Office Engineer

Proposal Letting List
March 27, 2015, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

3. ACOA43892F-ATRP(003), LEE 5. NHF-I059(376), TUSCALOOSA
7. STPBHF-I020(349), JEFFERSON *9. ACAA59581-ATRP(006), RUSSELL
10. ACAA61049-ATRP(013), MONTGOMERY 11. ACAA61051-ATRP(003), MONTGOMERY
16. ACBROA59482-ATRP(006), PIKE 17. ACBRZ58541-ATRP(001), ETC., COVINGTON
18. ACBR59640-ATRP(011), COLBERT 21. ACNU58658-ATRP(004), ST. CLAIR
22. ACNU59328-ATRP(007), ETC., CHOCTAW 23. ACNU59548-ATRP(015), CALHOUN
25. ACNU60366-ATRP(002), ETC., CLAY 26. ACNU60543-ATRP(010), HENRY
27. ACNU61008-ATRP(010), BUTLER 28. ACNU61342-ATRP(003), CHOCTAW
29. ACNU61350-ATRP(011), CLARKE 32. ACOA58507-ATRP(010), ETC., COFFEE
33. ACOA61058-ATRP(017), TALLAPOOSA 34. ACOA62432-ATRP(009), FRANKLIN
39. BR-5613(250), RANDOLPH 42. DE-A190(900), ETOWAH
45. ERPR-8980(905), BALDWIN 51. NH-0009(556), CRENSHAW
52. NH-0017(559), MOBILE 53. NH-0017(561), WASHINGTON
54. NH-0020(522), LAWRENCE, ETC. 55. NH-0157(519), LAUDERDALE
56. NH-HSIP-0001(582), MARSHALL 59. STPAA-0025(540), SHELBY
60. STPAA-0028(507), WILCOX 61. STPAA-0069(546), WALKER
62. STPAA-0096(505), FAYETTE 64. STPAA-0127(501), LIMESTONE
65. STPOA-HSIP-0063(505), ETC., TALLAPOOSA 66. STPOA-0225(500), BALDWIN
67. STPMN-2600(210), ETC., ELMORE 68. STPAA-HSIP-0239(502), BARBOUR
69. STPAA-MR14(900), BIBB 72. STPBH-7229(600), JEFFERSON
73. STPBH-CN13(906), JEFFERSON 76. STPNU-0914(250), ETC., CHAMBERS
77. STPNU-1214(256), CHOCTAW 78. STPNU-1314(251), CLARKE
79. STPNU-3114(252), GENEVA 82. STPOA-3514(250), HOUSTON
84. 99-305-535-005-401, PERRY 85. 99-401-224-I65-501, CULLMAN
86. 99-401-253-I59-501, DEKALB 87. 99-401-690-000-502, MADISON, ETC.
88. 99-401-690-000-503, DEKALB, ETC. 89. 99-401-690-000-504, CULLMAN, ETC.
200. STPLL-0214(250), BALDWIN
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


3.ACOA43892F-ATRP(003) ,LEE COUNTY

Contract Time: 280 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement and Additional Lanes (Grade, Drain, Base, Pave, and Signals) on CR-146 (Moore's Mill Road) at the I-85 Overpass in Auburn. Length 0.699 mi.

The Bracket Estimate on this project is from $7,113,068 to $8,693,750 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $73.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.NHF-I059(376) ,TUSCALOOSA COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:8.00

for constructing the Additional Lanes (Grade, Drain, Base, Pave, Signing, Lighting, and Concrete Barrier Rail) on I-59 (I-20) from south of the CR-85 (Buttermilk Road) interchange to south of the SR-7 (US-11) interchange. Length 2.670 mi.

The Bracket Estimate on this project is from $21,412,469 to $26,170,796 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $73.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.STPBHF-I020(349) ,JEFFERSON COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, Pave, Retaining Walls, and Signals) on 31st Street North over I-59/20 and on 12th Avenue North over I-59/20 in Birmingham. Length 0.568 mi.

