1. APDF-0471(533), JEFFERSON 4. NHF-0020(517), MORGAN, ETC.
7. ACAA58378-ATRP(012), JEFFERSON 10. ACAA62947-ATRP(009), JEFFERSON
16. ACBRZ58645-ATRP(005), JACKSON 17. ACBRZ60459-ATRP(013), LAWRENCE
18. ACBRZ62447-ATRP(009), FRANKLIN 21. ACNU58337-ATRP(007), BULLOCK, ETC.
22. ACNU58577-ATRP(012), DALE 23. ACNU60529-ATRP(013), CRENSHAW
25. ACNU60944-ATRP(015), COLBERT 26. ACNU61037-ATRP(011), AUTAUGA
27. ACNU61262-ATRP(012), BLOUNT 28. ACNU61313-ATRP(005), MARSHALL
29. ACNU61317-ATRP(006), MARSHALL * 30. ACNU61857-ATRP(004), LIMESTONE
36. BR-0171(502), MARION 42. ERPR-8960(927), MONTGOMERY, ETC.
45. FLAP-FL14(102), COFFEE * 48. HPP-STPNU-A146(902), BIBB
51. HSIP-0106(506), BUTLER, ETC. 54. NH-0001(584), MARSHALL
55. NH-0006(558), PICKENS 56. NH-0020(521), COLBERT
57. NH-0024(509), FRANKLIN 58. NH-0053(574), MORGAN
59. NH-0157(520), LAWRENCE 60. NH-0215(503), TUSCALOOSA
61. NH-0249(501), DALE 63. NH-HSIP-0001(585), CHAMBERS
65. NH-HSIP-0021(552), TALLADEGA 69. STPAA-0064(501), LAUDERDALE
70. STPAA-0195(507), WINSTON 71. STPOA-0815(250), CALHOUN
72. STPAA-HSIP-0025(542), SHELBY 73. STPAA-HSIP-0117(510), JACKSON
74. STPAA-NR13(937), MONTGOMERY 75. STPAA-NR13(956), MARENGO,ETC
84. STPNU-1314(250), CLARKE 85. STPNU-1614(250) COFFEE, ETC.
86. STPOA-3413(251), HENRY 89. STPOA-3514(251) HOUSTON, ETC.
92. ST-002-180-008, BALDWIN 93. ST-021-009-005, CRENSHAW
*96. 99-305-535-005-401, PERRY 97. 99-505-990-500-401, HALE, ETC
98. 99-509-273-113-401, ESCAMBIA 200. STPNU-2514(250), DEKALB
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.APDF-0471(533), JEFFERSON COUNTY

Contract Time: 250 Working Days

DBE Goal Percent:4.50

for constructing the Final Base and Pave on I-22 (Corridor X) from CR-77 (Coalburg Road) to I-65 and to include Partial Signing and Striping from west of the SR-4 (US-78) Interchange to I-65. Length 12.179 mi.

The Bracket Estimate on this project is from $19,944,053 to $24,376,065 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $70.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.NHF-0020(517), MORGAN AND LIMESTONE COUNTIES

Contract Time: 165 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Pavement Replacement, Resurfacing, and Traffic Stripe) on SR-20 (US-72A) from the east side of the Railroad Bridge at MP 68.605 to just east of the junction of SR-3 (US-31) at MP 71.320 in Decatur. Length 2.821 mi.

The Bracket Estimate on this project is from $5,656,375 to $6,913,347 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $57.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACAA58378-ATRP(012), JEFFERSON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Widening, Resurfacing, Signal Modification, and Traffic Stripe on SR-150 at the intersection of Galleria Boulevard in Hoover. Length 0.166 mi.

The Bracket Estimate on this project is from $771,673 to $943,156 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA62947-ATRP(009), JEFFERSON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Minor Parkway from the intersection of Crumly Chapel Road to the interchange of SR-5 (US-78). Length 1.627 mi.

