKE 70. STPOA-0204(514), CALHOUN
71. STPAA-HSIP-0003(582), BUTLER 72. STPAA-HSIP-0009(557), CALHOUN
73. STPAA-HSIP-0025(541), CHEROKEE 75. STPAA-HSIP-0106(507), BUTLER
76. STPAA-HSIP-0122(503), COFFEE 77. STPAA-HSIP-0144(501), ST. CLAIR
78. STPAA-HSIP-0289(500), PERRY 79. STPAA-STPBH-7376(600), JEFFERSON
85. STPNU-5714(251), RUSSELL 88. STPAA-0079(512), BLOUNT
89. STPOA-2813(252), ETOWAH 90. STPOA-3514(252), HOUSTON
93. ST-002-180-007, BALDWIN 95. ST-067-999-005, WINSTON
98. 99-309-022-287-501, BALDWIN 200. STPAA-NR13(941), COLBERT

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IM-I059(362) ,TUSCALOOSA COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing and Traffic Stripe on I-59 from the junction of the CR-1900 (Joe Mallisham Parkway) overpass to the junction of the I-359 overpass (Exit 71) in Tuscaloosa. Length 2.550 mi.

The Bracket Estimate on this project is from $1,737,172 to $2,123,210 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA59463-ATRP(003) ,JEFFERSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-65-1 (B.Y. Williams Sr Drive) from the intersection of Woodward Road to the Midfield City Limits. Length 0.674 mi.

The Bracket Estimate on this project is from $279,415 to $341,507 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8., ACAA59598-ATRP(005), ACAA59599-ATRP(013) & ACAA59600-ATRP(013) ,ELMORE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe at Various Locations as indicated in the plans. Length 19.478 mi.

The Bracket Estimate on this project is from $3,826,197 to $4,676,463 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA61187-ATRP(003) ,MOBILE COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:10.00

for constructing the Widening, Drainage Improvements, Resurfacing, and Traffic Stripe on Dawes Road from the intersection of Grand Bay - Wilmer Road to the junction of Three Notch Road. Length 4.765 mi.

The Bracket Estimate on this project is from $1,924,601 to $2,352,291 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACAA61188-ATRP(005) ,MOBILE COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:10.00

for constructing the Widening, Drainage Improvements, Resurfacing, Guardrail Installation, and Traffic Stripe on CR-70 (Tanner Williams Road) from the junction of CR-5 (Wilmer Road North) to a point 1200 feet west of the junction of Eliza Jordan Road North. Length 4.795 mi.

The Bracket Estimate on this project is from $2,580,110 to $3,152,801 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ58445-ATRP(001) ,RUSSELL COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement with Pedestrian Walkway and Approaches on 10th Avenue over Holland Creek in Phenix City. Length 0.145 mi.

The Bracket Estimate on this project is from $746,989 to $912,986 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACBRZ58641-ATRP(003) ,ETOWAH COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave and Bridge) on Wesson Gap Road over Big Wills Creek north of Attalla. Length 0.191 mi.

The Bracket Estimate on this project is from $2,015,920 to $2,463,903 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACBR59641-ATRP(010) ,FRANKLIN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement on CR-22 over Mack Branch. Length 0.062 mi.

The Bracket Estimate on this project is from $389,369 to $475,896 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACBRZ59676-ATRP(009) ,MORGAN COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-125 (Kirby Bridge Road) over West Fork of Flint Creek. Length 0.302 mi.

The Bracket Estimate on this project is from $2,405,091 to $2,939,556 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29., ACNU59343-ATRP(004) & ACNU59344-ATRP(004) ,MONROE COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-20 (Drewry Road) from south of the junction of SR-41 (South Alabama Avenue) to the Monroeville City Limits to include the Intersection Realignment of CR-20 (Drewry Road) and SR-41 (South Alabama Avenue) in Monroeville. Length 2.148 mi.

The Bracket Estimate on this project is from $1,070,840 to $1,308,805 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.ACNU61036-ATRP(005) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-57 from the intersection of CR-40 to the Chilton County Line. Length 10.033 mi.

The Bracket Estimate on this project is from $1,546,873 to $1,890,622 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ACNU61163-ATRP(001) ,BALDWIN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-2 (Gulf State Park Road Two) from the junction of SR-135 to the junction of SR-182 in Gulf Shores. Length 3.013 mi.

The Bracket Estimate on this project is from $692,324 to $846,173 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.ACNU61336-ATRP(008) ,CHOCTAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-32 from the junction of SR-10 in Yantley to the junction of CR-45. Length 3.642 mi.

