Office Engineer

Proposal Letting List
April 27, 2018, Transportation Letting

Welcome to the Proposal Letting List Page. We now include the approximate items of work with each proposal. Please e-mail us with your comments.

5. ACBRZ60455-ATRP(008), MARION 6. ACBRZ60916-ATRP (007), LAMAR
14. BR-0008(509), RUSSELL 15. BR-0069(500), CLARKE
18. CMAQ-0079(515), JEFFERSON 21. ERPR-9010(982), BARBOUR
24. HSIP-I010(340), ETC., BALDWIN, ETC. 26. IM-I020(354), ETC., ST. CLAIR
27. IM-I022(306), WALKER 29. NH-0013(608), MOBILE
30. NH-0016(523), MOBILE 32. NH-0021(563), ETC., CALHOUN
36. NH-HSIP-0005(553), BIBB 40. STPNU-0048(505), ETC., CLAY, ETC.
42. STPAA-0075(534), DEKALB 43. STPAA-0143(503), ELMORE, ETC.
48. STPAA-HSIP-0017(573), LAMAR 50. STPAA-HSIP-0022(527), CHILTON
52. STPAA-HSIP-0086(500), PICKENS 53. STPAA-HSIP-0118(514), WALKER
54. STPAA-HSIP-0143(504), CHILTON 55. STPAA-HSIP-0239(504), BULLOCK
58. STPNU-1717(250), COLBERT 59. STPNU-3117(250), GENEVA
62. STPOA-1715(252), COLBERT 65. ST-014-077-002, ETC., CLAY
66. ST-028-077-006, ETOWAH 68. 99-509-022-182-800, BALDWIN
*69. 99-509-491-665-703, MOBILE 200. STPAA-NR13(902), BULLOCK, ETC.
201. STPAA-NR13(952), MORGAN, ETC.
*-WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


5.ACBR60455-ATRP(008) ,MARION COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on CR-11 over Boardtree Creek west of Hamilton. Length 0.126 mi.

The Bracket Estimate on this project is from $842,637 to $1,029,889 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.ACBRZ60916-ATRP (007) ,LAMAR COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement on CR-541 (Springs Creek Road) over Pine Springs Creek northwest of Sulligent. Length 0.154 mi.

The Bracket Estimate on this project is from $628,786 to $768,516 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.BR-0008(509) ,RUSSELL COUNTY

Contract Time: 270 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-8 (US-80) over Little Uchee Creek west of Ladonia. Length 0.907 mi.

The Bracket Estimate on this project is from $7,123,446 to $8,706,434 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $40.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.BR-0069(500) ,CLARKE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Culvert) on SR-69 over Kanetuche Creek north of Salitpa. Length 0.530 mi.

The Bracket Estimate on this project is from $3,068,833 to $3,750,796 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.CMAQ-0079(515) ,JEFFERSON COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:1.00

for constructing the Traffic Signal Improvements and Traffic Stripe on SR-79 from the junction of CR-124 (Pine Hill Road) to the junction of SR-151 (Narrows Road) in Pinson. Length 8.430 mi.

The Bracket Estimate on this project is from $2,717,620 to $3,321,535 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.ERPR-9010(982) ,BARBOUR COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Permanent Restoration (Landslide Correction and Soil Nail Wall Installation) at the junction of SR-30 and SR-198 in Clayton.

The Bracket Estimate on this project is from $719,920 to $879,903 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.HSIP-I010(340) & HSIP-I065(485) ,BALDWIN AND CONECUH COUNTIES

Contract Time: 180 Working Days

for constructing the Median Barrier Protection (Cable Guiderail Installation) on I-10 from the SR-181 Interchange in Daphne to the Perdido River Bridge and on I-65 from MP 75.500 to MP 105.500. Length 55.994 mi.

The Bracket Estimate on this project is from $2,360,529 to $2,885,091 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.IM-I020(354) & IM-I020(355) ,ST. CLAIR COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-20 from west of the SR-4 (US-78) Interchange to the Talladega County Line. Length 8.54 mi.

The Bracket Estimate on this project is from $3,667,117 to $4,482,032 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.IM-I022(306) ,WALKER COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on I-22 from east of the Exit 46 Interchange in Carbon Hill to the Exit 52 Interchange. Length 4.633 mi.

The Bracket Estimate on this project is from $3,857,072 to $4,714,199 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-0013(608) ,MOBILE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the Cedar Creek Bridge south of Mt Vernon to the Washington County Line. Length 5.607 mi.

The Bracket Estimate on this project is from $1,785,404 to $2,182,160 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-0016(523) ,MOBILE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Sidewalk, Curb & Gutter Installation, and Traffic Stripe on SR-16 (US-90) at the Illinois Central Railroad Crossing (MP 31.246) west of the I-165 Interchange to MP 34.207. Length 2.840 mi.

The Bracket Estimate on this project is from $1,665,560 to $2,035,684 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.NH-0021(563), NH-HSIP-0200(501) & STPAA-0021(564) ,CALHOUN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from north of the junction of Pine Island Road to north of the junction of Maxwellborn Road (Site 1); on SR-21 from the junction of SR-200 to the junction of SR-9 in Piedmont (Site 2); and to include the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-200 from the junction of SR-21 to the junction of SR-74 (US-278) in Piedmont (Site 3). Length 5.710 mi.

The Bracket Estimate on this project is from $2,447,271 to $2,991,109 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.NH-HSIP-0005(553) ,BIBB COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-5 from the junction of SR-219 to the South City Limits of West Blocton. Length 5.215 mi.

