Office Engineer

Proposal Letting List
July 31, 2015, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. ACIM49357F-IMF-I059(357), TUSCALOOSA 5. IMF-I085(338), MONTGOMERY
12. ACBR62451-ATRP(010), FRANKLIN 15. ACBRZ58446-ATRP(016), RUSSELL
16. ACBRZ59390-ATRP(007), GREENE 17. ACBRZ59458-ATRP(015), GENEVA
18. ACBR59572-ATRP(007), ETC., RUSSELL 21. ACNU58409-ATRP(015), BIBB
22. ACNU59576-ATRP(006), RUSSELL 23. ACNU59620-ATRP(010), DALLAS
24. ACNU59756-ATRP(002), CULLMAN 25. ACNU60059-ATRP(007), BLOUNT
**26. ACNU60466-ATRP(008), BULLOCK 27. ACNU61011-ATRP(011), BUTLER
28. ACNU61362-ATRP(008), CLARKE 29. ACNU61886-ATRP(015), SUMTER
*30. ACNU62845-ATRP(006), ETC., DEKALB 34. ACOA58578-ATRP(005), ETC., DALE
37. BR-0269(501), WALKER 40. ERPR-8980(906), MOBILE
43. IM-I010(332), MOBILE 44. IM-I059(359), GREENE
45. IM-I059(380), JEFFERSON 48. NH-0009(558), COVINGTON
**49. NH-0035(529), DEKALB 52. NH-HSIP-0275(503), TALLADEGA
55. STPAA-0003(587), BALDWIN 56. STPAA-0159(502), PICKENS
57. STPAA-4114(250), LEE 58. STPAA-5114(252), MONTGOMERY
59. STPAA-HSIP-0027(510), DALE 60. STPAA-HSIP-0053(576), BLOUNT
61. STPAA-NR13(942), CULLMAN 65. STPBH-7073(601), JEFFERSON
68. STPOA-0815(253), CALHOUN 69. STPOA-0815(254), CALHOUN
70. STPNU-1015(251), ETC., CHEROKEE 71. STPNU-1114(250), CHILTON
72. STPNU-1915(251), COOSA 73. STPNU-2014(250), COVINGTON
74. STPNU-4714(251), MARION 76. STPAA-STPNU-2614(251), ELMORE
78. STPNU-STPOA-0715(250), BUTLER 81. STPOA-4115(252), ETC., LEE
87. 99-506-690-000-401, MONTGOMERY, ETC. 200. STPAA-NR13(901), CONECUH, ETC.
*- WITHDRAWN FROM THE LETTING
**- ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACIM49357F-IMF-I059(357) ,TUSCALOOSA COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:3.50

for constructing the Planing, Resurfacing, Traffic Stripe, Bridge Raising, Bridge Rail Retrofit, and Guardrail Retrofit on I-59/I-20 from south of the CR-10 (Holly Springs Lane) Interchange in Fosters to north of the CR-1900 (Joe Mallisham Parkway) Interchange. Length 6.488 mi.

The Bracket Estimate on this project is from $15,933,924 to $19,474,796 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $31.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.IMF-I085(338) ,MONTGOMERY COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:3.50

for constructing the Pavement Rehabilitation (Planing, Resurfacing, Traffic Stripe, Guardrail Replacement, Barrier Extension, Bridge Rail Retrofit, and ITS Installation) on I-85 from the Hall Street Overpass to just east of Ann Street (MP 3.300). Length 1.530 mi.

The Bracket Estimate on this project is from $6,210,540 to $7,590,660 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACBR62451-ATRP(010) ,FRANKLIN COUNTY

Contract Time: 90 Working Days

for constructing the Bridge Replacement on CR-58 over Tollison Creek northwest of Russellville. Length 0.117 mi.

The Bracket Estimate on this project is from $459,093 to $561,113 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ58446-ATRP(016) ,RUSSELL COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches with Pedestrian Walkway on 12th Avenue over Holland Creek in Phenix City. Length 0.103 mi.

The Bracket Estimate on this project is from $660,263 to $806,988 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ59390-ATRP(007) ,GREENE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-120 over Bangdoodle Branch north of West Greene. Length 0.079 mi.

