June 29, 2018, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

6. ACBR61380-ATRP(014), ETOWAH 9. ACBRZ59382-ATRP(010), DEKALB
11. ACBRZ63647-ATRP(004), CALHOUN 15. ACNU61044-ATRP(008), DALLAS
18. STPHV-ACAA62037-ATRP(016), MADISON 34. NH-HSIP-0002(569), MADISON
35. NH-0005(554), JEFFERSON 36. NH-0074(543), ETOWAH
37. NH-0077(521), ETOWAH 40. STPAA-0007(548), ETOWAH
41. STPAA-0008(591), MACON 42. NH-HSIP-0210(507), ETC., HOUSTON
43. STPAA-0066(503), DALLAS 44. STPAA-0069(554), TUSCALOOSA
45. STPAA-0027(515), ETC., DALE 46. STPAA-2618(250), ELMORE
47. STPAA-5817(250), ST. CLAIR 49. STPAA-0099(506), ETC., LIMESTONE
50. STPAA-HSIP-0014(544), ELMORE 52. STPAA-HSIP-0018(511), FAYETTE
53. STPAA-HSIP-0021(560), LOWNDES 59. STPMN-2615(258), ETC., ELMORE
62. STPNU-1417(250), CLAY 63. STPNU-2717(250), ESCAMBIA
64. STPNU-3418(250), HENRY 65. STPNU-3617(250), JACKSON
66. STPNU-4614(256), MARENGO 69. STPOA-4117(251), LEE
70. STPOA-4217(250), LIMESTONE 74. 99-402-690-000-802, LIMESTONE
77. 99-508-006-201-805, CHOCTAW, ETC.

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


6.ACBR61380-ATRP(014) ,ETOWAH COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches on CR-71 (Centre Road) over Dry Creek northeast of Hokes Bluff. Length 0.151 mi.

The Bracket Estimate on this project is from $1,045,965 to $1,278,401 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



9.ACBRZ59382-ATRP(010) ,DEKALB COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement and Approaches on CR-91 (Chavies Road) over Town Creek in Rainsville. Length 0.162 mi.

The Bracket Estimate on this project is from $1,770,039 to $2,163,381 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



11.ACBRZ63647-ATRP(004) ,CALHOUN COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on Rock Springs Road over an Unnamed Tributary to Ohatchee Creek. Length 0.312 mi.

The Bracket Estimate on this project is from $995,010 to $1,216,123 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



15.ACNU61044-ATRP(008) ,DALLAS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-7 from the intersection of SR-8 (US-80) to the intersection of CR-62 southeast of Sardis (Site 1) and on CR-7 from the intersection of CR-12 to the Lowndes County Line (Site 2). Length 6.274 mi.

The Bracket Estimate on this project is from $911,245 to $1,113,744 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



18.STPHV-ACAA62037-ATRP(016) ,MADISON COUNTY

Contract Time: 425 Working Days

DBE Goal Percent:11.00

for constructing the Southbound Lanes and Greenway (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on CR-7 (Zierdt Road) from south of the intersection of CR-11 (Martin Road) to the junction of Madison Boulevard to include the Intersection Improvements at Martin Road and Madison Boulevard. Length 3.569 mi.

The Bracket Estimate on this project is from $18,014,475 to $22,017,692 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $188.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



34.NH-HSIP-0002(569) ,MADISON COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing, Safety Improvements for Access Management, and Intersection Modifications on SR-2 (US-72/University Drive) from east of the junction of Perimeter Parkway to the junction of SR-1 (US-231/US-431/Memorial Parkway) in Huntsville. Length 3.986 mi.

The Bracket Estimate on this project is from $3,409,404 to $4,167,049 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



35.NH-0005(554) ,JEFFERSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-5 (US-78) from west of the junction of CR-105 (Cherry Avenue) in Birmingham to west of the intersection of CR-88 (Heflin Avenue) in Forestdale. Length 2.489 mi.

The Bracket Estimate on this project is from $1,909,318 to $2,333,610 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



36.NH-0074(543) ,ETOWAH COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from the Blount County Line to the junction of SR-1 (US-431) northwest of Attalla. Length 13.090 mi.

The Bracket Estimate on this project is from $2,187,603 to $2,673,737 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



37.NH-0077(521) ,ETOWAH COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-77 from the I-59 Interchange in Attalla to the junction of SR-1 (US-431). Length 4.871 mi.

The Bracket Estimate on this project is from $1,731,352 to $2,116,096 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



40.STPAA-0007(548) ,ETOWAH COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the St. Clair County Line to the junction of SR-1 (US-431) in Attalla. Length 6.039 mi.

The Bracket Estimate on this project is from $1,095,403 to $1,338,825 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



41.STPAA-0008(591) ,MACON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from 0.070 mile west of the junction of Gomillion Avenue to the junction of Frazier Street in Tuskegee. Length 3.512 mi.

The Bracket Estimate on this project is from $1,158,976 to $1,416,527 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



42.NH-HSIP-0210(507) & STPAA-0052(515) ,HOUSTON COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-210 (Ross Clark Circle) from the junction of SR-1 (US-231) South to the intersection of Fortner Street in Dothan (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-52 (Hartford Highway/Woodland Drive) from the intersection of SR-210 to the junction of SR-12 (West Main Street) in Dothan (Site 2). Length 3.691 mi.

The Bracket Estimate on this project is from $1,864,117 to $2,278,365 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



43.STPAA-0066(503) ,DALLAS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-66 from the Marengo County Line to the junction of SR-5 southwest of Safford. Length 4.958 mi.

The Bracket Estimate on this project is from $1,927,885 to $2,356,304 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



44.STPAA-0069(554) ,TUSCALOOSA COUNTY

Contract Time: 170 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-69 from the Hale County Line to the intersection of Old Greensboro Road south of Tuscaloosa. Length 7.537 mi.

