March 30, 2018, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

5. ACAA59454-ATRP(010), JEFFERSON 6. ACAA60160-ATRP(012), MADISON
7. ACOA61359-ATRP(014), LAUDERDALE 10. ACBRZ61312-ATRP(011), MARSHALL
11. ACBRZ61378-ATRP(013), ETOWAH 18. ACOA61159-ATRP(007), BALDWIN
20. BR-0006(559), AUTAUGA 24. ERPR-9010(100), COVINGTON
25. ERPR-9010(134), ESCAMBIA 31. IM-I065(487), ESCAMBIA
32. IM-I065(489), CONECUH 33. IM-I085(341), ETC., MACON
35. NH-0020(527), ETC., COLBERT 36. NH-0001(601), RANDOLPH
38. NH-0013(607), MOBILE *39. NH-0013(608), MOBILE
41. NH-0067(539), CULLMAN 42. NH-0118(515), WALKER
43. NH-0157(522), LAWRENCE 47. NH-HSIP-0074(542), WINSTON
50. RP-IM-I020(348), JEFFERSON 51. RP-NH-0013(568), TUSCALOOSA
55. STPAA-0010(543), WILCOX, ETC. 57. STPAA-0079(516), MARSHALL
58. STPAA-0184(501), COLBERT, ETC. 59. STPAA-0247(504), FRANKLIN
63. STPAA-HSIP-0015(531), CRENSHAW 65. STPAA-HSIP-0033(506), LAWRENCE
66. STPAA-HSIP-0118(513), MARION 68. STPAA-HSIP-0171(514), MARION
69. STPAA-HSIP-0227(505), MARSHALL 72. STPMN-2615(256), ETC., ELMORE
73. STPMN-5117(250), MONTGOMERY 76. STPNU-1817(250), CONECUH
79. STPOA-4117(250), LEE 82. STPOA-HSIP-0111(502), ELMORE
85. 99-504-690-000-501, CALHOUN, ETC.
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


5.ACAA59454-ATRP(010) ,JEFFERSON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Turn Lanes (Grading, Drainage, Pavement, Traffic Signal Installation, and Traffic Stripe) on CR-118 (Fieldstown Road) at CR-1523 (Shady Grove Road) in Gardendale. Length 0.217 mi.

The Bracket Estimate on this project is from $573,832 to $701,351 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACAA60160-ATRP(012) ,MADISON COUNTY

Contract Time: 350 Working Days

DBE Goal Percent:8.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, Bridge Culvert, Traffic Signals, and Traffic Stripe) on CR-11 (Martin Road) from the junction of CR-12 (Old Jim Williams Road) to the intersection of CR-7 (Zierdt Road) in Huntsville. Length 1.220 mi.

The Bracket Estimate on this project is from $9,728,565 to $11,890,469 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $96.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ACOA61359-ATRP(014) ,LAUDERDALE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Roundabout Installation) on Royal Avenue at the intersection of Huntsville Road in Florence. Length 0.083 mi.

The Bracket Estimate on this project is from $1,004,899 to $1,228,209 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACBRZ61312-ATRP(011) ,MARSHALL COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement on CR-322 (Arbor Acres Road) over a tributary to Drum Creek in Albertville. Length 0.004 mi.

The Bracket Estimate on this project is from $126,560 to $154,684 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.ACBRZ61378-ATRP(013) ,ETOWAH COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement and Approaches on CR-8 (Murphree Valley Road) over Locust Fork a tributary of the Warrior River. Length 0.186 mi.

The Bracket Estimate on this project is from $2,116,740 to $2,587,127 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACOA61159-ATRP(007) ,BALDWIN COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Roadway Extension (Grading, Drainage, Pavement, Signals, and Traffic Stripe) on Fern Avenue from the junction of Airport Drive in Foley to the Foley Beach Express. Length 3.365 mi.

The Bracket Estimate on this project is from $3,298,978 to $4,032,084 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $72.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.BR-0006(559) ,AUTAUGA COUNTY

Contract Time: 255 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Culvert Replacement on SR-6 (US-82/Prattville ByPass) over Pine Creek in Prattville. Length 0.564 mi.

The Bracket Estimate on this project is from $6,383,613 to $7,802,194 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $40.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.ERPR-9010(100) ,COVINGTON COUNTY

Contract Time: 35 Working Days

for constructing the Permanent Restoration (Stream Bank Failure Repair) on SR-12 (US-84) at MP 119.800 near the Sepulga River Bridge. Length 0.079 mi.