The Bracket Estimate on this project is from $507,882 to $620,745 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ59458-ATRP(015) ,GENEVA COUNTY

Contract Time: 50 Working Days

for constructing the Bridge Replacement on CR-194 (Windy Hill Road) over Wide Branch west of Black. Length 0.143 mi.

The Bracket Estimate on this project is from $227,123 to $277,595 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBR59572-ATRP(007) & ACBR59573-ATRP(007) ,RUSSELL COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement on CR-137 (Uchee Hill Highway) over Little Uchee Creek Relief southwest of Phenix City and on CR-137 (Pittsview Highway) over Weolusee Creek in Pittsview. Length 0.140 mi.

The Bracket Estimate on this project is from $1,147,802 to $1,402,869 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ACNU58409-ATRP(015) ,BIBB COUNTY

Contract Time: 135 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe to include Roadway Pipe Replacement and Minor Culvert Extension on CR-58 from the junction of SR-6 (US-82) to the intersection of SR-5 in Brent. Length 3.280 mi.

The Bracket Estimate on this project is from $1,121,238 to $1,370,402 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.ACNU59576-ATRP(006) ,RUSSELL COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-39 (Greenburt Road) from the junction of CR-4 (Cottonton Road) to the intersection of CR-18 (Oswichee Road). Length 6.679 mi.

The Bracket Estimate on this project is from $778,776 to $951,838 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU59620-ATRP(010) ,DALLAS COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing, Reconstruction, and Traffic Stripe on a portion of CR-45 from a point approximately 0.170 mile north of the junction of CR-188 for a distance of approximately 1.400 miles. Length 1.331 mi.

The Bracket Estimate on this project is from $588,860 to $719,718 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACNU59756-ATRP(002) ,CULLMAN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-747 from the Blount County Line to the junction of CR-1545 northwest of Fairview. Length 14.392 mi.

The Bracket Estimate on this project is from $2,430,990 to $2,971,210 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACNU60059-ATRP(007) ,BLOUNT COUNTY

Contract Time: 125 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-8 from the Jefferson County Line to the junction of SR-160 (Site #1); on CR-26 from the Cullman County Line to the junction of SR-79 east of Blountsville (Site #2); on CR-26 from the junction of SR-79 east of Blountsville to the junction of SR-75 (Site #3); and on CR-29 from the junction of CR-27 to the junction of SR-53 (US-231) east of Oneonta (Site #4). Length 25.784 mi.

The Bracket Estimate on this project is from $5,223,349 to $6,384,092 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.ACNU60466-ATRP(008) ,BULLOCK COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-8 from the junction of SR-223 to the intersection of SR-15 (US-29) in Perote. Length 6.347 mi.

The Bracket Estimate on this project is from $1,387,292 to $1,695,579 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

**ALL BIDS REJECTED**

Return To: Proposal Letting List (Top of web page)


27.ACNU61011-ATRP(011) ,BUTLER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-37 from the junction of SR-106 in Georgiana to the intersection of SR-3 (US-31) in Chapman. Length 4.114 mi.

The Bracket Estimate on this project is from $427,511 to $522,514 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACNU61362-ATRP(008) ,CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-35 (Old Line Road) from the junction of SR-12 (US-84) southeast of Whatley to the Wilcox County Line. Length 16.832 mi.

The Bracket Estimate on this project is from $1,641,842 to $2,006,696 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.ACNU61886-ATRP(015) ,SUMTER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing, Traffic Stripe, Culvert Extensions, and Guardrail Installations on CR-21 from the junction of SR-8 (US-80) northeast of Bellamy to the junction of SR-28. Length 4.946 mi.

The Bracket Estimate on this project is from $882,484 to $1,078,591 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACNU62845-ATRP(006), ACNU62846-ATRP(003) & ACNU62847-ATRP(007) ,DEKALB COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Various Routes at Various Locations as indicated in the plans. Length 15.134 mi.

