Office Engineer

Proposal Letting List
April 24, 2015, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

*1. ACIM49357F-IMF-I059(357), TUSCALOOSA 4. ACNU61258-ATRP(010), BLOUNT
11. ACBRZ59415-ATRP(010), CALHOUN *12. ACBRZ59423-ATRP(011), LAUDERDALE
13. ACBRZ59674-ATRP(006), LIMESTONE 14. ACBRZ60399-ATRP(002), COOSA
15. ACBRZ60424-ATRP(003), RANDOLPH 16. ACBRZ60510-ATRP(009), ETC., BARBOUR
17. ACBRZ61148-ATRP(016), ETC., LEE 18. ACBRZ61373-ATRP(008), ETOWAH
*21. ACNU58409-ATRP(015), BIBB 22. ACNU59338-ATRP(007), MARENGO
23. ACNU59654-ATRP(002), LAWRENCE 24. ACNU61033-ATRP(011), AUTAUGA
25. ACNU61363-ATRP(012), CLARKE 27. ACOA58507-ATRP(010), ETC., COFFEE
28. ACOA58350-ATRP(017), MACON 29. ACOA61877-ATRP(017), TUSCALOOSA
30. ACOA62228-ATRP(008), TUSCALOOSA 33. APL-STPNU-6714(251), WINSTON
40. HPP-STPNU-A146(902), BIBB 43. NH-0002(507), LAUDERDALE
44. NH-0013(588), WALKER 45. NH-0038(535), JEFFERSON, ETC.
46. NH-0077(518), ETOWAH 47. NH-HSIP-0001(588), RANDOLPH, ETC.
50. STPAA-0025(543), ETOWAH, ETC. 51. STPAA-0085(503), DALE
52. STPAA-0101(567), LAWRENCE 53. STPAA-0216(503), TUSCALOOSA
54. STPAA-HSIP-0022(521), RANDOLPH, ETC. 57. ST-037-038-008, JEFFERSON
60. 99-501-362-065-401, JACKSON 61. 99-504-690-000-500, CALHOUN, ETC.
62. 99-506-690-000-303, MONTGOMERY, ETC. 200. BRZ-4214(257), LIMESTONE
*WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACIM49357F-IMF-I059(357) ,TUSCALOOSA COUNTY

Contract Time: 8/31/2016 Completion Date

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, Traffic Stripe, Bridge Raising, and Guardrail Retrofit on I-59 (I-20) from south of the CR-10 (Holly Springs Lane) Interchange in Fosters to north of the CR-1900 (Joe Mallisham Parkway) Interchange. Length 7.656 mi.

The Bracket Estimate on this project is from $24,576,889 to $30,038,420 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $73.00 per set.

***WITHDRAWN FROM THE LETTING***
 

Return To: Proposal Letting List (Top of web page)


4.ACNU61258-ATRP(010) ,BLOUNT COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-17 from the junction of CR-8 at the Jefferson County Line to the Cullman County Line and on CR-5 from the Walker County Line to the junction of SR-3 (US-31) southwest of Blount Springs. Length 14.401 mi.

The Bracket Estimate on this project is from $2,442,313 to $2,986,050 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ59415-ATRP(010) ,CALHOUN COUNTY

Contract Time: 75 Working Days

for constructing the Bridge Replacement on CR-530 (Wellington Road). Length 0.189 mi.

The Bracket Estimate on this project is from $420,663 to $514,144 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACBRZ59423-ATRP(011) ,LAUDERDALE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Culverts and Approaches on CR-87 over Bluff Creek (Site #1) and on CR-25 over the West Fork of Sixmile Creek in Killen (Site #2). Length 0.277 mi.

The Bracket Estimate on this project is from $455,908 to $557,220 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


13.ACBRZ59674-ATRP(006) ,LIMESTONE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-93 (Cambridge Lane) over French Mill Creek in Athens. Length 0.141 mi.

The Bracket Estimate on this project is from $416,908 to $509,554 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ60399-ATRP(002) ,COOSA COUNTY

Contract Time: 45 Working Days

for constructing the Bridge Replacement and Approaches on Self Road over Bethesda Creek. Length 0.075 mi.

The Bracket Estimate on this project is from $415,681 to $508,054 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ60424-ATRP(003) ,RANDOLPH COUNTY

Contract Time: 60 Working Days

for constructing the Bridge Replacement and Approaches on CR-515 over Wedowee Creek. Length 0.075 mi.