The Bracket Estimate on this project is from $767,254 to $937,755 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34., ACNU61339-ATRP(002), ACNU61340-ATRP(002) & ACNU61341-ATRP(002) ,CHOCTAW COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-9 and CR-24 as indicated in the plans. Length 14.334 mi.

The Bracket Estimate on this project is from $3,038,059 to $3,713,184 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.ACNU61361-ATRP(009) ,CLARKE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-44 (Tallahatta Springs Road) from the junction of SR-69 to the Thomasville City Limits. 15.743 mi.

The Bracket Estimate on this project is from $1,200,560 to $1,467,351 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36., ACNU62248-ATRP(010) & ACNU62249-ATRP(012) ,ST. AND CLAIR COUNTIES

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-42 from the junction of SR-7 (US-11) to the junction of Steele Gap Road and on CR-22 from the intersection of SR-53 (US-231) to the intersection of CR-21. Length 14.572 mi.

The Bracket Estimate on this project is from $2,802,372 to $3,425,122 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.ACOA59645-ATRP(001) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Madison Street from the intersection of Jackson Avenue to the intersection of SR-13 (US-43) in Russellville. Length 0.644 mi.

The Bracket Estimate on this project is from $179,995 to $219,994 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.IM-HSIP-I085(344) ,CHAMBERS AND LEE COUNTIES

Contract Time: 210 Working Days

DBE Goal Percent:6.00

for constructing the Median Barrier on I-85 from the Exit 50 Interchange (Cox Road) to the Georgia State Line. Length 30.398 mi.

The Bracket Estimate on this project is from $1,762,325 to $2,153,953 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.IMF-I065(447) ,SHELBY COUNTY

Contract Time: 11/15/2015 Completion Date

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing and Traffic Stripe to include Cross Slope Corrections, Bridge Rail Retrofit, Signal Loops, and Traffic Detection Pole from south of the SR-3 (US-31) Interchange (MP 237.600) in Alabaster to south of the CR-52 Interchange (MP 241.800) in Pelham. Length 4.321 mi.

The Bracket Estimate on this project is from $6,363,986 to $7,778,206 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.NH-0013(593) ,FAYETTE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 from the junction of SR-18 (Berry Junction) to the intersection of SR-102. Length 11.810 mi.

The Bracket Estimate on this project is from $3,215,531 to $3,930,094 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.NH-0042(527) ,BALDWIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:9.00

for constructing the Resurfacing and Traffic Stripe on SR-42 (US-98) from just north of the intersection of Scenic Route US-98 to just west of CR-65. Length 10.482 mi.

The Bracket Estimate on this project is from $2,083,084 to $2,545,991 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.SRTS-SR12(913) ,JEFFERSON COUNTY

Contract Time: 40 Working Days

for constructing the Sidewalks, Traffic Control Markings, and Signs along various streets in Midfield as indicated in the plans. Length 0.529 mi

The Bracket Estimate on this project is from $183,726 to $224,553 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-0017(563) ,PICKENS COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from north of the intersection of 18th Avenue Southwest (MP 208.250) to the junction of 2nd Street Northwest (MP 210.425) in Reform. Length 2.023 mi.

The Bracket Estimate on this project is from $748,090 to $914,333 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-0079(514) ,JACKSON COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-79 from the junction of SR-279 (MP 88.720) to 350 feet north of the junction of CR-757 (MP 102.000) in Skyline. Length 9.180 mi.

The Bracket Estimate on this project is from $2,977,025 to $3,638,586 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-0177(501) ,CLARKE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-177 from west of the junction of Miller Street to south of the junction of SR-13 (US-43) in Jackson. Length 2.984 mi

The Bracket Estimate on this project is from $706,203 to $863,137 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPOA-0204(514) ,CALHOUN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-204 from the junction of CR-73 to the junction of SR-21. Length 2.950 mi.

The Bracket Estimate on this project is from $1,099,404 to $1,343,716 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71., STPAA-HSIP-0003(582) & 99-406-074-003-502 ,BUTLER COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, Inlet Upgrades, and Traffic Stripe on SR-3 (US-31) from the Georgiana Bypass (MP 119.972) to the junction of CR-37 (MP 125.450) to include the Culvert Extension at MP 123.467. Length 5.477 mi.

The Bracket Estimate on this project is from $1,948,339 to $2,381,304 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPAA-HSIP-0009(557) ,CALHOUN COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-9 from 0.230 miles south of the junction of Stone Ridge Road (MP 230.170) to the just south of the Piedmont City Limits (MP 238.229). Length 8.059 mi.