The Bracket Estimate on this project is from $2,195,166 to $2,682,981 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPNU-0048(505) & STPAA-0048(506) ,CLAY AND RANDOLPH COUNTIES

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-48 from the junction of SR-9 in Lineville to the Randolph County Line (Site 1) and on SR-48 from west of the junction of CR-235 to the junction of CR-1 in Wedowee (Site 2). Length 8.876 mi.

The Bracket Estimate on this project is from $1,266,276 to $1,574,671 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-0075(534) ,DEKALB COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-75 from the Marshall County Line to south of the junction of CR-326. Length 12.659 mi.

The Bracket Estimate on this project is from $2,456,410 to $3,002,279 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-0143(503) ,ELMORE AND AUTAUGA COUNTIES

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-143 from the junction of SR-14 in Elmore to the Chilton County Line. Length 16.499 mi.

The Bracket Estimate on this project is from $2,377,844 to $2,906,254 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-HSIP-0017(573) ,LAMAR COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Rail Retrofit, and Traffic Stripe on SR-17 from a point north of the BNSF Railroad (MP 254.108) in Sulligent to just north of the junction of Mormon Hollow Road. Length 6.371 mi.

The Bracket Estimate on this project is from $3,074,958 to $3,758,282 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-HSIP-0022(527) ,CHILTON COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-22 from the junction of SR-3 (US-31) west of Verbena to the Coosa River Bridge. Length 6.112 mi.

The Bracket Estimate on this project is from $2,388,517 to $2,919,298 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-HSIP-0086(500) ,PICKENS COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, and Traffic Stripe on SR-86 from the junction of SR-17 in Carrollton to west of the junction of Allman Road. Length 6.439 mi.

The Bracket Estimate on this project is from $3,122,113 to $3,815,915 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-HSIP-0118(514) ,WALKER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Safety Scoring, and Traffic Stripe on SR-118 from the junction of Ripley Loop east of Carbon Hill to east of the junction of Saragossa Road. Length 3.166 mi.

The Bracket Estimate on this project is from $2,467,601 to $3,015,957 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0143(504) ,CHILTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-143 from the Autauga County Line to the junction of SR-3 (US-31). Length 0.727 mi.

The Bracket Estimate on this project is from $443,358 to $541,882 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0239(504) ,BULLOCK COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-239 from the Barbour County Line to the junction of SR-15 (US-29). Length 10.650 mi.

The Bracket Estimate on this project is from $3,479,005 to $4,252,117 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPNU-1717(250) ,COLBERT COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-1 from the junction of SR-2 (US-72) to the Colbert County Rose Trail Park. Length 9.432 mi.

The Bracket Estimate on this project is from $1,014,225 to $1,239,609 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPNU-3117(250) ,GENEVA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on CR-49 from the intersection of SR-103 to the intersection of CR-60 southeast of Slocomb. Length 2.443 mi.

The Bracket Estimate on this project is from $426,319 to $521,056 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPOA-1715(252) ,COLBERT COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Pepi Avenue/Markate Avenue from the junction of SR-184 (2nd Street) to the junction of River Road (Site 1); on Alabama Avenue from the junction of 6th Street to the junction of Avalon Avenue (Site 2); on Sheffield Avenue from the junction of 6th Street to the junction of Avalon Avenue (Site 3); on Covenant Drive/John Aldridge Drive from the junction of SR-2 (US-43) to the junction of 6th Street (Site 4); and on Elledge Street from the junction of King Street to the junction of 6th Street (Site 5) in Muscle Shoals. Length 4.977 mi.

The Bracket Estimate on this project is from $711,764 to $869,934 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.ST-014-077-002 & IAR-014-000-003 ,CLAY COUNTY

Contract Time: 180 Working Days

for constructing the Realignment (Grading, Drainage, Pavement, and Lighting) of SR-77 from the junction of CR-35 to the junction of CR-31 in Ashland. Length 1.170 mi.

The Bracket Estimate on this project is from $4,998,256 to $6,108,979 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $35.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.ST-028-077-006 ,ETOWAH COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing, Guardrail Installation, Intersection Modifications, and Traffic Stripe on SR-77 from south of the junction of Pinedale Drive to Kid's Way Road in Rainbow City. Length 1.500 mi.

The Bracket Estimate on this project is from $593,974 to $725,968 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.99-509-022-182-800 ,BALDWIN COUNTY

Contract Time: 365 Calendar Days

for the Maintenance Dredging of Little Lagoon Pass in Gulf Shores as indicated in the plans.

The Bracket Estimate on this project is from $1,078,113 to $1,317,693 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.99-509-491-665-703 ,MOBILE COUNTY

Contract Time: 20 Working Days

for constructing the Bridge Deck Replacement (Partial) on Airport Boulevard over I-65 in Mobile. Length 0.052 mi.

The Bracket Estimate on this project is from $2,350,712 to $2,873,092 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

**** WITHDRAWN FROM THE LETTING ****

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(902) ,BULLOCK AND MACON COUNTIES

Contract Time: 140 Working Days

for constructing the Curb Ramp Installations and Improvements on various routes at various locations as indicated in the plans.

The Bracket Estimate on this project is from $267,676 to $327,160 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)


201.STPAA-NR13(952) ,MORGAN AND LIMESTONE COUNTIES

Contract Time: 90 Working Days

for constructing the Curb Ramp Installations and Modifications on SR-20, SR-36, and SR-3 (US-31) in Morgan County and on SR-53 in Limestone County.

The Bracket Estimate on this project is from $121,368 to $148,339 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)