The Bracket Estimate on this project is from $245,490 to $300,043 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ60515-ATRP(009) & ACBRZ60510-ATRP(009) ,BARBOUR COUNTY

Contract Time: 185 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement on CR-9 over Pea Creek west of Louisville and on Mary C. Smith Road over Johnson Creek. Length 0.135 mi.

The Bracket Estimate on this project is from $1,798,256 to $2,197,869 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ61973-ATRP(016) & ACBRZ61148-ATRP(016) ,LEE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacements on CR-27 over Odom Creek and on CR-188 over Webb Branch. Length 0.039 mi.

The Bracket Estimate on this project is from $610,390 to $746,033 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ61373-ATRP(008) ,ETOWAH COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement on CR-44 (Friendship Church Road) over Pole Creek. Length 0.142 mi.

The Bracket Estimate on this project is from $664,950 to $812,717 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU58409-ATRP(015) ,BIBB COUNTY

Contract Time: 135 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe to include Roadway Pipe Replacement and Minor Culvert Extension on CR-58 from the junction of SR- 6 (US-82) to the intersection of SR-5 in Brent. Length 3.280 mi.

The Bracket Estimate on this project is from $918,718 to $1,122,877 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


22.ACNU59338-ATRP(007) ,MARENGO COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-53 from the intersection of SR-25 in Thomaston to the Perry County Line southwest of Uniontown. Length 13.767 mi.

The Bracket Estimate on this project is from $2,031,444 to $2,482,875 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU59654-ATRP(002) ,LAWRENCE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-150 from the intersection of SR-20 (US-72) in Courtland to the junction of SR-101. Length 9.600 mi.

The Bracket Estimate on this project is from $1,083,245 to $1,323,967 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACNU61033-ATRP(011) ,AUTAUGA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-21 from the junction of CR-40 to the junction of SR-6 (US-82). Length 4.753 mi.

The Bracket Estimate on this project is from $811,300 to $991,589 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU61363-ATRP(012) ,CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-20 (Campbell's Landing Road) from the Corps of Engineers' Property Line to the intersection of SR-69 in Morvin. Length 5.239 mi.

The Bracket Estimate on this project is from $477,648 to $583,792 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACOA58507-ATRP(010) & ACOA59401-ATRP(010) ,COFFEE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:8.00

for constructing the Roadway Improvements (Grade, Drain, Base, and Pave) on Dauphin Street from the junction of North Main Street to the junction of Shellfield Road and the Phase II Roadway Improvements (Grade, Drain, Base, and Pave) of Dauphin Street from 0.15 miles north of Alberta Street to the intersection of SR-12 (US-84) in Enterprise. Length 0.850 mi.

The Bracket Estimate on this project is from $2,204,868 to $2,694,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $49.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACOA58350-ATRP(017) ,MACON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-126 (Old Montgomery Highway) from the junction of CR-30 (Franklin Road) to the junction of Payton Drive in Tuskegee. Length 0.522 mi.

The Bracket Estimate on this project is from $510,767 to $624,271 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACOA61877-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-86 (Flatwoods Road) from the junction of SR-6 (US-82) to the Mill Creek Bridge in Northport. Length 2.266 mi.

The Bracket Estimate on this project is from $442,838 to $541,247 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACOA62228-ATRP(008) ,TUSCALOOSA COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-330 (Will Walker Road) from the junction of Raven Lane to the junction of M-Class Boulevard in Vance. Length 0.642 mi.

The Bracket Estimate on this project is from $1,111,197 to $1,358,130 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.APL-STPNU-6714(251) ,WINSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-65 from the junction of CR-3174 near Houston to the junction of CR-63. Length 3.224 mi.

The Bracket Estimate on this project is from $434,691 to $531,288 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.HPP-STPNU-A146(902) ,BIBB COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Turn Lanes, Planing, Resurfacing, Traffic Stripe, and Signals) on SR-5 at the intersection of SR-7 (US-11) from 0.16 miles north of CR-27 to 0.05 miles south of the Tuscaloosa County Line. Length 0.757 mi.

The Bracket Estimate on this project is from $1,841,584 to $2,250,825 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $31.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-0002(507) ,LAUDERDALE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-2 (US-72) from just west of CR-71 (MP 42.550) to just east of CR-31 (MP 45.000). Length 2.437 mi.

The Bracket Estimate on this project is from $1,210,629 to $1,479,658 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-0013(588) ,WALKER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-13 from the Fayette County Line to the Winston County Line. Length 8.900 mi.

