November 03, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

*4. ACAA60993-ATRP(008), JEFFERSON 8. ACBR61344-ATRP(008), CHOCTAW
*11. ACBRZ58501-ATRP(015), TUSCALOOSA 12. ACBRZ59457-ATRP(002), GENEVA
*16. ACBRZ61377-ATRP(016), ETOWAH 17. ACBRZ61890-ATRP(017), SUMTER
20. ACNU61041-ATRP(013), DALLAS 23. ACOA59432-ATRP(002), TUSCALOOSA
25. ACOA61869-ATRP(016), TUSCALOOSA 30. BR-0059(514), BALDWIN
31. BR-0155(502), CHILTON 34. FLAP-FLAP(006), MARENGO
37. HSIP-I065(477), BUTLER, ETC. 44. NH-0001(600), HOUSTON
45. NH-0002(577), JACKSON 48. NH-0057(500), WASHINGTON
51. RP-BR-0205(506), MARSHALL 54. STPAA-0003(612), LOWNDES
55. STPAA-0006(569), ETC., BULLOCK 57. STPAA-0162(504), WILCOX
58. STPAA-0182(504), BALDWIN 63. STPAA-HSIP-0134(507), COFFEE, ETC.
64. STPAA-HSIP-0265(501), MONROE 67. STPNU-3616(251), JACKSON
70. STPNU-HSIP-0052(514), ETC., GENEVA 74. 99-507-555-053-701, PIKE
76. 99-510-690-000-700, GREENE
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


4.ACAA60993-ATRP(008) ,JEFFERSON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Messer Airport Highway from the junction of 31st Street North to the junction of 46th Street North in Birmingham. Length 1.708 mi.

The Bracket Estimate on this project is from $1,037,726 to $1,268,332 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


8.ACBR61344-ATRP(008) ,CHOCTAW COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement on CR-9 over Clear Creek south of Halsell. Length 0.022 mi.

The Bracket Estimate on this project is from $597,956 to $730,835 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ58501-ATRP(015) ,TUSCALOOSA COUNTY

Contract Time: 75 Working Days

for constructing the Bridge Replacement on CR-155 (South Sandy Road) over Big Sandy Creek. Length 0.045 mi.

The Bracket Estimate on this project is from $410,858 to $502,160 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


12.ACBRZ59457-ATRP(002) ,GENEVA COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-21 (Alaflo Road) over an Unnamed Tributary to Limestone Creek southwest of Samson. Length 0.146 mi.

The Bracket Estimate on this project is from $294,633 to $360,106 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ61377-ATRP(016) ,ETOWAH COUNTY

Contract Time: 45 Working Days

for constructing the Bridge Replacement (Precast) on Coats Bend Circle over an Unnamed Tributary to the Coosa River north of Hokes Bluff. Length 0.007 mi.

The Bracket Estimate on this project is from $235,154 to $287,411 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


17.ACBRZ61890-ATRP(017) ,SUMTER COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement on CR-5 over Kinterbish Creek 1.000 mile north of the junction of CR-1. Length 0.091 mi.

The Bracket Estimate on this project is from $418,898 to $511,986 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACNU61041-ATRP(013) ,DALLAS COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Reconstruction, and Traffic Stripe on CR-45 from 0.500 mile south of the intersection of CR-189 to the junction of SR-8 (US-80). Length 3.045 mi.

The Bracket Estimate on this project is from $684,682 to $836,834 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.ACOA59432-ATRP(002) ,TUSCALOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-59 (Lock 17 Road) from the North City Limits of Brookwood to the junction of Groundhog Road. Length 12.037 mi.

The Bracket Estimate on this project is from $3,265,118 to $3,990,700 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ACOA61869-ATRP(016) ,TUSCALOOSA COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:8.00

for constructing the Additional Lanes (Grading, Drainage, Base, and Pavement), Resurfacing, and Traffic Stripe on Old Birmingham Highway from a point east of the I-20/59 Interchange to the Jefferson County Line. Length 0.560 mi.

The Bracket Estimate on this project is from $580,536 to $709,544 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.BR-0059(514) ,BALDWIN COUNTY

Contract Time: 200 Working Days

for the Maintenance Bridge Painting on SR-59 over the Intracoastal Waterway in Gulf Shores. Length 0.333 mi.

The Bracket Estimate on this project is from $2,193,799 to $2,681,309 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.BR-0155(502) ,CHILTON COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:10.00

for constructing the Bridge Replacement (Grading, Drainage, Base, and Pavement) on SR-155 over the CSXT Railroad northwest of Jemison. Length 0.473 mi.

