Office Engineer

Proposal Letting List
December 01, 2017, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

1. BRF-0117(501), DEKALB 3. HSIPF-0005(542), BIBB
4. HSIP-I020(347), CLEBURNE, ETC. 11. NHF-IMF-I065(354), SHELBY
19. ACBR60444-ATRP(005), WILCOX *20. ACBRZ60455-ATRP(008), MARION
23. ACBRZ61056-ATRP(017), TALLAPOOSA 27. ACBRZ62143-ATRP(004), ETC., LAUDERDALE
28. ACBRZ61377-ATRP(016), ETOWAH 30. ACNU61043-ATRP(011), DALLAS
*33. ACOA56068-ATRP(014), COLBERT 34. ACOA59443-ATRP(017), TUSCALOOSA
*38. BR-0010(505), CHOCTAW 45. HSIP-0042(526), BALDWIN
46. RP-IM-I085(358), ETC., MONTGOMERY 49. IM-I010(341), MOBILE
53. NH-0001(599), HENRY 54. NH-0006(570), AUTAUGA
55. NH-0008(589), RUSSELL 56. NH-0038(534), SHELBY
57. NH-0074(541), ETC., BLOUNT 59. NH-HSIP-0021(553), TALLADEGA
62. NH-0003(609), ETC., SHELBY 63. STPNU-0025(551), MARENGO, ETC.
64. STPAA-0056(504), WASHINGTON 65. STPAA-0075(531), BLOUNT
66. STPAA-0101(568), LAUDERDALE 67. STPAA-0003(610), ETC., BLOUNT
69. STPNU-HSIP-0010(542), HENRY 70. STPAA-HSIP-0018(509), FAYETTE
72. STPAA-HSIP-0021(559), WILCOX 73. STPNU-HSIP-0021(561), MONROE
74. STPAA-HSIP-0094(501), MONTGOMERY 75. STPAA-HSIP-0141(503), COFFEE
79. STPNU-2217(250), CULLMAN 80. STPNU-6717(251), WINSTON
88. 99-501-695-000-701, ETOWAH, ETC.
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BRF-0117(501) ,DEKALB COUNTY

Contract Time: 170 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement (Grading, Drainage, Base, Pavement, and Retaining Wall) on SR-117 over the West Fork of the Little River in Mentone. Length 0.463 mi.

The Bracket Estimate on this project is from $2,716,901 to $3,320,657 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $47.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Tuesday, November 21, 2017, at the Alabama Department of Transportation, North Region-Guntersville Area Office, Conference Room A, 23445 US Highway 431, Guntersville, AL 35976 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


3.HSIPF-0005(542) ,BIBB COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:9.00

for constructing the Roundabout (Grading, Drainage, Base, Pavement, and Lighting) on SR-5 at the intersection of CR-58 in Brent. Length 0.254 mi.

The Bracket Estimate on this project is from $1,828,769 to $2,235,162 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $40.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.HSIP-I020(347) ,CLEBURNE AND CALHOUN COUNTIES

Contract Time: 75 Working Days

for constructing the Median Barrier Protection (Cable Guiderail Installation) on I-20 from 0.400 mile east of the Snow Creek Bridge to the SR-46 Interchange. Length 18.720 mi.

The Bracket Estimate on this project is from $1,387,191 to $1,695,455 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.NHF-IMF-I065(354) ,SHELBY COUNTY

Contract Time: 7/31/2020 Completion Date

DBE Goal Percent:8.00

for constructing the Roadway Improvements and Bridge Widening (Grading, Drainage, Pavement, Concrete Barrier Rail, Signing, Signals, Lighting, and Traffic Counting Units) on I-65 from the SR-3 (US-31) Interchange in Alabaster to the CR-52 Interchange in Pelham. Length 4.204 mi.

The Bracket Estimate on this project is from $50,675,424 to $61,936,630 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $252.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.ACBR60444-ATRP(005) ,WILCOX COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement and Approaches on CR-30 over Goose Creek west of Lamison. Length 0.170 mi.

The Bracket Estimate on this project is from $391,168 to $478,095 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.ACBRZ60455-ATRP(008) ,MARION COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacements (Grading, Drainage, Base, and Pavement) on CR-9 over Barnesville Creek (Site 1) and on CR-11 over Boardtree Creek (Site 2) west of Hamilton. Length 0.466 mi.

The Bracket Estimate on this project is from $1,619,583 to $1,979,490 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


23.ACBRZ61056-ATRP(017) ,TALLAPOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Partial Bridge Replacement and Approach Improvements on Sportplex Boulevard from a point southeast of the junction of SR-22 in Alexander City. Length 0.129 mi.