The Bracket Estimate on this project is from $2,048,599 to $2,503,843 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.NH-0038(535) ,JEFFERSON AND SHELBY COUNTIES

Contract Time: 65 Working Days

DBE Goal Percent:10.00

for constructing the Miscellaneous Improvements on SR-38 (US-280) from the Hollywood Boulevard Interchange in Birmingham to the junction of CR-1514 (Doug Baker Boulevard) in Meadowbrook to include Median Protection from the Cherokee Road Interchange to the junction of Overton Road in Mountain Brook. Length 5.280 mi.

The Bracket Estimate on this project is from $2,579,669 to $3,152,929 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $49.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.NH-0077(518) ,ETOWAH COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-77 from the junction of Pinedale Drive in Southside to north of the intersection of Steele Station Road (MP 105.000) in Rainbow City. Length 3.553 mi.

The Bracket Estimate on this project is from $1,504,708 to $1,839,087 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-HSIP-0001(588) ,RANDOLPH AND CLEBURNE COUNTIES

Contract Time: 100 Working Days

DBE Goal Percent:10.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the intersection of CR-29 north of Wedowee to just south of SR-9 (MP 212.221). Length 8.372 mi.

The Bracket Estimate on this project is from $2,337,885 to $2,857,415 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0025(543) ,ETOWAH AND CHEROKEE COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-25 (US-411) from north of the junction of Appalachian Road (MP 226.840) to 0.300 miles north of the junction of CR-20 (MP 232.000) southwest of Mackey. Length 5.160 mi.

The Bracket Estimate on this project is from $760,166 to $929,091 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-0085(503) ,DALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-85 from the intersection of SR-12 (US-84) to south of the Fort Rucker Gate (MP 22.279) in Daleville. Length 1.826 mi.

The Bracket Estimate on this project is from $724,177 to $885,105 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-0101(567) ,LAWRENCE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-101 from the intersection of SR-184 to Wheeler Dam. Length 3.515 mi.

The Bracket Estimate on this project is from $991,487 to $1,211,817 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-0216(503) ,TUSCALOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing, Guardrail, and Traffic Stripe on SR-216 from just east of the junction of George Newell Road (MP 16.000) east of Brookwood to just east of the junction of Booler Road (MP 21.000) west of Lake View. Length 4.595 mi.

The Bracket Estimate on this project is from $1,717,158 to $2,098,748 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0022(521) ,RANDOLPH AND CHAMBERS COUNTIES

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-22 from the Tallapoosa County Line to just west of CR-904 (MP 153.094). Length 9.037 mi.

The Bracket Estimate on this project is from $3,097,543 to $3,785,885 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.ST-037-038-008 ,JEFFERSON COUNTY

Contract Time: 75 Working Days

for constructing the Auxiliary Lanes (Grade, Drain, Base, Pave, and Signals) on SR-38 (US-280) from the I-459 Interchange to the junction of Cahaba River Road. Length 0.801 mi.

The Bracket Estimate on this project is from $2,646,326 to $3,234,399 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $35.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.99-501-362-065-401 ,JACKSON COUNTY

Contract Time: 30 Working Days

for constructing the Culvert Replacement (Grade, Drain, Base, and Pave) on SR-65 from a point east of the junction of CR-3 to a point west of the junction of CR-508 in Princeton. Length 0.151 mi.

The Bracket Estimate on this project is from $1,191,162 to $1,455,865 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.99-504-690-000-500 ,CALHOUN AND TALLADEGA COUNTIES

Contract Time: 100 Working Days

for the Maintenance Bridge Painting on Various Routes as indicated in the plans.

The Bracket Estimate on this project is from $698,882 to $854,189 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.99-506-690-000-303 ,MONTGOMERY, LOWNDES, MACON, AUTAUGA, BULLOCK, AND BUTLER COUNTIES

Contract Time: 70 Working Days

for constructing the Culvert Scour Prevention Measures and Repairs to Various Structures at Various sites as indicated in the plans.

The Bracket Estimate on this project is from $422,870 to $516,841 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.BRZ-4214(257) ,LIMESTONE COUNTY

Contract Time: 75 Working Days

for constructing the Bridge Replacement and Approaches on CR-15 (Fielding Road) over Coxey Creek. Length 0.094 mi.

The Bracket Estimate on this project is from $360,799 to $440,977 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)