The Bracket Estimate on this project is from $834,935 to $1,020,476 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ58645-ATRP(005), JACKSON COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-44 over Dry Creek southeast of Langston. Length 0.051

The Bracket Estimate on this project is from $422,745 to $516,688 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ60459-ATRP(013), LAWRENCE COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement on CR-150 over Crooked Creek southwest of Courtland. Length 0.520 mi.

The Bracket Estimate on this project is from $1,145,432 to $1,399,973 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ62447-ATRP(009), FRANKLIN COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement on Vina Shottsville Road over Hurricane Creek southwest of Vina. Length 0.120 mi.

The Bracket Estimate on this project is from $209,931 to $256,582 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21. ACNU58337-ATRP(007), ACNU60471-ATRP(007) & ACNU60464-ATRP(008), BULLOCK COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-22 from the intersection of SR-223 to the junction of CR-31 (Site #1); on CR-31 from the junction of SR-223 to the junction of SR-15 (US-29) (Site #2); and on CR-7 from the junction of CR-176 (High Log Road) to the junction of SR-110 (Site #3). Length10.222 mi.

The Bracket Estimate on this project is from $1,586,231 to $1,938,727 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACNU58577-ATRP(012), DALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-1 from the intersection of SR-12 (US-84) in Level Plains to the junction of SR-248. Length 3.849 mi.

The Bracket Estimate on this project is from $656,783 to $802,735 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU60529-ATRP(013), CRENSHAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-50 (Honoraville Road) from the Butler County Line to the intersection of SR-9 (US-331). Length 8.968 mi.

The Bracket Estimate on this project is from $1,280,954 to $1,565,611 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU60944-ATRP(015), COLBERT COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on CR-65 from the junction of Crooked Oak Road to the intersection of Little Bear Creek Road southwest of Tuscumbia. Length 7.741 mi.

The Bracket Estimate on this project is from $625,451 to $764,441 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU61037-ATRP(011), AUTAUGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-40 from the junction of CR-19 to the junction of SR-6 (US-82). Length 4.105 mi.

The Bracket Estimate on this project is from $493,138 to $602,724 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACNU61262-ATRP(012), BLOUNT COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing, Drainage Improvements, Guardrail Installation, Signage, and Traffic Stripe on CR-47 from the Cullman County Line to the junction of CR-26 in Blountsville and on CR-55 from the junction of SR-53 (US-231) in Blountsville to the Cullman County Line. Length 10.325 mi.

The Bracket Estimate on this project is from $1,664,915 to $2,034,897 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACNU61313-ATRP(005), MARSHALL COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-96 (Mount Hebron/Summerville Road) from the Blount County Line to the junction of SR-179. Length 9.736 mi.

The Bracket Estimate on this project is from $1,293,253 to $1,580,642 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACNU61317-ATRP(006), MARSHALL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-152 (Oneonta Cut-Off) from the intersection of SR-75 to the intersection of CR-166 (Section Line Road). Length 2.900 mi.

The Bracket Estimate on this project is from $465,573 to $569,033 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACNU61857-ATRP(004), LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on Thach Road from the junction of the I-65 Interchange east of Elkmont to the intersection of SR-251. Length 4.896 mi.

The Bracket Estimate on this project is from $1,094,139 to $1,337,281 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


36.BR-0171(502), MARION COUNTY

Contract Time: 330 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grade, Drain, Base, and Pave) on SR-171 from south of the junction of CR-35 to north of the junction of Wakefield Street in Hamilton. Length 0.946 mi.

The Bracket Estimate on this project is from $7,070,891 to $8,642,201 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $56.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42., ERPR-8960(927) & 99-406-261-009-403, MONTGOMERY AND ELMORE COUNTIES

Contract Time: 40 Working Days

for constructing the Slide Repair and Guardrail Reset on SR-9 (US-331) at Railroad Bridge (AL13-1) and Slide Corrections on SR-9 (US-231) at Various Sites as indicated in the plans.

The Bracket Estimate on this project is from $156,305 to $191,040 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.FLAP-FL14(102), COFFEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-700 (Shellfield Road) from the junction of SR-27 in Enterprise to the Dale County Line. Length 2.153 mi.

