Office Engineer

Proposal Letting List
May 29, 2015, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

2. APDF-IMF-0004(530), WALKER 5. ACAA59530-ATRP(002), MOBILE
6. ACAA59581-ATRP(006), RUSSELL 9. ACBR58519-ATRP(010), HOUSTON
10. ACBR59399-ATRP(012), BARBOUR 11. ACBR62448-ATRP(009), FRANKLIN
14. ACBRZ58361-ATRP(001), CALHOUN 15. ACBRZ58617-ATRP(004), ETOWAH
16. ACBRZ60323-ATRP (012), FAYETTE, ETC. 17. ACBRZ62453-ATRP(009), FRANKLIN
20. ACNU58347-ATRP(002), LOWNDES 21. ACNU59571-ATRP(016), RUSSELL
23. ACNU61039-ATRP(012), AUTAUGA 24. ACNU61229-ATRP(014), ETC., DEKALB
25. ACNU61231-ATRP(014), ETC., DEKALB 26. ACNU61274-ATRP (012), CULLMAN
27. ACNU62433-ATRP(009), FRANKLIN 28. ACNU62434-ATRP(004), FRANKLIN
35. ACOA59524-ATRP(009), ESCAMBIA 36. ACOA62220-ATRP(008), LIMESTONE
37. ACOA62973-ATRP(012), FRANKLIN 38. ACOA62974-ATRP(013), FRANKLIN
42. BR-1214(257), CHOCTAW 45. IM-I059(353), SUMTER
46. IM-I059(360), GREENE 48. IM-IMD-I065(435), SHELBY
51. NH-0003(592), ESCAMBIA 52. NH-0010(538), PIKE
53. NH-0013(594), TUSCALOOSA 55. NH-HSIP-0001(586), RANDOLPH
56. NH-HSIP-0005(543), WILCOX 57. NH-HSIP-0012 (560), COVINGTON
*62. STPAA-HSIP-0004(529), JEFFERSON 63. STPAA-HSIP-0048(504), RANDOLPH
64. STPAA-HSIP-0055(511), COVINGTON 65. STPAA-HSIP-0063(504), ELMORE
66. STPAA-HSIP-0125(503), ETC., COFFEE 67. STPAA-HSIP-0093(502), ETC., PIKE
73. STPNU-0814(252), CALHOUN 74. STPNU-1714(253), COLBERT
75. STPNU-1915(250), COOSA 76. STPNU-2615(251), ELMORE
77. STPNU-2814(251), ETOWAH 78. STPNU-3514 (255), HOUSTON
79. STPNU-5613(251), RANDOLPH 80. STPNU-6214(250), TALLAPOOSA
85. 99-505-990-500-401, HALE, ETC. *86. 99-506-690-000-401, MONTGOMERY, ETC.
**200. HPP-1602(511), MOBILE
*-WITHDRAWN FROM THE LETTING
**-ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


2.APDF-IMF-0004(530) ,WALKER COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:5.00

for constructing the Ultimate Paving, Guardrail Installation, and Traffic Stripe on I-22 (Corridor X) from the SR-118 Interchange (MP 51.830) to the SR-118 Overpass Ramps (MP 57.440) west of Jasper. Length 5.535 mi.

The Bracket Estimate on this project is from $14,818,281 to $18,111,232 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.ACAA59530-ATRP(002) ,MOBILE COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements on CR-19 (Irvington-Bayou La Batre Highway) at the intersection of CR-24 (Half Mile Road). Length 0.148 mi.

The Bracket Estimate on this project is from $805,388 to $948,363 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $26.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA59581-ATRP(006) ,RUSSELL COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Traffic Stripe, and Signal Improvements on CR-418 (Crawford Road/13th Street) from the intersection of SR-1 (US-280/431) to the junction of 3rd Avenue in Phenix City. Length 1.867 mi.

The Bracket Estimate on this project is from $1,960,095 to $2,395,672 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACBR58519-ATRP(010) ,HOUSTON COUNTY

Contract Time: 280 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grade, Drain, Base, and Pave) on CR-25 (Denton Road) over Rock Creek in Dothan. Length 0.281 mi.