The Bracket Estimate on this project is from $18,585,740 to $22,715,905 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $93.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACAA59581-ATRP(006) ,RUSSELL COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Traffic Stripe, and Signal Improvements on CR-418 (Crawford Road/13th Street) from the intersection of SR-1 (US-280/431) to the junction of 3rd Avenue in Phenix City. Length 1.867 mi.

The Bracket Estimate on this project is from $1,960,095 to $2,395,672 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


10.ACAA61049-ATRP(013) ,MONTGOMERY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing and Traffic Stripe on Alabama River Parkway from the intersection of Northern Boulevard to 0.3 miles north of Coosada Ferry Road. Length 1.790 mi.

The Bracket Estimate on this project is from $895,774 to $1,094,835 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACAA61051-ATRP(003) ,MONTGOMERY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on Woodley Road from the intersection of South Boulevard to the junction of McGehee Road. Length 0.957 mi.

The Bracket Estimate on this project is from $424,694 to $519,071 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBROA59482-ATRP(006) ,PIKE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Bridge Replacement (Grade, Drain, Base, and Pave) on CR-26 (Elm Street) from intersection of George Wallace Drive to the junction of CR-14 (Swindall Road). Length 3.418 mi.

The Bracket Estimate on this project is from $1,553,588 to $1,898,830 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ58541-ATRP(001) & ACBRZ58542-ATRP(001) ,COVINGTON COUNTY

Contract Time: 165 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement on CR-89 over Corner Creek northeast of Florala and on Bass Ridge Road over an Unnamed Tributary that flows into Bay Branch east of Carolina. Length 0.049 mi.

The Bracket Estimate on this project is from $1,070,799 to $1,308,755 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBR59640-ATRP(011) ,COLBERT COUNTY

Contract Time: 125 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement on CR-65 (Frankfort Road) over Little Bear Creek southwest of Tuscumbia. Length 0.189 mi.

The Bracket Estimate on this project is from $1,150,582 to $1,406,267 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU58658-ATRP(004) ,ST. CLAIR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-41 (Hardwick Road) from the junction of SR-34 to the intersection of SR-4 (US-78) in Pell City. Length 2.963 mi.

The Bracket Estimate on this project is from $875,543 to $1,070,108 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACNU59328-ATRP(007), ACNU61337-ATRP(007) & ACNU61338-ATRP(007) ,CHOCTAW COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-14 and CR-25 from the junction of CR-21 to the junction of CR-9 (Site #1); on CR-23 (Ararat Road) from the junction of McCarty's Ferry Road to the junction of CR-43 (Site #2); and on CR-23 (Ararat Road) from the junction of CR-43 to the junction SR-17 (Site #3). Length 15.902 mi.

The Bracket Estimate on this project is from $3,053,368 to $3,731,895 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU59548-ATRP(015) ,CALHOUN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-73 (Boiling Springs Road) from the Talladega County Line to the intersection of SR-77 south of Ohatchee. Length 5.935 mi.

The Bracket Estimate on this project is from $762,524 to $931,974 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU60366-ATRP(002), ACNU60371-ATRP(013), ACNU60372-ATRP(008) & ACNU60373-ATRP(008) ,CLAY COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-239 (Abel Road) from SR-49 to the Cleburne County Line; on CR-79 from the Tallapoosa County Line to SR-77; on CR-35 from CR-132 (Sardis Road) to Creek Road; and on CR-30 from SR-77 to CR-202 (Cragford Road). Length 16.964 mi.

The Bracket Estimate on this project is from $2,022,081 to $2,471,432 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU60543-ATRP(010) ,HENRY COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-57 from the junction of CR-99 north to the junction of SR-95. Length 17.207 mi.

The Bracket Estimate on this project is from $863,145 to $1,054,955 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACNU61008-ATRP(010) ,BUTLER COUNTY

Contract Time: 45 Working Days

for constructing Resurfacing and Traffic Stripe on CR-38 (Shacklesville Road) from the intersection of SR-10 to the Monroe/Conecuh County Line. Length 10.721 mi.

