*4. ACAA61048-ATRP(003), MONTGOMERY 6. ACBR59659-ATRP(005), LIMESTONE
9. ACBRZ59491-ATRP(008), ETC., JEFFERSON 10. ACBRZ60420-ATRP(003), ETC., RANDOLPH
11. ACBRZ61145-ATRP(015), LEE 12. ACBRZ61167-ATRP(005), BALDWIN
*18. ACNU60293-ATRP(005), BIBB *19. ACNU60295-ATRP(006), BIBB
20. ACNU60425-ATRP(013), RANDOLPH 23. ACNU61347-ATRP(015), CLARKE
24. ACNU62845-ATRP(006), ETC., DEKALB 31. BR-0002(528), LAUDERDALE
33. BR-0214(251), BALDWIN 36. CMAQ-3715(253), JEFFERSON
39. ERPR-8980(909), BALDWIN 42. HSIP-0063(506), TALLAPOOSA
46. IM-I065(406), MONTGOMERY 47. IM-I065(452), CULLMAN
51. NH-HSIP-0001(589), MADISON 52. NH-HSIP-0006(556), MONTGOMERY
53. NH-HSIP-0008(582), MARENGO 56. SRTS-SR11(906), LOWNDES
59. STPAA-0118(511), MARION 60. STPAA-0167(507), GENEVA
62. STPAA-0177(502), CLARKE 65. STPAA-HSIP-0056(503), WASHINGTON
66. STPAA-HSIP-0126(500), ETC., MONTGOMERY 68. STPAA-NR13(949), CHAMBERS, ETC.
70. STPAA-STPOA-4214(258), LIMESTONE 73. STPBH-7002(601), JEFFERSON
77. STPNU-1715(250), COLBERT 79. STPNU-3214(252), GREENE
82. STPNU-5214(253), MORGAN **91. ST-005-160-007, BLOUNT
200. STPAA-NR13(958), CLARKE, ETC. 201. STPAA-NR13(959), COVINGTON, ETC.
*-WITHDRAWN FROM THE LETTING
**-ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


4.ACAA61048-ATRP(003) ,MONTGOMERY COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-233 (Fairview Avenue) from 0.1 mile south of the intersection of Airbase Boulevard to the I-65 Interchange in Montgomery. Length 1.153 mi.

The Bracket Estimate on this project is from $1,127,763 to $1,378,377 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


6.ACBR59659-ATRP(005) ,LIMESTONE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches at various sites on CR-304 (Ragsdale Creek Road) over Ragsdale Creek northeast of Elkmont. Length 0.255 mi.

The Bracket Estimate on this project is from $667,775 to $816,169 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ACBRZ59491-ATRP(008) & ACBRZ59492-ATRP(008),JEFFERSON COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacements on 3rd Avenue and 8th Avenue North over Halls Creek in Bessemer. Length 0.100 mi.

The Bracket Estimate on this project is from $495,169 to $605,207 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ60420-ATRP(003) & ACBRZ60421-ATRP(003) ,RANDOLPH COUNTY

Contract Time: 160 Working Days

DBE Goal Percent:2.00

for the constructing the Bridge Replacement and Approaches on CR-427 over a Branch off of Cohobadiah Creek (Site #1) and on CR-425 over Cohobadiah Creek (Site #2) north of Newell. Length 0.187 mi.

The Bracket Estimate on this project is from $666,905 to $815,107 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ61145-ATRP(015) ,LEE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-375 over a tributary to Osanippa Creek northeast of Beulah. Length 0.011 mi.

The Bracket Estimate on this project is from $266,931 to $326,249 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.ACBRZ61167-ATRP(005) ,BALDWIN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-34 over Negro Creek east of Summerdale. Length 0.317 mi.

The Bracket Estimate on this project is from $1,303,136 to $1,592,722 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACNU60293-ATRP(005) ,BIBB COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-36 from the Chilton County Line to the junction of SR-6 (US-82) southwest of Lawley. Length 1.469 mi.

The Bracket Estimate on this project is from $267,542 to $326,995 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


19.ACNU60295-ATRP(006) ,BIBB COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-65 (Bulldog Bend Road) from the junction of SR-25 to the intersection of CR-24 south of Seymour. Length 5.799 mi.