The Bracket Estimate on this project is from $2,472,056 to $3,021,401 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $31.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBR59399-ATRP(012) ,BARBOUR COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-27 over Pea Creek north of Louisville. Length 0.150 mi.

The Bracket Estimate on this project is from $1,017,933 to $1,244,140 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBR62448-ATRP(009) ,FRANKLIN COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement on CR-23 over North Fork Creek west of Vina. Length 0.040 mi.

The Bracket Estimate on this project is from $260,533 to $318,430 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ58361-ATRP(001) ,CALHOUN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on Ranch Road over an Unknown Branch northeast of Wellington. Length 0.150 mi.

The Bracket Estimate on this project is from $623,071 to $761,532 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ58617-ATRP(004) ,ETOWAH COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement on Pineview Avenue over Little Cove Creek 0.10 mile east of SR-1 (US-431) in Glencoe. Length 0.074 mi.

The Bracket Estimate on this project is from $550,222 to $672,493 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ60323-ATRP (012) ,FAYETTE AND LAMAR COUNTIES

Contract Time: 65 Working Days

for constructing the Bridge Replacement and Approaches on CR-23 over Wiggins Creek west of Belk. Length 0.166 mi.

The Bracket Estimate on this project is from $488,650 to $597,239 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ62453-ATRP(009) ,FRANKLIN COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement on CR-89 over Turkey Creek east of Phil Campbell. Length 0.113 mi.

The Bracket Estimate on this project is from $267,175 to $326,547 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACNU58347-ATRP(002) ,LOWNDES COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-12 (Wall Street) from the junction of CR-17 in Mosses to the junction of SR-21. Length 5.969 mi.

The Bracket Estimate on this project is from $784,194 to $958,459 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU59571-ATRP(016) ,RUSSELL COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on Various Sites as indicated in the plans. Length 21.397 mi.

The Bracket Estimate on this project is from $2,412,136 to $2,948,167 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU61039-ATRP(012) ,AUTAUGA COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-16 from the junction of CR-83 to the junction of CR-1. Length 7.689 mi.

The Bracket Estimate on this project is from $871,049 to $1,064,616 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACNU61229-ATRP(014) & ACNU61230-ATRP(014) ,DEKALB COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-51 from the junction of CR-30 in Collinsville to the junction of CR-52 (Site #1) and on CR-51 from the junction of CR-52 to the junction of SR-7 (US-11) in Fort Payne (Site #2). Length 12.783 mi.

The Bracket Estimate on this project is from $1,536,022 to $1,877,360 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU61231-ATRP(014) & ACNU61232-ATRP(014) ,DEKALB COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-81 from the junction of CR-130 south of Fort Payne to the junction of CR-176 (Site #1) and on CR-83 from the junction of CR-55 to the intersection of CR-176 (Site #2). Length 3.265 mi.

The Bracket Estimate on this project is from $429,269 to $524,662 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU61274-ATRP (012) ,CULLMAN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-940 from the junction of CR-222 in Crane Hill to the intersection of SR-74 (US-278). Length 8.248 mi.

The Bracket Estimate on this project is from $1,149,204 to $1,404,582 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACNU62433-ATRP(009) ,FRANKLIN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-84 from the intersection of SR-247 to the junction of CR-49 (Site 1); on CR-58 from 440 feet east of Hovater Mill Road to the intersection of CR-73 (Site 2); and on CR-524 from the junction of CR-49 to the junction of CR-41 (Site 3). Length 11.686 mi.

The Bracket Estimate on this project is from $822,708 to $1,005,532 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACNU62434-ATRP(004) ,FRANKLIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-75 from junction of CR-81 to intersection of SR-24 near Russellville (Site 1); on CR-63 from the Phil Campbell City Limits to the intersection of CR-20 (Site 2); and on CR-81 from the junction of Broad Street in Phil Campbell to the intersection of CR-724 (Site 3). Length 28.600 mi.

The Bracket Estimate on this project is from $2,884,633 to $3,525,662 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.ACOA59524-ATRP(009) ,ESCAMBIA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Medical Park Drive/Martin Luther King Drive from the junction of West State Line Road to the junction of Johnson Street. Length 2.975 mi.