The Bracket Estimate on this project is from $945,413 to $1,155,505 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACNU61342-ATRP(003) ,CHOCTAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-6 from the intersection of CR-31 in Bladon Springs to the junction of SR-12 (US-84). Length 3.755 mi.

The Bracket Estimate on this project is from $755,496 to $923,384 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACNU61350-ATRP(011) ,CLARKE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-48 (Bashi Road) from the intersection of SR-69 to the Thomasville City Limits. Length 15.114 mi.

The Bracket Estimate on this project is from $1,181,600 to $1,444,178 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.ACOA58507-ATRP(010) & ACOA59401-ATRP(010) ,COFFEE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:8.00

for constructing the Roadway Improvements (Grade, Drain, Base, and Pave) on Dauphin Street from the junction of North Main Street to the junction of Shellfield Road and the Phase II Roadway Improvements (Grade, Drain, Base, and Pave) of Dauphin Street from 0.15 miles north of Alberta Street to the intersection of SR-12 (US-84) in Enterprise. Length 0.850 mi.

The Bracket Estimate on this project is from $2,204,868 to $2,694,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $49.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.ACOA61058-ATRP(017) ,TALLAPOOSA COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing and Traffic Stripe on Hillabee Street from the intersection of SR-22 to the junction of Scott Road (Site #1); on Coven Abbett Highway from the junction of SR-128 to the junction of SR-38 (US-280) (Site #2); and on Comer Street from the junction of Dadeville Road to the junction of Maple Street (Site #3) in Alexander City. Length 5.523 mi.

The Bracket Estimate on this project is from $1,072,826 to $1,311,232 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.ACOA62432-ATRP(009) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Waterloo Road from the junction of Madison Street to the Colbert County Line. Length 5.539 mi.

The Bracket Estimate on this project is from $664,554 to $812,233 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.BR-5613(250) ,RANDOLPH COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement and Approaches on CR-59 over Cane Creek northwest of Woodland. Length 0.094 mi.

The Bracket Estimate on this project is from $496,844 to $607,254 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.DE-A190(900) ,ETOWAH COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:3.00

for constructing the Roadway Lighting Installation on Airport Road at Ira Gray Drive in Gadsden. Length 1.108 mi.

The Bracket Estimate on this project is from $373,802 to $456,869 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.ERPR-8980(905) ,BALDWIN COUNTY

Contract Time: 35 Working Days

for constructing the Slide Repair on the northbound lane of SR-59 between the Intracoastal Bridge and 22nd Avenue in Gulf Shores. Length 0.083 mi.

The Bracket Estimate on this project is from $190,438 to $232,758 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.NH-0009(556) ,CRENSHAW COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 (US-331) from south of the junction of Meadow Crest Drive to the junction of SR-10/SR-15 in Luverne. Length 1.936 mi.

The Bracket Estimate on this project is from $943,647 to $1,153,346 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.NH-0017(559) ,MOBILE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-17 (US-45) from north of the SR-158 interchange in Saraland to the intersection of CR-63 (Chunchula Georgetown Road) in Chunchula. Length 9.058 mi.

The Bracket Estimate on this project is from $3,616,254 to $4,419,866 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.NH-0017(561) ,WASHINGTON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 (US-45) from the Mobile County Line northwest of Citronelle to north of the junction of SR-57 (US-45). Length 7.588 mi.

The Bracket Estimate on this project is from $1,683,507 to $2,057,620 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.NH-0020(522) ,LAWRENCE AND MORGAN COUNTIES

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-20 (US-72) from 0.11 miles east of CR-383 to just east of the Morgan County Line (MP 62.000). Length 3.882 mi

The Bracket Estimate on this project is from $1,970,880 to $2,408,584 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.NH-0157(519) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-157 from the junction of SR-133 to just north of Crunk Road (MP 79.590). Length 2.947 mi.