The Bracket Estimate on this project is from $1,030,234 to $1,259,175 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

**WITHDRAWN FROM THE LETTING**

Return To: Proposal Letting List (Top of web page)


20.ACNU60425-ATRP(013) ,RANDOLPH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-51 from a point 895 feet north of the intersection of CR-59 in Woodland to the Cleburne County Line. Length 8.741 mi.

The Bracket Estimate on this project is from $1,495,335 to $1,827,632 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACNU61347-ATRP(015) ,CLARKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-3 (McVay Road) from the junction of SR-13 (US-43) in Jackson to the junction of Winn Road. Length 1.822 mi.

The Bracket Estimate on this project is from $257,777 to $315,061 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ACNU62845-ATRP(006), ACNU62846-ATRP(003) & ACNU62847-ATRP(007) ,DEKALB COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on various routes at various locations as indicated in the plans. Length 15.134 mi.

The Bracket Estimate on this project is from $3,093,862 to $3,781,387 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.BR-0002(528) ,LAUDERDALE COUNTY

Contract Time: 310 Working Days

DBE Goal Percent:12.00

for constructing the Bridge Replacement and Approaches (Grade, Drain, Base, and Pave) on SR-2 (US-72) over Second Creek west of Rogersville. Length 0.653 mi.

The Bracket Estimate on this project is from $4,544,335 to $5,554,188 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $55.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.BR-0214(251) ,BALDWIN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Bridge Culvert) and Approaches on CR-55 over an Unnamed Branch of Polecat Creek west of Summerdale. Length 0.151 mi.

The Bracket Estimate on this project is from $828,021 to $1,012,026 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.CMAQ-3715(253) ,JEFFERSON COUNTY

Contract Time: 55 Working Days

for constructing the Sidewalks on Preserve Parkway from the junction of CR-1140 (Sulphur Springs Road) to the Preserve Town Center in Hoover. Length 1.024 mi.

The Bracket Estimate on this project is from $485,239 to $593,070 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.ERPR-8980(909) ,BALDWIN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:5.00

for constructing the Grade, Drain, Base, Pave, and Drainage Structure Replacements on CR-32 at various sites from the intersection of CR-73 to the junction of CR-83 in Summerdale. Length 0.173 mi.

The Bracket Estimate on this project is from $733,627 to $896,655 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.HSIP-0063(506) ,TALLAPOOSA COUNTY

Contract Time: 35 Working Days

for constructing the Traffic Signal Upgrade on SR-63 at the intersection of Main Street in Alexander City.

The Bracket Estimate on this project is from $160,856 to $196,601 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.IM-I065(406) ,MONTGOMERY COUNTY

Contract Time: 300 Working Days

for constructing the Bridge Repair (Girders, Caps, and Bearing Pads) on I-65 Northbound Relief Bridges in Montgomery.

The Bracket Estimate on this project is from $2,149,907 to $2,627,664 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.IM-I065(452) ,CULLMAN COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:10.00

for constructing the Interchange Ramp Improvements (Concrete Pavement Replacement and Deceleration Lane Addition) on I-65 at SR-157 in Cullman. Length 0.942 mi.

The Bracket Estimate on this project is from $2,352,200 to $2,874,911 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.NH-HSIP-0001(589) ,MADISON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from just south of the intersection of Old Highway 431 (MP 316.280) in New Hope to just south of the junction of Victorian Lane (MP 321.240) in Owens Crossroads. Length 4.959 mi.

The Bracket Estimate on this project is from $2,437,952 to $2,979,720 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.NH-HSIP-0006(556) ,MONTGOMERY COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from the junction of SR-8 (US-80) at MP 158.668 to a pavement joint just south of SR-271 (MP 162.272) and on the westbound lane only from MP 165.800 to MP 166.441. Length 4.244 mi.

The Bracket Estimate on this project is from $3,162,276 to $3,865,004 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.NH-HSIP-0008(582) ,MARENGO COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the Hale County Line (MP 46.417) west of Faunsdale to the Perry County Line (MP 53.820) in Uniontown. Length 7.402 mi.