The Bracket Estimate on this project is from $2,394,080 to $2,926,098 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $45.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.FLAP-FLAP(006) ,MARENGO COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Roadway Improvements (Grading, Drainage, Base, Pavement and Traffic Stripe) on Gandy Ferry Road (Spillway Falls Park Access Road) from the junction of Lower Pool Road to the junction of Lock and Dam Road in Demopolis. Length 0.921 mi.

The Bracket Estimate on this project is from $632,100 to $772,567 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $26.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.HSIP-I065(477) ,BUTLER, LOWNDES, AND MONTGOMERY COUNTIES

Contract Time: 130 Working Days

for constructing the Cable Guiderail Installation on I-65 from 0.500 mile north of the CR-28 Overpass west of Boling to the Catoma Creek Overpass in Montgomery. Length 46.699 mi.

The Bracket Estimate on this project is from $2,108,081 to $2,576,543 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.NH-0001(600) ,HOUSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Pavement Preservation on SR-1 (US-231/US-431) from just north of the junction of SR-210 (US-231/Ross Clark Circle) to the junction of Speigner Street in Dothan. Length 3.875 mi.

The Bracket Estimate on this project is from $1,090,166 to $1,332,426 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.NH-0002(577) ,JACKSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from north of the intersection of CR-94 to the Tennessee State Line. Length 3.490 mi.

The Bracket Estimate on this project is from $3,218,183 to $3,933,335 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.NH-0057(500) ,WASHINGTON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-57 (US-45) from the junction of SR-17 to the Escatawpa River Bridge (MP 7.891) southeast of Fruitdale. Length 7.770 mi.

The Bracket Estimate on this project is from $1,224,588 to $1,496,719 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.RP-BR-0205(506) ,MARSHALL COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grading, Drainage, Base, Pavement, and Retaining Wall) on SR-205 over Drum Creek in Albertville. Length 0.340 mi.

The Bracket Estimate on this project is from $1,915,690 to $2,341,399 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-0003(612) ,LOWNDES COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.750 mile south of the junction of Julian Town Road to the Montgomery County Line. Length 5.208 mi.

The Bracket Estimate on this project is from $2,147,264 to $2,624,434 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-0006(569) & STPAA-0197(500) ,BULLOCK COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Concrete Pavement Rehabilitation, and Traffic Stripe on SR-6 from the junction of SR-15 to the end of the concrete pavement on US-82 (MP 199.141) (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-197 from the junction of SR-15 (US-29) to the junction of SR-6 (US-82) (Site 2) in Union Springs. Length 1.296 mi.

The Bracket Estimate on this project is from $1,424,163 to $1,740,644 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-0162(504) ,WILCOX COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on SR-162 from 1.750 miles west of the junction of CR-193 (Clifton Ferry Road) to 2.500 miles east of the junction of CR-194 (Gates Road). Length 6.620 mi.

The Bracket Estimate on this project is from $764,177 to $933,994 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-0182(504) ,BALDWIN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-182 from MP 0.000 to the junction of West Lagoon Avenue in Gulf Shores. Length 5.189 mi.

The Bracket Estimate on this project is from $844,796 to $1,032,529 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPAA-HSIP-0134(507) ,COFFEE AND COVINGTON COUNTIES

Contract Time: 85 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-134 from the junction of SR-9 (US-331) in Opp to the junction of SR-87 west of Goodman. Length 12.250 mi.

The Bracket Estimate on this project is from $3,196,589 to $3,906,942 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-HSIP-0265(501) ,MONROE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:2.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-265 from the junction of SR-21 to the Wilcox County Line north of Beatrice. Length 7.924 mi.

The Bracket Estimate on this project is from $1,380,301 to $1,687,034 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPNU-3616(251) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-63 from the Marshall County Line to the junction of Hodges Street in Woodville. Length 1.665 mi.

The Bracket Estimate on this project is from $459,150 to $561,184 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPNU-HSIP-0052(514) & HSIP-0167(510) ,GENEVA COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-52 from the East City Limits of Geneva to the intersection of SR-167 in Hartford to include the Scoring of Paved Safety Shoulders on SR-167 from the Florida State Line to the junction of SR-123 in Hartford. Length 8.600 mi.

The Bracket Estimate on this project is from $1,810,017 to $2,212,243 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.99-507-555-053-701 ,PIKE COUNTY

Contract Time: 40 Working Days

for constructing the Bridge Scour Repair and Countermeasure Placement on the Southbound Roadway of SR-53 (US-231) at MP 79.912.

The Bracket Estimate on this project is from $439,063 to $536,632 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.99-510-690-000-700 ,GREENE COUNTY

Contract Time: 65 Working Days

for the Maintenance Bridge Painting on CR-55 over I-20/59 northeast of Knoxville and on CR-56 over I-20/59 southeast of Ralph in the West Central Region.

The Bracket Estimate on this project is from $411,218 to $452,836 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items