The Bracket Estimate on this project is from $609,250 to $744,639 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.HPP-STPNU-A146(902), BIBB COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Turn Lanes, Planing, Resurfacing, Traffic Stripe, and Signals) on SR-5 at the intersection of SR-7 (US-11) from 0.16 miles north of CR-27 to 0.05 miles south of the Tuscaloosa County Line. Length 0.757 mi.

The Bracket Estimate on this project is from $1,841,584 to $2,250,825 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $31.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


51. HSIP-0106(506) & 99-406-074-106-401, BUTLER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-106 from the Conecuh County Line to the west end of the I-65 Overpass Bridge (MP 9.450). Length 9.449 mi.

The Bracket Estimate on this project is from $1,262,846 to $1,543,478 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.NH-0001(584), MARSHALL COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of CR-5 (Cathedral Caverns Highway) south of Grant to the Madison County Line. Length 7.830 mi.

The Bracket Estimate on this project is from $3,474,781 to $4,246,955 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.NH-0006(558), PICKENS COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from MP 10.500 to just west of the city limits of Reform. Length 6.299 mi.

The Bracket Estimate on this project is from $5,973,556 to $7,301,013 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.NH-0020(521), COLBERT COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-20 (US-72) from a point east of the intersection of CR-48 (MP 36.220) to the Lawrence County Line. Length 4.219 mi.

The Bracket Estimate on this project is from $2,240,950 to $2,738,939 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.NH-0024(509), FRANKLIN COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-24 from just east of CR-83 (MP 32.700) to just west of CR-99 (MP 38.086). Length 5.404 mi.

The Bracket Estimate on this project is from $2,704,400 to $3,305,378 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.NH-0053(574), MORGAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on SR-53 (US-231) from the Marshall County Line to 0.25 miles north of Kennamer Drive (MP 301.100). Length 3.330 mi.

The Bracket Estimate on this project is from $1,652,316 to $2,019,498 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.NH-0157(520), LAWRENCE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-157 from just south of CR-242 (MP 44.000) to the intersection of SR-101. Length 5.294 mi.

The Bracket Estimate on this project is from $2,737,125 to $3,345,375 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.NH-0215(503),TUSCALOOSA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-215 from just east of Lurleen Wallace Boulevard North (MP 5.207) to just east of The Highlands (MP 7.954). Length 2.140 mi.

The Bracket Estimate on this project is from $592,478 to $724,140 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.NH-0249(501), DALE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-249 from the gate at Fort Rucker to the junction of SR-53 (US-231) in Ozark. Length 5.144 mi.

The Bracket Estimate on this project is from $2,088,300 to $2,552,367 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.NH-HSIP-0001(585), CHAMBERS COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-1 (US-431) from MP 158.446 to MP 161.640 through Lafayette. Length 3.194 mi.

The Bracket Estimate on this project is from $861,314 to $1,052,717 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.NH-HSIP-0021(552),TALLADEGA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-21 from the end of the By-Pass (MP 236.262) to the 4-Lane Section just north of Munford (MP 242.000). Length 5.738 mi.

The Bracket Estimate on this project is from $1,859,429 to $2,272,635 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-0064(501), LAUDERDALE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-64 from the intersection of SR-101 to the junction of SR-207. Length 8.074 mi.

The Bracket Estimate on this project is from $1,787,801 to $2,185,090 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPAA-0195(507), WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-195 from the junction of SR-74 (US-278) in Double Springs to just south of CR-2 (MP 30.400). Length 5.840 mi.

The Bracket Estimate on this project is from $1,666,517 to $2,036,854 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPOA-0815(250), CALHOUN COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on the Anniston Eastern By-Pass (SR-901) Golden Springs Road from the junction of the I-20 Interchange to just north of Chocolocco Road in Oxford. Length 2.847 mi.

The Bracket Estimate on this project is from $1,243,619 to $1,519,978 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPAA-HSIP-0025(542), SHELBY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-25 from the junction of SR-25 (Business) at MP 130.530 in Columbiana to the junction of CR-61 in Wilsonville. Length 7.820 mi.