The Bracket Estimate on this project is from $3,093,862 to $3,781,387 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


34.ACOA58578-ATRP(005), ACNU58580-ATRP(004), ACOA60531-ATRP(006) & ACOA60532-ATRP(004) ,DALE COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe at Various Routes as indicated in the plans. Length 20.093 mi.

The Bracket Estimate on this project is from $2,835,782 to $3,465,956 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.BR-0269(501) ,WALKER COUNTY

Contract Time: 220 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grade, Drain, Base, and Pave) on SR-269 over the Abandoned Alabama Power Railroad and Baker Creek east of Goodsprings. Length 0.543 mi.

The Bracket Estimate on this project is from $4,821,958 to $5,893,504 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.ERPR-8980(906) ,MOBILE COUNTY

Contract Time: 30 Working Days

for constructing the Slide Repair on the Westbound Lane of I-10 at Exit 17 (Range Line Road) in Mobile. Length 0.056 mi.

The Bracket Estimate on this project is from $109,742 to $134,130 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.IM-I010(332) ,MOBILE COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Guardrail, Cable Guiderail, Bridge Rail Retrofit, Weigh Station Improvements, and Weigh-In-Motion Station Installation on I-10 from the Mississippi State Line to Exit 10 (CR-39/McDonald Road) Interchange north of Irvington. Length 10.081 mi.

The Bracket Estimate on this project is from $8,749,344 to $10,693,642 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.IM-I059(359) ,GREENE COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Bridgerail Retrofit, Guardrail Installation, and Traffic Stripe on I-59 from the CR-211 Overpass northeast of Eutaw to the Tuscaloosa County Line. Length 8.362 mi.

The Bracket Estimate on this project is from $8,817,298 to $10,776,697 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.IM-I059(380) ,JEFFERSON COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:2.00

for constructing the Roadway and Interchange Lighting on I-59 from the I-459 Interchange to Exit 141 (CR-10/Chalkville Road) in Trussville. Length 3.727 mi.

The Bracket Estimate on this project is from $1,537,599 to $1,879,288 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.NH-0009(558) ,COVINGTON COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on SR-9 (Opp Bypass) from 0.40 mile east of SR-12 (US-84) to 700 feet south of Bellmont Road in Opp. Length 7.413 mi.

The Bracket Estimate on this project is from $3,280,022 to $4,008,915 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.NH-0035(529) ,DEKALB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on SR-35 from north of the Cherokee County Line (MP 14.590) to the intersection of CR-89 (Desoto Parkway) in Fort Payne. Length 5.020 mi.

The Bracket Estimate on this project is from $1,434,905 to $1,753,772 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


52.NH-HSIP-0275(503) ,TALLADEGA COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-275 from the junction of SR-21 to the junction of SR-77 in Talladega. Length 2.695 mi.

The Bracket Estimate on this project is from $1,251,919 to $1,530,123 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-0003(587) ,BALDWIN COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-3 (US-31) from just east of the junction of Eastern Shore Boulevard (MP 3.950) north of Malbis to just west of the junction of SR-3 (US-31) and SR-59 (MP 9.670) south of Stapleton. Length 5.720 mi.

The Bracket Estimate on this project is from $990,659 to $1,210,806 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPAA-0159(502) ,PICKENS COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on SR-159 from the junction of Zion Road (MP 8.700) north of Gordo to the junction of Raymond Robertson Road (MP 12.900) south of Fayette. Length 4.200 mi.

The Bracket Estimate on this project is from $688,455 to $841,446 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-4114(250) ,LEE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:2.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-246 from the intersection of CR-179 to the junction of CR-295 in Smiths Station. Length 2.927 mi.

The Bracket Estimate on this project is from $650,548 to $795,114 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-5114(252) ,MONTGOMERY COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-39 (Mt. Zion Road) from the intersection of CR-70 (Davis Crossroads) to the junction of Woodley Road south of Montgomery. Length 6.327 mi.

The Bracket Estimate on this project is from $968,899 to $1,184,210 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-HSIP-0027(510) ,DALE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-27 from the Coffee County Line to the junction of SR-53 (US-231) in Ozark. Length 7.956 mi.