The Bracket Estimate on this project is from $2,547,831 to $3,114,015 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPAA-HSIP-0025(541) ,CHEROKEE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-25 (US-411) from 0.3 miles north of the junction of CR-20 to 430 feet west of the junction of SR-68 in Leesburg. Length 3.980 mi.

The Bracket Estimate on this project is from $1,949,424 to $2,382,629 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75., STPAA-HSIP-0106(507) & 99-406-074-106-501 ,BUTLER COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Drainage Structure Improvements, Planing, Resurfacing, and Traffic Stripe on SR-106 from east of the intersection of CR-27 (MP 14.878) to the intersection of CR-45 (MP 20.609). Length 5.730 mi.

The Bracket Estimate on this project is from $2,153,575 to $2,632,148 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPAA-HSIP-0122(503) ,COFFEE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-122 from the junction of SR-12 (US-84) to the junction of SR-51. Length 3.741 mi.

The Bracket Estimate on this project is from $1,259,203 to $1,539,026 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPAA-HSIP-0144(501) ,ST. AND CLAIR COUNTIES

Contract Time: 65 Working Days

DBE Goal Percent:9.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-144 from the junction of SR-53 (US-231) to the junction of CR-26 in Ragland. Length 10.159 mi.

The Bracket Estimate on this project is from $2,474,668 to $3,024,595 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPAA-HSIP-0289(500) ,PERRY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-289 from the junction of SR-5 to the intersection of SR-14 in Marion. Length 1.200 mi.

The Bracket Estimate on this project is from $676,396 to $826,707 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPAA-STPBH-7376(600) ,JEFFERSON COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Installation (Grade, Drain, Base, Pave, and Signal Removal) on F.L. Shuttlesworth Drive from the junction of 29th Avenue North to the junction of 32nd Avenue North in Birmingham. Length 0.428 mi.

The Bracket Estimate on this project is from $5,585,111 to $6,826,247 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $59.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


85.STPNU-5714(251) ,RUSSELL COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Patching, Leveling, Resurfacing, and Traffic Stripe on CR-33 (Huguley Road) from the junction of CR-32 (Padgetts Road) to the junction of SR-8 (US-80). Length 4.289 mi.

The Bracket Estimate on this project is from $711,968 to $870,183 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.STPAA-0079(512) ,BLOUNT COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-79 from the intersection of SR-74 (US-278) at MP 48.862 in Brooksville to the Marshall County Line. Length 5.036 mi.

The Bracket Estimate on this project is from $922,910 to $1,128,001 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


89.STPOA-2813(252) ,ETOWAH COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:9.00

for constructing the Resurfacing and Traffic Stripe on CR-212 (Bruton Gap Road) from the junction of SR-7 (US-11) to the junction of CR-211 (Duck Springs Road). Length 2.199 mi.

The Bracket Estimate on this project is from $700,540 to $856,215 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


90., STPOA-3514(252) & STPOA-3514(253) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on CR-68 (Trawick Road) from the Geneva County Line to the Right-of-Way Limits of the junction of SR-52 in Dothan (Site #1) and on CR-45 (Memphis Church Road) from the junction of Eddins Road to just south (0.043 miles) of the junction of E Saunders Road (Site #2). Length 4.847 mi.

The Bracket Estimate on this project is from $906,080 to $1,107,431 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


93.ST-002-180-007 ,BALDWIN COUNTY

Contract Time: 40 Working Days

for constructing the Intersection Improvements (Grade, Drain, and Pave) at SR-180 and SR-161 in Orange Beach. Length 0.303 mi.

The Bracket Estimate on this project is from $385,241 to $470,850 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


95.ST-067-999-005 ,WINSTON COUNTY

Contract Time: 150 Working Days

for constructing the Culvert Replacement on SR-13 at CR-7 (Dime Road) in Haleyville. Length 0.151 mi.

The Bracket Estimate on this project is from $888,172 to $1,085,544 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


98.99-309-022-287-501 ,BALDWIN COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-287 from the junction of SR-3 (US-31) to the intersection of SR-59 in Bay Minette. Length 1.925 mi.

The Bracket Estimate on this project is from $500,344 to $611,531 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(941) ,COLBERT, FRANKLIN, LAUDERDALE, AND LAWRENCE COUNTIES

Contract Time: 85 Working Days

for constructing the Curb Ramp Installations and Modifications on Various State Routes at Various Locations.

The Bracket Estimate on this project is from $443,194 to $541,682 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)