The Bracket Estimate on this project is from $1,888,640 to $2,308,338 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.SRTS-SR11(906) ,LOWNDES COUNTY

Contract Time: 30 Working Days

for constructing the Infrastructure Improvements (Sidewalks) on various routes at various locations in Fort Deposit as indicated in the plans.

The Bracket Estimate on this project is from $138,709 to $169,533 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-0118(511) ,MARION COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Traffic Stripe, and Curb Ramp Installation on SR-118 from near the junction of CR-69 (MP 24.410) to near the junction of CR-60 (MP 29.912) in Winfield. Length 5.501 mi.

The Bracket Estimate on this project is from $2,667,366 to $3,260,114 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-0167(507) ,GENEVA COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic on SR-167 from just north of the junction of SR-123 (MP 7.087) in Hartford to the Dale County Line. Length 8.774 mi.

The Bracket Estimate on this project is from $1,609,027 to $1,966,588 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-0177(502) ,CLARKE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-177 from the junction of SR-13 (US-43) to the junction of Miller Street (MP 2.188) in Jackson. Length 2.177 mi.

The Bracket Estimate on this project is from $1,177,312 to $1,438,937 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-HSIP-0056(503) ,WASHINGTON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-56 from east of the junction of CR-1 (MP 12.948) in Chatom to west of the junction of SR-13 (US-43) (MP 27.661) in Wagarville. Length 14.712 mi.

The Bracket Estimate on this project is from $3,385,163 to $4,137,422 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-HSIP-0126(500) & STPAA-HSIP-0293(500) ,MONTGOMERY COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, Traffic Stripe, and Bridge Guardrail Retrofit on various routes at various locations as indicated in the plans. Length 8.189 mi.

The Bracket Estimate on this project is from $2,670,370 to $3,263,786 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-NR13(949) ,CHAMBERS, COOSA, AND TALLAPOOSA COUNTIES

Contract Time: 120 Working Days

for constructing the Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $307,791 to $376,189 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPAA-STPOA-4214(258) ,LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on East Limestone Road from the junction of SR-2 (US-72) east of Athens to the intersection of Copeland Road. Length 4.858 mi.

The Bracket Estimate on this project is from $718,343 to $877,975 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPBH-7002(601) ,JEFFERSON COUNTY

Contract Time: 80 Working Days

for the Demolition and Structure Removal on CR-52 (Morgan Road) from the I-459 Overpass in Bessemer to the intersection of South Shades Crest Road at various locations as indicated in the plans.

The Bracket Estimate on this project is from $99,881 to $122,077 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


77.STPNU-1715(250) ,COLBERT COUNTY

Contract Time: 30 Working Days

for constructing the Installation of Traffic Stripe, Pavement Markers, Markings, and Legends on various routes as indicated in the plans. Length 32.005 mi.

The Bracket Estimate on this project is from $277,653 to $339,354 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPNU-3214(252) ,GREENE COUNTY

Contract Time: 30 Working Days

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-148 from the intersection of SR-13 (US-43) to Dollar Hide Camp. Length 2.665 mi.

The Bracket Estimate on this project is from $330,086 to $403,438 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


82.STPNU-5214(253) ,MORGAN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:10.00

for constructing the Resurfacing, Guardrail Installation, and Traffic Stripe on CR-73 (Eva Road) from the junction of Peck Mountain Road to the intersection of SR-67 in Florette. Length 2.276 mi.

The Bracket Estimate on this project is from $636,939 to $778,481 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


91.ST-005-160-007 ,BLOUNT COUNTY

Contract Time: 125 Working Days

for constructing the Intersection Improvements (Grade, Drain, Base, and Pave) on SR-160 at the junction of Mountain Woods Lake Road to include Drainage Corrections at the junction of Standholton Drive east of Smoke Rise. Length 0.369 mi.

The Bracket Estimate on this project is from $1,905,274 to $2,328,668 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $43.00 per set.

**ALL BIDS REJECTED**

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(958) ,CLARKE, CHOCTAW, AND WASHINGTON COUNTIES

Contract Time: 70 Working Days

for constructing the ADA Required Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $224,622 to $274,537 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)


201.STPAA-NR13(959) ,COVINGTON AND COFFEE COUNTIES

Contract Time: 75 Working Days

for constructing the Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $271,573 to $331,923 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)