The Bracket Estimate on this project is from $972,066 to $1,188,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.NH-HSIP-0001(582) ,MARSHALL COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of Miller Street in Albertville to just south of CR-342 (Brashers Chapel Road) (MP 290.520) near Guntersville. Length 3.970 mi.

The Bracket Estimate on this project is from $1,711,180 to $2,091,442 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-0025(540) ,SHELBY COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25 from the junction of CR-55 to the Jefferson County Line. Length 10.180 mi.

The Bracket Estimate on this project is from $1,554,361 to $1,899,775 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-0028(507) ,WILCOX COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on SR-28 from 0.12 miles west of the junction of SR-162 to 0.025 miles west of the intersection of SR-10 in Camden. Length 10.905 mi.

The Bracket Estimate on this project is from $2,256,278 to $2,757,674 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPAA-0069(546) ,WALKER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-69 from the Tuscaloosa County Line to the junction of SR-18 south of Oakman. Length 9.078 mi.

The Bracket Estimate on this project is from $1,776,615 to $2,171,418 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-0096(505) ,FAYETTE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-96 from just west of the Lamar County Line to the junction of SR-18 in Fayette. Length 9.135 mi.

The Bracket Estimate on this project is from $1,300,293 to $1,589,247 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-0127(501) ,LIMESTONE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on SR-127 from the junction of Maples Circle to just north of Wire Way (MP 8.090). Length 3.479 mi.

The Bracket Estimate on this project is from $1,040,951 to $1,272,274 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPOA-HSIP-0063(505) & STPOA-0128(500) ,TALLAPOOSA COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-63 from the Elmore County Line to the intersection of SR-38 (US-280) to include SR-22 from MP 116.340 to MP 117.145 and Resurfacing and Traffic Stripe on SR-128 from the junction of SR-63 to the junction of Coven Abbett Highway in Wind Creek State Park. Length 14.281 mi.

The Bracket Estimate on this project is from $4,536,435 to $5,544,532 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPOA-0225(500) ,BALDWIN COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-225 from the junction of SR-3 (US-31) in Spanish Fort to the junction of CR-138. Length 11.497 mi.

The Bracket Estimate on this project is from $1,682,539 to $2,056,437 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPMN-2600(210), STPMN-7905(602) & STPMN-2640(203) ,ELMORE COUNTY

Contract Time: 360 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-79 (Mehearg Road) over Callaway Creek; on Coosada Parkway over Coosada Creek; and on CR-3 (Ingram Road) over Cottonford Creek. Length 0.565 mi.

The Bracket Estimate on this project is from $3,957,513 to $4,836,961 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $59.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-HSIP-0239(502) ,BARBOUR COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-239 from the junction of SR-51 in Clayton to Stinking Creek (MP 7.298) . Length 5.158 mi.

The Bracket Estimate on this project is from $2,083,723 to $2,546,772 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-MR14(900) ,BIBB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe SR-219 from the junction of SR-25 to the intersection of SR-6 (US-82) in Centreville (Site #1); on SR-209 from the junction of SR-58 to the junction of SR-25 in Centreville (Site #2); and on SR-58 from the intersection of SR-25 in Centreville to the junction of SR-6 (US-82) (Site #3). Length 2.978 mi.

The Bracket Estimate on this project is from $753,611 to $921,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPBH-7229(600) ,JEFFERSON COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:8.00

for constructing the Phase II Additional Lanes (Grade, Drain, Base, Pave, and Traffic Signals) on CR-126 (Tarrant-Huffman Road) from east of the junction of Briarmont Drive to the junction of CR-154 (Roebuck Drive) in Tarrant. Length 1.980 KM.

The Bracket Estimate on this project is from $6,749,017 to $8,248,799 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $78.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPBH-CN13(906) ,JEFFERSON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Sidewalk Extension (Grade, Drain, Sidewalk, and Striping) on Hackberry Lane from the junction of Queensview Road to the junction of Running Brook Road in Birmingham. Length 0.434 mi.