The Bracket Estimate on this project is from $1,741,035 to $2,127,932 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPAA-HSIP-0117(510), JACKSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-117 from the CSXT Railroad Tracks in Stevenson to the Tennessee State Line. Length 11.889 mi.

The Bracket Estimate on this project is from $3,872,680 to $4,733,276 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPAA-NR13(937), MONTGOMERY COUNTY

Contract Time: 45 Working Days

for constructing the Curb Ramps to the existing Sidewalks or Repairs that are non-ADA Compliant at various locations as indicated in the plans.

The Bracket Estimate on this project is from $436,975 to $534,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPAA-NR13(956), MARENGO AND CLARKE COUNTIES

Contract Time: 60 Working Days

for constructing the Sidewalk Curb Ramp Installations on Various Routes as indicated in the plans.

The Bracket Estimate on this project is from $263,520 to $322,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


84.STPNU-1314(250), CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on Walker Springs Road (CR-10 and CR-19) from the Jackson City Limits to the intersection of CR-19 (Perry's Chapel Road). Length 8.988 mi.

The Bracket Estimate on this project is from $984,084 to $1,202,769 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


85. STPNU-1614(250) & STPNU-1614(251), COFFEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-224 from the junction of SR-125 north of Elba to the junction of SR-87 and on CR-235 from the junction of CR-239 northeast of Elba to the junction of SR-125. Length 4.937 mi.

The Bracket Estimate on this project is from $866,724 to $1,059,330 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


86.STPOA-3413(251), HENRY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-9 from the junction of SR-173 in Headland to the intersection of CR-33 and continuing on CR-33 to the junction of SR-173 in Newville. Length 3.896 mi.

The Bracket Estimate on this project is from $640,492 to $782,824 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


89. STPOA-3514(251) & STPOA-3514(254), HOUSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on Broad Street (Webb to Kinsey Road) from the junction of Bethel Road in Kinsey to 0.400 miles north of the intersection of SR-52 in Webb (Site #1) and on Omussee Road from the junction of Webb Road to the intersection of Kinsey Road (Watson Bridge Road) (Site #2) in Dothan. Length 7.309 mi.

The Bracket Estimate on this project is from $1,415,371 to $1,729,898 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


92.ST-002-180-008, BALDWIN COUNTY

Contract Time: 70 Working Days

for constructing the Intersection Improvements on SR-180 at the intersection of Main Street to include Widening from Money Bayou Drive to William Silvers Parkway. Length 0.747 mi.

The Bracket Estimate on this project is from $487,224 to $595,496 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


93.ST-021-009-005, CRENSHAW COUNTY

Contract Time: 35 Working Days

for constructing the Additional Turn Lane, Resurfacing, and Traffic Stripe on SR-9 (US-331) at CR-59 in Highland Home. Length 0.227 mi.

The Bracket Estimate on this project is from $190,502 to $232,836 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


96.99-305-535-005-401, PERRY COUNTY

Contract Time: 220 Working Days

for constructing the Soil Stabilization (Resurfacing, Widening, Soil Stabilization, and Traffic Stripe) on SR-5 from the Dallas County Line to 0.15 miles north of E. Goley Road (MP 54.850). Length 4.047 mi.

The Bracket Estimate on this project is from $4,324,853 to $5,285,931 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


97.99-505-990-500-401, HALE, CHILTON, AND PERRY COUNTIES

Contract Time: 40 Working Days

for the Maintenance Bridge Painting on various structures within the West Central Region.

The Bracket Estimate on this project is from $298,376 to $364,682 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


98.99-509-273-113-401, ESCAMBIA COUNTY

Contract Time: 60 Working Days

for the Bridge Painting on SR-113 over the CSX Railroad and on Ringold Street in Flomaton.

The Bracket Estimate on this project is from $475,615 to $581,308 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPNU-2514(250), DEKALB COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-134 from the Jackson County Line to the junction of SR-117. Length 4.950 mi.

The Bracket Estimate on this project is from $213,718 to $261,211 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)