The Bracket Estimate on this project is from $317,253 to $387,754 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.ERPR-9010(134) ,ESCAMBIA COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Permanent Restoration (Ditch Failure Repair) on SR-3 (US-31) from the junction of Sardis Church Road to east of the junction of CR-2 (Old Atmore Road) west of Flomaton. Length 0.084 mi.

The Bracket Estimate on this project is from $641,270 to $783,774 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.IM-I065(487) ,ESCAMBIA COUNTY

Contract Time: 130 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on I-65 from the Baldwin County Line to the SR-21 Interchange in Atmore. Length 9.722 mi.

The Bracket Estimate on this project is from $5,420,284 to $6,624,791 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.IM-I065(489) ,CONECUH COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from north of the Murder Creek Bridge in Evergreen to the Butler County Line. Length 11.445 mi.

The Bracket Estimate on this project is from $2,873,158 to $3,511,637 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.IM-I085(341) & HSIP-I085(354) ,MACON COUNTY

Contract Time: 220 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Widening (Grading, Drainage, Pavement, Bridge Rail Retrofit) to accommodate Acceleration Lane Extensions on I-85 at SR-229 (Exit 26), SR-81 (Exit 38), and SR-186 (Exit 42) to include the Cable Guiderail Installation from the Montgomery County Line to the Lee County Line. Length 26.823 mi.

The Bracket Estimate on this project is from $5,776,119 to $7,059,701 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $59.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.NH-0020(527) & 99-902-170-020-801 ,COLBERT COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, Weigh-In-Motion Station, and Traffic Stripe on SR-20 (US-72) from east of the junction of SR-13 (US-43) to east of the junction of SR-20/SR-157 southeast of Tuscumbia. Length 4.299 mi.

The Bracket Estimate on this project is from $2,021,604 to $2,470,849 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.NH-0001(601) ,RANDOLPH COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the North City Limits of Roanoke to north of the junction of CR-610. Length 5.804 mi.

The Bracket Estimate on this project is from $1,985,116 to $2,426,253 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-0013(607) ,MOBILE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the Cold Creek Bridge north of LeMoyne to the Cedar Creek Bridge south of Mt Vernon. Length 6.936 mi.

The Bracket Estimate on this project is from $1,557,944 to $1,904,154 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.NH-0013(608) ,MOBILE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the Cedar Creek Bridge south of Mt Vernon to the Washington County Line. Length 5.607 mi.

The Bracket Estimate on this project is from $1,516,659 to $1,853,694 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

WITHDRAWN FROM THE LETTING

Return To: Proposal Letting List (Top of web page)


41.NH-0067(539) ,CULLMAN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-67 from the Blount County Line to the Morgan County Line. Length 6.910 mi.

The Bracket Estimate on this project is from $1,079,589 to $1,319,497 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.NH-0118(515) ,WALKER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-118 from east of the intersection of Gamble Road to the junction of SR-69 in Jasper. Length 1.685 mi.

The Bracket Estimate on this project is from $1,813,294 to $2,216,249 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.NH-0157(522) ,LAWRENCE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-157 from south of the junction of SR-33 in Moulton to the junction of CR-505/506. Length 4.450 mi.

The Bracket Estimate on this project is from $1,705,303 to $2,084,259 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-HSIP-0074(542) ,WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, Safety Scoring, and Traffic Stripe on SR-74 (US-278) from the junction of Chilcoat Road to just east of the junction of CR-3089 in Double Springs. Length 3.219 mi.

The Bracket Estimate on this project is from $1,153,144 to $1,409,398 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.RP-IM-I020(348) ,JEFFERSON COUNTY

Contract Time: 90 Working Days

for constructing the Traffic Sign Rehabilitation on I-20 from MP 132.890 to MP 142.920 and on I-459 from MP 28.500 to MP 30.150. Length 10.030 mi.

The Bracket Estimate on this project is from $1,170,185 to $1,430,226 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $27.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.RP-NH-0013(568) ,TUSCALOOSA COUNTY

Contract Time: 9/15/2019 Completion Date

DBE Goal Percent:5.00

for constructing the Resurfacing and Pavement Rehabilitation (Grading, Drainage, Pavement, Lighting, Retaining Wall, and Signalization) on SR-13 (US-43) from the north end of the I-359 Bridge to the Hugh Thomas Bridge in Tuscaloosa. Length 0.682 mi.

