Office Engineer

Proposal Letting List
December 07, 2018, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. BRF-0167(508), COFFEE 3. ERPRF-9010(955), LIMESTONE
5. HSIP-I020(346), TALLADEGA 10. ACAA61457-ATRP(012), MADISON
14. ACBRZ60342-ATRP(011), ETC., HALE 15. ACBRZ60553-ATRP(012), LAWRENCE
16. ACBRZ61070-ATRP(008), HOUSTON 17. ACBRZ61135-ATRP(015), LEE
18. ACBRZ62146-ATRP(013), LAUDERDALE 22. BR-0145(504), CHILTON, ETC.
25. BRZ-0517(250), BLOUNT 28. ERPR-9010(140), CRENSHAW
35. HSIP-0003(614), BALDWIN 36. HSIP-0008(590), DALLAS
38. HSIP-NR17(934), WALKER, ETC. 41. IM-HSIP-I065(484), JEFFERSON, ETC.
45. IM-I085(357), MONTGOMERY 46. IM-I085(361), LEE
*49. NH-0001(602), MADISON 50. NH-0002(581), JACKSON
51. NH-0012(565), MONROE 52. NH-0012(566), HOUSTON
53. NH-0013(605), WASHINGTON 54. NH-0020(528), MORGAN
55. NH-0021(565), MONTGOMERY 56. NH-0113(502), ESCAMBIA
57. NH-0157(525), COLBERT 60. STPAA-0017(575), LAUDERDALE
61. STPOA-0036(511), MORGAN 62. STPAA-0069(556), CLARKE
63. STPAA-0163(503), MOBILE 64. STPAA-0248(501), ETC., COFFEE
65. STPAA-5117(252), MONTGOMERY 68. STPAA-HSIP-0007(547), ST. CLAIR
69. STPAA-HSIP-0032(500), PICKENS 70. STPAA-HSIP-0123(511), DALE
76. STPNU-0718(250), BUTLER 78. STPNU-3317(250), HALE
79. STPNU-3618(250), JACKSON 80. STPNU-4614(257), MARENGO
81. STPNU-5018(250), MONROE 82. STPNU-5416(252), PICKENS
83. STPNU-6218(250), TALLAPOOSA 84. STPNU-6615(254), WILCOX
85. STPNU-6618(251), WILCOX 88. STPOA-2818(250), ETOWAH
89. STPOA-8121(601), ETOWAH 92. 99-509-490-188-602, ETC., MOBILE
**93. 99-609-495-042-802, MOBILE 200. STPAA-NR13(957), MONROE, ETC.
* - WITHDRAWN FROM THE LETTING
** - ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BRF-0167(508) ,COFFEE COUNTY

Contract Time: 290 Working Days

DBE Goal Percent:7.00

for constructing the New Alignment and Bridge Replacement to include the Relief Bridges on SR-167 over the Pea River. Length 1.183 mi.

The Bracket Estimate on this project is from $9,344,248 to $11,420,748 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $51.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.ERPRF-9010(955) ,LIMESTONE COUNTY

Contract Time: 125 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement and Approaches on CR-12 (Old Highway 20) over a slough of Limestone Creek northeast of Belle Mina. Length 0.284 mi.

The Bracket Estimate on this project is from $2,099,017 to $2,565,465 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.HSIP-I020(346) ,TALLADEGA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Median Barrier Protection (Cable Guiderail Installation) on I-20 from the St. Clair County Line to 0.300 mile west of the overpass of Mahaffey Road in Eastaboga. Length 13.296 mi.

The Bracket Estimate on this project is from $820,659 to $1,003,027 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.ACAA61457-ATRP(012) ,MADISON COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:10.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on CR-93 (Winchester Road) from the junction of CR-406 (Naugher Road) to the junction of CR-389 (Riverton Road) northeast of Huntsville. Length 0.984 mi.

The Bracket Estimate on this project is from $6,856,528 to $8,380,200 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $43.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.ACBRZ60342-ATRP(011) & ACBRZ60346-ATRP(011) ,HALE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-103 (Erie Road) over a tributary to Wright's Creek and Baptizing Branch southwest of Sawyerville. Length 0.123 mi.

The Bracket Estimate on this project is from $486,210 to $594,257 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.ACBRZ60553-ATRP(012) ,LAWRENCE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-187 over West Flint Creek southwest of Oakville. Length 0.215 mi.