The Bracket Estimate on this project is from $253,485 to $309,815 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPNU-0914(251) & STPNU-0914(250) ,CHAMBERS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-108 from the junction of CR-62 to the junction of SR-77 northwest of La Fayette and on CR-105 from the intersection of SR-77 to the intersection of SR-1 (US-431) northwest of La Fayette. Length 4.386 mi.

The Bracket Estimate on this project is from $673,356 to $822,991 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPNU-1214(256) ,CHOCTAW COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-18 from the junction of CR-11 in Needham to the junction of SR-17. Length 2.713 mi.

The Bracket Estimate on this project is from $814,310 to $995,267 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPNU-1314(251) ,CLARKE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-29/CR-2 (Walker Springs Road) from the intersection of CR-19 (Perry's Chapel Road) to the end of the pavement joint at the Gainestown Boat Ramp. Length 8.289 mi.

The Bracket Estimate on this project is from $858,161 to $1,048,864 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPNU-3114(252) ,GENEVA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-70 from the junction of CR-49 to a point approximately 470 feet west of the junction of SR-52 northwest of Slocomb. Length 2.843 mi.

The Bracket Estimate on this project is from $626,434 to $765,642 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


82.STPOA-3514(250) ,HOUSTON COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on Jordon Avenue from 0.09 miles west of the junction of McEachin Road to 0.15 miles east of the junction of Ruth Circle in Cowarts. Length 1.072 mi.

The Bracket Estimate on this project is from $173,103 to $211,570 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


84.99-305-535-005-401 ,PERRY COUNTY

Contract Time: 220 Working Days

for constructing the Soil Stabilization (Resurfacing, Widening, Soil Stabilization, and Traffic Stripe) on SR-5 from the Dallas County Line to 0.15 miles north of E. Goley Road (MP 54.850). Length 4.047 mi.

The Bracket Estimate on this project is from $4,324,853 to $5,285,931 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 AM on Thursday, March 19, 2015, at the West Central RegionTuscaloosa Area Office Auditorium2715 East Skyland BoulevardTuscaloosa, AL 35407 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


85.99-401-224-I65-501 ,CULLMAN COUNTY

Contract Time: 24 Working Days

for the Litter Collection and Maintenance Roadside Mowing on I-65 from the Blount County Line to the Morgan County Line.

The Bracket Estimate on this project is from $96,762 to $118,265 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


86.99-401-253-I59-501 ,DEKALB COUNTY

Contract Time: 42 Working Days

for the Litter Collection and Maintenance Roadside Mowing on I-59 from the Etowah County Line to the Georgia State Line.

The Bracket Estimate on this project is from $137,352 to $167,875 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


87.99-401-690-000-502 ,MADISON AND JACKSON COUNTIES

Contract Time: 24 Working Days

for the Litter Collection and Maintenance Roadside Mowing on I-565 and SR-2 (US-72) at various sites as indicated in the plans.

The Bracket Estimate on this project is from $111,920 to $136,791 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.99-401-690-000-503 ,DEKALB AND JACKSON COUNTIES

Contract Time: 60 Working Days

for the Litter Collection and Maintenance Roadside Mowing on various State Routes as indicated in the plans.

The Bracket Estimate on this project is from $169,251 to $206,862 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


89.99-401-690-000-504 ,CULLMAN AND MARSHALL COUNTIES

Contract Time: 60 Working Days

for the Litter Collection and Maintenance Roadside Mowing on various State Routes as indicated in the plans.

The Bracket Estimate on this project is from $264,312 to $323,049 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPLL-0214(250) ,BALDWIN COUNTY

Contract Time: 50 Working Days

for constructing the Paved Shoulders on CR-99 from the junction of Spanish Cove Drive North to the intersection of SR-42 (US-98) and on South 7th Street from the junction of CR-99 to the Boat Ramp in Lillian. Length 1.564 mi.

The Bracket Estimate on this project is from $375,617 to $459,087 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)