The Bracket Estimate on this project is from $16,214,050 to $19,817,173 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $157.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Monday, March 19, 2018, at the Alabama Department of Transportation; West Central Region Training Center; 2015 McFarland Blvd East; Tuscaloosa, AL 35404 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-0010(543) ,WILCOX AND MARENGO COUNTIES

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-10 from the intersection of SR-25 in Vineland to the intersection of SR-5 in Pine Hill. Length 5.553 mi.

The Bracket Estimate on this project is from $1,122,764 to $1,372,267 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-0079(516) ,MARSHALL COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-79 from the Blount County Line to south of the junction of Willow Beach Road in Guntersville. Length 10.050 mi.

The Bracket Estimate on this project is from $2,443,705 to $2,986,751 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-0184(501) ,COLBERT AND LAWRENCE COUNTIES

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-184 from the junction of Hatton School Road in Hatton to the junction of SR-101. Length 4.442 mi.

The Bracket Estimate on this project is from $601,972 to $735,744 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-0247(504) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-247 from the junction of SR-24 to MP 5.000. Length 4.961 mi.

The Bracket Estimate on this project is from $595,201 to $727,468 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPAA-HSIP-0015(531) ,CRENSHAW COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:10.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-15 (US-29) from the Covington County Line to the curb section (MP 71.780) near the South Town Limits of Brantley. Length 11.104 mi.

The Bracket Estimate on this project is from $2,433,940 to $2,974,816 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-HSIP-0033(506) ,LAWRENCE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-33 from south of the junction of CR-249 to the junction of SR-20 in Courtland. Length 4.109 mi.

The Bracket Estimate on this project is from $734,202 to $897,358 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-HSIP-0118(513) ,MARION COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing (Scrub Seal), Safety Scoring, and Traffic Stripe on SR-118 from the Lamar County Line to the junction of SR-171 in Guin. Length 2.559 mi.

The Bracket Estimate on this project is from $1,182,940 to $1,445,816 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-HSIP-0171(514) ,MARION COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Guardrail Installation, Safety Scoring, and Traffic Stripe on SR-171 from the junction of SR-118 to south of the junction of Philadelphia Road in Guin. Length 3.859 mi.

The Bracket Estimate on this project is from $1,777,754 to $2,172,810 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-HSIP-0227(505) ,MARSHALL COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), and Traffic Stripe on SR-227 from the junction of SR-62 to the junction of CR-455 in Guntersville. Length 10.320 mi.

The Bracket Estimate on this project is from $3,334,579 to $4,075,596 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPMN-2615(256) & STPMN-2615(257) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Temporary Traffic Stripe on Coosa River Road from the junction of SR-143 to the intersection of Lightwood Road (Site 1) and on Coosa/Rucker Road from the junction of Blackwell Drive to south of the junction of Lucky Town Road (Site 2). Length 8.326 mi.

The Bracket Estimate on this project is from $284,087 to $347,217 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPMN-5117(250) ,MONTGOMERY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-2 (Macon County Road) from the junction of SR-110 (Vaughn Road) to the Macon County Line (Site 1) and on CR-37 (Flowers Road) from the Bullock County Line to the junction of SR-110 (Site 2). Length 7.687 mi.

The Bracket Estimate on this project is from $1,240,151 to $1,515,740 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPNU-1817(250) ,CONECUH COUNTY

Contract Time: 30 Working Days

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-26 from the junction of CR-22 to the junction of SR-3 (US-31) northeast of Evergreen. Length 7.248 mi.

The Bracket Estimate on this project is from $616,988 to $754,097 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPOA-4117(250) ,LEE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-054 from the intersection of CR-146 (Moores Mill Road) to the intersection of Gateway Drive in Opelika. Length 3.127 mi.

The Bracket Estimate on this project is from $556,643 to $680,341 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


82.STPOA-HSIP-0111(502) ,ELMORE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-111 from the intersection of SR-14 in Wetumpka to the junction of Hogan Road in Holtville. Length 9.389 mi.

The Bracket Estimate on this project is from $2,711,736 to $3,314,344 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


85.99-504-690-000-501 ,CALHOUN, CLAY, TALLADEGA, AND CHAMBERS COUNTIES

Contract Time: 110 Working Days

for the Maintenance Bridge Painting on various routes over Norfolk Southern and CSX Railroads at various locations as indicated in the plans.

The Bracket Estimate on this project is from $815,800 to $997,089 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.