The Bracket Estimate on this project is from $1,157,932 to $1,415,250 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.ACBRZ61070-ATRP(008) ,HOUSTON COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on Brookside Drive over Quail Creek in Dothan. Length 0.115 mi.

The Bracket Estimate on this project is from $667,975 to $816,414 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.ACBRZ61135-ATRP(015) ,LEE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement on CR-249 over Soap Creek. Length 0.016 mi.

The Bracket Estimate on this project is from $958,249 to $1,171,193 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.ACBRZ62146-ATRP(013) ,LAUDERDALE COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:7.00

for constructing the Bridge Replacement on CR-76 over Second Creek south of Lexington. Length 0.261 mi.

The Bracket Estimate on this project is from $1,331,625 to $1,627,541 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.BR-0145(504) ,CHILTON AND SHELBY COUNTIES

Contract Time: 230 Working Days

DBE Goal Percent:10.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on SR-145 over Waxahatchee Creek. Length 0.672 mi.

The Bracket Estimate on this project is from $5,855,491 to $7,156,711 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.BRZ-0517(250) ,BLOUNT COUNTY

Contract Time: 35 Working Days

for constructing the Bridge Replacement on Larue Circle over Honey Branch west of Susan Moore. Length 0.003 mi.

The Bracket Estimate on this project is from $127,028 to $155,257 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.ERPR-9010(140) ,CRENSHAW COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:9.00

for constructing the Roadway and Drainage Structure Repairs on SR-9 (US-331) from south of the junction of SR-141 to south of the junction of SR-189. Length 0.965 mi.

The Bracket Estimate on this project is from $1,223,367 to $1,495,227 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.HSIP-0003(614) ,BALDWIN COUNTY

Contract Time: 30 Working Days

for constructing the Intersection Modifications to include Turn Lane Improvements on SR-3 (US-31) at the junction of SR-225 in Spanish Fort. Length 0.121 mi.

The Bracket Estimate on this project is from $159,588 to $195,052 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.HSIP-0008(590) ,DALLAS COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:3.00

for constructing the Traffic Signal Improvements (Drainage, Traffic Signals, and Traffic Stripe) on SR-8 (US-80) from the intersection of SR-219 (Landline Road) to the junction of SR-41 in Selma. Length 4.374 mi.

The Bracket Estimate on this project is from $1,341,417 to $1,639,509 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.HSIP-NR17(934) ,WALKER, SUMTER, TUSCALOOSA, GREENE, LAMAR, PERRY, PICKENS, CHILTON, MARION, AND WINSTON COUNTIES

Contract Time: 75 Working Days

for constructing the Road Safety Assessment Sites (Scoring, Traffic Stripe, Pavement Markings, and Pavement Markers) at various locations in the West Central Region as indicated in the plans.

The Bracket Estimate on this project is from $486,538 to $594,657 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.IM-HSIP-I065(484) ,JEFFERSON AND BLOUNT COUNTIES

Contract Time: 230 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Guardrail Improvements, and Traffic Stripe on I-65 from the Mount Olive Interchange to 0.780 mile north of the SR-160 Interchange. Length 13.399 mi.

The Bracket Estimate on this project is from $15,849,454 to $19,371,555 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.IM-I085(357) ,MONTGOMERY COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:2.00

for constructing the Pavement Rehabilitation, Planing, Resurfacing, and Traffic Stripe on I-85 from the I-65 Interchange to north of the Hall Street Overpass in Montgomery. Length 1.842 mi.

The Bracket Estimate on this project is from $1,905,896 to $2,329,428 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.IM-I085(361) ,LEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-85 from 1.340 miles south of the Andrews Road Interchange (Exit 66) in Opelika to the Chambers County Line. Length 3.774 mi.

The Bracket Estimate on this project is from $1,223,091 to $1,494,889 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.NH-0001(602) ,MADISON COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of Old Big Cove Road to the intersection of Bassett Street in Huntsville. Length 4.880 mi.

The Bracket Estimate on this project is from $1,497,407 to $1,830,164 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


50.NH-0002(581) ,JACKSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-2 (US-72) from 0.265 mile east of the junction of Parnell Circle east of Woodville to 0.110 mile west of the junction of CR-110. Length 4.000 mi.