The Bracket Estimate on this project is from $7,117,780 to $8,699,509 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



45.STPAA-0027(515), STPAA-0123(509) & STPAA-0249(502) ,DALE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-27 from the junction of SR-53 (US-231) to west of the junction of Old Euwell Road in Ozark (Site 1); on SR-123 from the junction of SR-53 (US-231) to the junction of Roy Parker Road in Ozark (Site 2); and on SR-249 from the junction of SR-53 (US-231) to the junction of SR-27 in Ozark (Site 3). Length 6.956 mi.

The Bracket Estimate on this project is from $1,907,523 to $2,331,416 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $28.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



46.STPAA-2618(250) ,ELMORE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing (Micro-Surfacing) and Traffic Stripe on Hogan Road from the junction of SR-143 to the junction of SR-111 in Holtville. Length 4.279 mi.

The Bracket Estimate on this project is from $353,075 to $431,536 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



47.STPAA-5817(250) ,ST. CLAIR COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-10 from the Jefferson County Line to the junction of Lambert Circle in Moody. Length 4.023 mi.

The Bracket Estimate on this project is from $1,236,529 to $1,511,313 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



49.STPAA-0099(506) & STPAA-0099(505) ,LIMESTONE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:12.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on SR-99 from the Sheriff's Arena (MP 9.000) to the Lauderdale County Line. Length 16.749 mi.

The Bracket Estimate on this project is from $1,436,030 to $1,755,148 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



50.STPAA-HSIP-0014(544) ,ELMORE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-14 from east of the intersection of SR-9 (US-231) in Wetumpka to the junction of SR-63. Length 7.464 mi.

The Bracket Estimate on this project is from $2,863,957 to $3,500,392 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



52.STPAA-HSIP-0018(511) ,FAYETTE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Safety Scoring, and Traffic Stripe on SR-18 from west of the junction of CR-21 to east of the intersection of SR-171 (US-43) in Fayette. Length 4.117 mi.

The Bracket Estimate on this project is from $1,049,061 to $1,282,186 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



53.STPAA-HSIP-0021(560) ,LOWNDES COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-21 from the Big Swamp Creek Bridge southwest of Hayneville to the junction of SR-8 (US-80). Length 8.613 mi.

The Bracket Estimate on this project is from $2,960,772 to $3,618,721 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



59.STPMN-2615(258), STPMN-2615(259) & STPMN-2615(260) ,ELMORE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on Kennedy Avenue from the junction of Coosada Road to the junction of Airport Road northeast of Millbrook (Site 1); on Coosa River Road from the junction of SR-143 to the intersection of Lightwood Road northeast of Deatsville (Site 2); and on Coosada/Rucker Road from the junction of Blackwell Drive to south of the junction of Lucky Town Road in Elmore (Site 3). Length 9.504 mi.

The Bracket Estimate on this project is from $559,503 to $683,837 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



62.STPNU-1417(250) ,CLAY COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-7 from the Coosa County Line to the intersection of SR-148. Length 6.692 mi.

The Bracket Estimate on this project is from $841,015 to $1,027,907 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



63.STPNU-2717(250) ,ESCAMBIA COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 (Butler Street) from the junction of CR-27 (Robinsonville Road) to the Monroe County Line (Site 1); on CR-27 (Robinsonville Road/Sardine Road) from the junction of CR-45 (Butler Street) to the junction of CR-18 (Foshee Road) (Site 2); and on CR-18 (Foshee Road) from the junction of CR-27 (Sardine Road) to the intersection of SR-118 (Site 3). Length 17.224 mi.

The Bracket Estimate on this project is from $1,902,730 to $2,325,559 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



64.STPNU-3418(250) ,HENRY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Triple Layer Bituminous Surface Treatment) and Traffic Stripe on CR-12 from the junction of SR-173 to the junction of CR-53 northeast of Headland. Length 9.436 mi.

The Bracket Estimate on this project is from $420,923 to $514,462 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



65.STPNU-3617(250) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-42 from the junction of SR-2 (US-72) to the junction of CR-45 in Fackler. Length 1.700 mi.

The Bracket Estimate on this project is from $329,766 to $403,047 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



66.STPNU-4614(256) ,MARENGO COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-44 from a point 1.900 miles east of the junction of SR-28 to the junction of SR-13 (US-43) in Providence (Site 1) and on CR-44 from the junction of SR-13 (US-43) in Providence to the junction of SR-25 in Dayton (Site 2). Length 10.788 mi.

The Bracket Estimate on this project is from $1,530,633 to $1,870,774 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



69.STPOA-4117(251) ,LEE COUNTY

Contract Time: 45 Working Days

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-095 from the junction of SR-147 to the Opelika City Limits. Length 2.807 mi.

The Bracket Estimate on this project is from $541,436 to $661,755 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



70.STPOA-4217(250) ,LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing, Guardrail Installation, and Traffic Stripe on Harvest Road from the junction of SR-251 to the junction of Love Branch Road. Length 4.377 mi.

The Bracket Estimate on this project is from $786,577 to $961,371 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



74.99-402-690-000-802 ,LIMESTONE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on the I-565 Service Roads from the Mooresville Road Interchange to the Beaverdam Creek Bridge. Length 3.256 mi.

The Bracket Estimate on this project is from $360,370 to $440,452 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



77.99-508-006-201-805 ,CHOCTAW AND CLARKE COUNTIES

Contract Time: 30 Working Days

for the Maintenance Bridge Repair on SR-12 (US-84) over the Tombigbee River. Length 0.244 mi.

The Bracket Estimate on this project is from $268,543 to $328,220 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items