The Bracket Estimate on this project is from $359,158 to $438,971 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.ACBRZ62143-ATRP(004) & ACBR62144-ATRP(005) ,LAUDERDALE COUNTY

Contract Time: 160 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacements on CR-92 over First Creek north of Rogersville (Site 1) and on CR-344 over Cowpen Creek (Site 2). Length 0.301 mi.

The Bracket Estimate on this project is from $1,003,532 to $1,226,539 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ACBRZ61377-ATRP(016) ,ETOWAH COUNTY

Contract Time: 45 Working Days

for constructing the Bridge Replacement (Precast) on Coats Bend Circle over an Unnamed Tributary to the Coosa River north of Hokes Bluff. Length 0.007 mi.

The Bracket Estimate on this project is from $213,986 to $261,539 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.ACNU61043-ATRP(011) ,DALLAS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing and Traffic Stripe on CR-85 from the junction of SR-41 to the junction of CR-12. Length 5.986 mi.

The Bracket Estimate on this project is from $986,657 to $1,205,914 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.ACOA56068-ATRP(014) ,COLBERT COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Roadway Widening and Drainage Improvements on Webster Street from the junction of Avalon Avenue to the junction of SR-184 in Muscle Shoals. Length 0.955 mi.

The Bracket Estimate on this project is from $944,863 to $1,154,833 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


34.ACOA59443-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:7.00

for constructing the Roadway Improvements on Hargrove Road from the intersection of 10th Avenue to the junction of Hackberry Lane in Tuscaloosa. Length 0.450 mi.

The Bracket Estimate on this project is from $1,786,747 to $2,183,802 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.BR-0010(505) ,CHOCTAW COUNTY

Contract Time: 235 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement and Culvert Extensions (Grading, Drainage, Base, and Pavement) on SR-10 over Bogue Chitto Creek southeast of Lisman. Length 0.814 mi.

The Bracket Estimate on this project is from $8,106,952 to $9,908,497 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


45.HSIP-0042(526) ,BALDWIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:7.00

for constructing the Offset Left Turn Lanes (Grading, Drainage, Base, and Pavement) and Traffic Signals on SR-42 (US-98) from 1000 feet south of the intersection of Parker Road to 1000 feet north of the intersection of Parker Road in Fairhope. Length 0.258 mi.

The Bracket Estimate on this project is from $546,215 to $667,596 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.RP-IM-I085(358) & HSIP-I085(355) ,MONTGOMERY COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Cable Guiderail Installation, and Traffic Stripe on I-85 from east of the junction of the SR-271 (Taylor Road) Interchange to the Macon County Line. Length 17.378 mi.

The Bracket Estimate on this project is from $3,938,756 to $4,814,035 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.IM-I010(341) ,MOBILE COUNTY

Contract Time: 4/13/2018 Completion Date

for constructing the Load Test Program on I-10 at the Mobile River Bridge in Mobile. Length 8.332 mi.

The Bracket Estimate on this project is from $1,983,792 to $2,314,634 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.NH-0001(599) ,HENRY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:12.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from 0.120 mile north of the junction of CR-18 to 0.170 mile south of the intersection of CR-42 southwest of Abbeville. Length 5.111 mi.

The Bracket Estimate on this project is from $2,226,519 to $2,721,302 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.NH-0006(570) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

for constructing the Steel Encasement Pipe on SR-6 (US-82) at MP 143.100 east of the intersection of SR-3 (US-31) in Prattville.

The Bracket Estimate on this project is from $305,531 to $373,427 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.NH-0008(589) ,RUSSELL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the junction of Woodland Drive in Ladonia to the junction of SR-1 (US-431) in Phenix City. Length 3.248 mi.

The Bracket Estimate on this project is from $1,291,508 to $1,578,510 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.NH-0038(534) ,SHELBY COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:8.00

for constructing the Intersection Improvements (Grading, Drainage, Pavement, and Signals) on SR-38 (US-280) at the Old US-280 (Wal-Mart Entrance) in Hoover. Length 0.111 mi.

The Bracket Estimate on this project is from $820,065 to $1,002,302 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.NH-0074(541) & NH-0067(507) ,BLOUNT COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from the Cullman County Line to east of the intersection of SR-79 in Brooksville (Site 1) and on SR-67 from the junction of SR-53 (US-231) to south of the Cullman County Line (Site 2). Length 8.959 mi.