The Bracket Estimate on this project is from $1,811,388 to $2,213,919 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0053(576) ,BLOUNT COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-53 (US-231) from the intersection of SR-75 in Oneonta to the junction of SR-79 in Cleveland. Length 8.650 mi.

The Bracket Estimate on this project is from $2,855,580 to $3,490,153 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPAA-NR13(942) ,CULLMAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Curb and Ramp Installation on Various State Routes as indicated in the plans.

The Bracket Estimate on this project is from $337,710 to $412,757 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPBH-7073(601) ,JEFFERSON COUNTY

Contract Time: 75 Working Days

for constructing the Intersection Improvements (Widening, Traffic Signals, and Lighting) on SR-7 (US-11) at CR-130 (Edwards Lake Road) and the Ramps at the intersection of SR-7 (US-11) and I-459 in Birmingham. Length 0.543 mi.

The Bracket Estimate on this project is from $2,573,986 to $3,145,983 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $54.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPOA-0815(253) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-73 (Pleasant Valley Road) from the intersection of SR-204 to the intersection of Rocky Hollow Road northwest of Jacksonville. Length 4.112 mi.

The Bracket Estimate on this project is from $665,535 to $813,431 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPOA-0815(254) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Jennifer Lane from the Cleburne County Line to the junction of Mellon Bridge Road in Oxford. Length 1.664 mi.

The Bracket Estimate on this project is from $319,558 to $390,571 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPNU-1015(251) & STPNU-1015(250) ,CHEROKEE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-20 from the junction of CR-150 to Garretts Bridge over the Coosa River in Centre (Site #1) and on CR-33 from the Calhoun County Line to the junction of CR-308 northwest of Spring Garden (Site #2). Length 3.800 mi.

The Bracket Estimate on this project is from $463,202 to $566,136 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPNU-1114(250) ,CHILTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-54 from the junction of CR-73 south of Wilton to the Shelby County Line. Length 3.899 mi.

The Bracket Estimate on this project is from $790,056 to $965,624 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPNU-1915(251) ,COOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-91 from the junction of SR-9 to the junction of SR-22 southwest of Alexander City. Length 2.763 mi.

The Bracket Estimate on this project is from $355,160 to $434,084 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPNU-2014(250) ,COVINGTON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-4 from the junction of CR-20 (Old Farm Road) to the intersection of SR-55 in Lockhart. Length 7.220 mi.

The Bracket Estimate on this project is from $974,028 to $1,190,479 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPNU-4714(251) ,MARION COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-42 from the junction of CR-51 to the intersection of CR-45 south of Hamilton. Length 6.780 mi.

The Bracket Estimate on this project is from $1,299,298 to $1,588,030 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPAA-STPNU-2614(251) ,ELMORE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on Various Sites as indicated in the plans. Length 5.580 mi.

The Bracket Estimate on this project is from $535,369 to $654,340 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPNU-STPOA-0715(250) ,BUTLER COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Leveling, Resurfacing, and Traffic Stripe on CR-37 from the junction of CR-30 northeast of Georgiana to the intersection of SR-3 (US-31) south of Greenville. Length 6.080 mi.

The Bracket Estimate on this project is from $654,159 to $799,527 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.STPOA-4115(252) & STPOA-9009(600) ,LEE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on South Gay Street from the intersection of Woodfield Drive to the intersection of Reese Avenue and Resurfacing, Traffic Stripe, and Traffic Signal Replacement on Woodfield Drive from the intersection of South College Street to the intersection of CR-40 (South Gay Street) in Auburn. Length 0.885 mi.

The Bracket Estimate on this project is from $395,159 to $482,972 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


87.99-506-690-000-401 ,MONTGOMERY AND BUTLER COUNTIES

Contract Time: 45 Working Days

for constructing the Bridge Abutment Slope Pavement and Joint Repair on Various Bridges as indicated in the plans.

The Bracket Estimate on this project is from $112,976 to $138,082 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(901) ,CONECUH AND ESCAMBIA COUNTIES

Contract Time: 90 Working Days

for constructing the Curb Ramp Installations and Improvements on Various State Routes as indicated in the plans.

The Bracket Estimate on this project is from $128,625 to $157,208 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)