The Bracket Estimate on this project is from $641,982 to $784,645 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.ACOA62220-ATRP(008) ,LIMESTONE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Clinton Street from the intersection of SR-2 (US-72) to the intersection of Forrest Street and on Forrest Street from the intersection of Clinton Street to the intersection of SR-3 (US-31) in Athens. Length 1.459 mi.

The Bracket Estimate on this project is from $311,634 to $380,886 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.ACOA62973-ATRP(012) ,FRANKLIN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-56 from the intersection of SR-13 (US-43) to the junction of CR-60 in Russellville; on CR-48 from the junction of Clement Road to the Colbert County Line; and on County Line Road from the junction of CR-80 to the junction of CR-48. Length 8.571 mi.

The Bracket Estimate on this project is from $805,239 to $984,181 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.ACOA62974-ATRP(013) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Walnut Gate Road from the intersection of SR-13 (US-43) to the intersection of SR-24 in Russellville. Length 1.786 mi.

The Bracket Estimate on this project is from $430,484 to $526,147 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.BR-1214(257) ,CHOCTAW COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement on CR-23 (Ararat Road) over Little Tallawampa Creek. Length 0.010 mi.

The Bracket Estimate on this project is from $250,558 to $306,237 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.IM-I059(353) ,SUMTER COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-59 from the Mississippi State Line to 0.100 mile north of the South City Limits of Cuba. Length 1.690 mi.

The Bracket Estimate on this project is from $2,837,479 to $3,468,030 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.IM-I059(360) ,GREENE COUNTY

Contract Time: 145 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Bridge Raising on I-59 from the CR-20 Interchange in Lizzieville to the SR-14 Interchange in Eutaw. Length 6.906 mi.

The Bracket Estimate on this project is from $7,857,866 to $9,604,059 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $27.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.IM-IMD-I065(435) ,SHELBY COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Concrete Flumes and Sinkhole Repairs of Backslope Benches on I-65 from north of the SR-119 Interchange (Exit 246) to south of the Valleydale Road Interchange (Exit 247) in Indian Springs. Length 0.473 mi.

The Bracket Estimate on this project is from $1,759,675 to $2,150,714 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $42.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.NH-0003(592) ,ESCAMBIA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from north of the intersection of old US-31 (MP 64.710) to the south end of the Burnt Corn Creek Bridge (MP 68.954) in East Brewton. Length 4.244 mi.

The Bracket Estimate on this project is from $1,330,991 to $1,626,767 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.NH-0010(538) ,PIKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-10 from the intersection of SR-53 (US-231) to east of the junction of East Troy Terrace (MP 181.063) in Brundidge. Length 1.429 mi.

The Bracket Estimate on this project is from $457,816 to $559,552 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.NH-0013(594) ,TUSCALOOSA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from just south of the junction of Tom Montgomery Road (MP 202.010) to south of the junction of CR-56 (MP 202.937) north of Northport. Length 0.926 mi.

The Bracket Estimate on this project is from $892,460 to $1,090,785 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.NH-HSIP-0001(586) ,RANDOLPH COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the beginning of the 4-Lane Section south of Wedowee (MP 192.623) to the south end of the bridge (MP 195.470). Length 2.847 mi.

The Bracket Estimate on this project is from $1,242,763 to $1,518,932 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.NH-HSIP-0005(543) ,WILCOX COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-5 from 0.22 miles north of the intersection of SR-10 in Pine Hill to the Marengo County Line. Length 9.958 mi.

The Bracket Estimate on this project is from $2,173,566 to $2,656,581 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.NH-HSIP-0012 (560) ,COVINGTON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-12 (US-84) from west of the junction of SR-55 in River Falls to near the junction of Choctaw Street in Andalusia. Length 4.298 mi.

The Bracket Estimate on this project is from $2,585,282 to $3,159,789 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-HSIP-0004(529) ,JEFFERSON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe to include Safety Improvements on SR-4 (US-78) from 0.147 miles west of the I-20 Interchange (MP 111.716) to the south end of the Little Cahaba River Bridge (MP 114.611) in Leeds. Length 2.895 mi.

The Bracket Estimate on this project is from $1,870,943 to $2,286,708 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


63.STPAA-HSIP-0048(504) ,RANDOLPH COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-48 from the junction of SR-1 (US-431) in Wedowee to north of Main Street near Woodland. Length 9.271 mi.