The Bracket Estimate on this project is from $3,905,361 to $4,773,219 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.NH-HSIP-0021(553) ,TALLADEGA COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-21 from the junction of SR-275 at MP 227.953 to the junction of SR-275 at MP 234.713 in Talladega. Length 6.651 mi.

The Bracket Estimate on this project is from $1,900,335 to $2,322,631 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.NH-0003(609) & STPAA-0003(606) ,SHELBY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-3 (US-31) from north of the junction of CR-68 in Alabaster to the Bishop Creek Bridge in Pelham (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from north of the junction of Fulton Lake Road to the I-65 Overpass in Alabaster (Site 2). Length 5.519 mi.

The Bracket Estimate on this project is from $3,549,433 to $4,338,196 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-0025(551) ,MARENGO AND WILCOX COUNTIES

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-25 from the junction of SR-5 west of Pine Hill to 1.200 miles north of the intersection of CR-32. Length 10.064 mi.

The Bracket Estimate on this project is from $1,497,812 to $1,830,659 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-0056(504) ,WASHINGTON COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-56 from the Mississippi State Line to east of the junction of CR-1 in Chatom. Length 12.953 mi.

The Bracket Estimate on this project is from $1,674,337 to $2,046,411 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-0075(531) ,BLOUNT COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-75 from the junction of C Street North in Oneonta to 0.340 mile north of the junction of CR-39. Length 3.425 mi.

The Bracket Estimate on this project is from $1,409,392 to $1,722,590 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-0101(568) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-101 from the Wheeler Dam (MP 25.750) to the intersection of SR-2 (US-72) west of Rogersville. Length 2.501 mi.

The Bracket Estimate on this project is from $364,033 to $444,929 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPAA-0003(610) & STPAA-0160(503) ,BLOUNT COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the Jefferson County Line to the junction of SR-160 in Smoke Rise (Site 1) and on SR-160 from the I-65 Interchange in Smoke Rise to the junction of Odice Branham Road in Nectar (Site 2). Length 14.649 mi.

The Bracket Estimate on this project is from $3,903,413 to $4,770,838 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPNU-HSIP-0010(542) ,HENRY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:7.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-10 from west of the junction of CR-25 to east of the Vann Mill Creek Bridge in Abbeville. Length 6.094 mi.

The Bracket Estimate on this project is from $1,692,840 to $2,069,027 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPAA-HSIP-0018(509) ,FAYETTE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-18 from the Lamar County Line to west of the junction of SR-107 west of Fayette. Length 4.515 mi.

The Bracket Estimate on this project is from $1,886,512 to $2,305,737 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPAA-HSIP-0021(559) ,WILCOX COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Partial Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-21 from east of the junction of CR-59 east of Snow Hill to 1.100 miles east of the Wolf Creek Bridge. Length 3.990 mi.

The Bracket Estimate on this project is from $753,807 to $921,320 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPNU-HSIP-0021(561) ,MONROE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-21 from junction of SR-47 in Monroeville to south of the junction of CR-30 west of Peterman. Length 3.251 mi.

The Bracket Estimate on this project is from $798,256 to $975,647 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


74.STPAA-HSIP-0094(501) ,MONTGOMERY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-94 from the Ramer Town Limits (MP 6.000) to the junction of SR-53 (US-231) (MP 19.143). Length 13.142 mi.

The Bracket Estimate on this project is from $4,009,404 to $4,900,382 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPAA-HSIP-0141(503) ,COFFEE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:9.00

for constructing the Safety Widening, Resurfacing, Pavement Preservation, and Traffic Stripe on SR-141 from the junction of SR-189 to the Crenshaw County Line. Length 10.832 mi.

The Bracket Estimate on this project is from $2,255,319 to $2,756,501 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPNU-2217(250) ,CULLMAN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on CR-222 from the junction of CR-96 to the intersection of CR-109 northwest of Bremen. Length 5.000 mi.

The Bracket Estimate on this project is from $735,256 to $898,646 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPNU-6717(251) ,WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-25 from the junction of SR-5 in Lynn to the junction of CR-29. Length 6.782 mi.

The Bracket Estimate on this project is from $1,121,296 to $1,370,473 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.99-501-695-000-701 ,ETOWAH AND CHEROKEE COUNTIES

Contract Time: 150 Working Days

for the Maintenance Bridge Painting on SR-25 (US-411) over Big Wills Creek (MP 216.200) and the Coosa River (MP 236.819). Length 0.216 mi.

The Bracket Estimate on this project is from $1,006,984 to $1,230,758 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)