The Bracket Estimate on this project is from $3,052,543 to $3,730,885 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-HSIP-0055(511) ,COVINGTON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-55 from the Yellow River (MP 10.366) to the junction of SR-15 in Andalusia. Length 13.181 mi.

The Bracket Estimate on this project is from $2,645,279 to $3,233,119 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-HSIP-0063(504) ,ELMORE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-63 from the end of the 4-Lane Section (MP 6.700) in Eclectic to the Tallapoosa County Line. Length 9.610 mi.

The Bracket Estimate on this project is from $2,446,746 to $2,990,468 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-HSIP-0125(503) & 99-407-160-125-501 ,COFFEE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Drainage Structure Improvements, Resurfacing, and Traffic Stripe on SR-125 from the intersection of SR-167 to the Pike County Line. Length 5.795 mi.

The Bracket Estimate on this project is from $2,304,710 to $2,816,867 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPAA-HSIP-0093(502) & STPAA-HSIP-0201(532) ,PIKE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-93 from the north Town Limits of Brundidge (MP 2.542) to the junction of SR-15 (US-29) in Banks (Site #1) and on SR-201 from the junction of the CSX Railroad/SR-93 to the junction of SR-15 (US-29) in Banks (Site #2). Length 7.302 mi.

The Bracket Estimate on this project is from $1,720,924 to $2,013,352 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPNU-0814(252) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-37 (Nisbet Lake Road) from the junction of Hulsey Road north of Jacksonville to the intersection of Williams Road. Length 2.840 mi.

The Bracket Estimate on this project is from $525,699 to $642,521 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPNU-1714(253) ,COLBERT COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-48 from the pavement joint south of Poplar Creek Loop North to the pavement joint South of the intersection of SR-157. Length 2.476 mi.

The Bracket Estimate on this project is from $415,989 to $508,432 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPNU-1915(250) ,COOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-29 from the Elmore County Line to the intersection of SR-22. Length 5.571 mi.

The Bracket Estimate on this project is from $685,762 to $838,153 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPNU-2615(251) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Traffic Stripe, Pavement Markings, and Pavement Markers on Various County Routes as indicated in the plans. Length 33.893 mi.

The Bracket Estimate on this project is from $241,843 to $295,585 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPNU-2814(251) ,ETOWAH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-446 (Rocky Ford Road) from the junction of Reeves Road in Hokes Bluff to the Cherokee County Line. Length 3.499 mi.

The Bracket Estimate on this project is from $730,230 to $892,503 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPNU-3514 (255) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Smithville Road from the intersection of SR-1 (US-231) to the junction of CR-33 and on CR-33 from the junction of Smithville Road to the intersection of SR-53 northwest of Cottonwood. Length 5.848 mi.

The Bracket Estimate on this project is from $678,925 to $829,797 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPNU-5613(251) ,RANDOLPH COUNTY

Contract Time: 30 Working Days

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-52 from the junction of CR-87 to the Georgia State Line. Length 2.700 mi.

The Bracket Estimate on this project is from $427,345 to $522,310 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPNU-6214(250) ,TALLAPOOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-34 from the junction of Pleasure Point Road near Lake Martin to the intersection of SR-49 south of Dadeville. Length 6.723 mi.

The Bracket Estimate on this project is from $476,710 to $582,646 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


85.99-505-990-500-401 ,HALE, CHILTON, AND PERRY COUNTIES

Contract Time: 40 Working Days

for the Maintenance Bridge Painting on various structures within the West Central Region.

The Bracket Estimate on this project is from $298,376 to $364,682 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


86.99-506-690-000-401 ,MONTGOMERY AND BUTLER COUNTIES

Contract Time: 45 Working Days

for constructing the Bridge Abutment Slope Pavement and Joint Repair on Various Bridges as indicated in the plans.

The Bracket Estimate on this project is from $156,595 to $191,394 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


200.HPP-1602(511) ,MOBILE COUNTY

Contract Time: 65 Working Days

for constructing the Historic Whistler Bike Trail (Bike Path along an abandoned Railroad Corridor) along SR-17 from a point near the I-65 Interchange to a point near the SR-158 Interchange in Prichard. Length 1.293 mi.

The Bracket Estimate on this project is from $623,244 to $761,743 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)