The Bracket Estimate on this project is from $1,572,519 to $1,921,968 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.NH-0012(565) ,MONROE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-12 (US-84) from east of the intersection of SR-136 (MP 76.686) to the Conecuh County Line. Length 5.329 mi.

The Bracket Estimate on this project is from $1,145,262 to $1,399,765 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.NH-0012(566) ,HOUSTON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-12 (US-84) from west of the intersection of South Broad Street in Cowarts to west of the junction of Thompson Road northwest of Pansey. Length 7.139 mi.

The Bracket Estimate on this project is from $3,855,534 to $4,712,320 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.NH-0013(605) ,WASHINGTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe (Running Lanes Only) on SR-13 (US-43) from 0.340 mile north of the Lewis Creek Bridge to 0.100 mile south of the junction of Tarver Road south of Wagarville. Length 5.086 mi.

The Bracket Estimate on this project is from $1,521,479 to $1,859,585 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.NH-0020(528) ,MORGAN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 from the junction of State Docks Road to the junction of 12th Avenue Northwest to include the Norfolk Southern Railroad Crossing Profile Adjustments in Decatur. Length 2.071 mi.

The Bracket Estimate on this project is from $1,780,389 to $2,176,031 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.NH-0021(565) ,MONTGOMERY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 (West South Boulevard) from the junction of SR-3 (US-31) to the I-65 Interchange (Site1) and on SR-3 (US-31/West Boulevard) from the junction of SR-21 to the junction of Estate Avenue (Site 2). Length 1.248 mi.

The Bracket Estimate on this project is from $1,224,811 to $1,496,991 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.NH-0113(502) ,ESCAMBIA COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-113 from the junction of SR-3 (US-31) in Flomaton to the I-65 Interchange. Length 13.683 mi.

The Bracket Estimate on this project is from $5,206,181 to $6,363,110 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.NH-0157(525) ,COLBERT COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-157 from the Lawrence County Line to the junction of SR-20. Length 7.535 mi.

The Bracket Estimate on this project is from $3,686,523 to $4,505,750 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-0017(575) ,LAUDERDALE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from the junction of SR-133 in Florence to 0.170 mile north of the junction of CR-172. Length 5.570 mi.

The Bracket Estimate on this project is from $1,117,681 to $1,366,054 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPOA-0036(511) ,MORGAN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-36 from east of the I-65 Interchange in Hartselle to east of intersection of SR-67. Length 8.316 mi.

The Bracket Estimate on this project is from $1,125,063 to $1,375,077 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-0069(556) ,CLARKE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-69 from Cantuche Church (MP 15.184) to the junction of SR-12 (US-84) in Coffeeville. Length 7.071 mi.

The Bracket Estimate on this project is from $1,131,243 to $1,382,630 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPAA-0163(503) ,MOBILE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-163 from a point north of the I-10 Overpass (MP 8.680) to the junction of SR-16 (US-90) and the Illinois Central Railroad Crossing (MP 11.104). Length 2.424 mi.

The Bracket Estimate on this project is from $769,994 to $941,104 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-0248(501) & 99-407-162-248-501 ,COFFEE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:10.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-248 (Glover Avenue) from the junction of SR-27 to east of the junction of Freedom Drive to include the Drainage Structure Improvements east of the junction of SR-27 (East Lee Street) in Enterprise. Length 3.331mi.

The Bracket Estimate on this project is from $1,502,042 to $1,835,829 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-5117(252) ,MONTGOMERY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-24 (Cloverfield/Federal Road) from the Lowndes County Line to the intersection of SR-3 (US-31). Length 2.955 mi.

The Bracket Estimate on this project is from $525,346 to $642,089 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-HSIP-0007(547) ,ST. CLAIR COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the junction of SR-23 in Springville to north of the junction of Sweatt Road in Ashville. Length 9.938 mi.

The Bracket Estimate on this project is from $2,535,143 to $3,098,508 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-HSIP-0032(500) ,PICKENS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-32 from the Mississippi State Line to the junction of SR-17. Length 3.593 mi.

The Bracket Estimate on this project is from $1,706,638 to $2,085,891 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPAA-HSIP-0123(511) ,DALE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:10.00

for constructing the Safety Widening, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-123 from the junction of SR-51 in Ariton to the junction of SR-53 (US-231). Length 3.607 mi.

The Bracket Estimate on this project is from $1,253,926 to $1,532,576 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.STPNU-0718(250) ,BUTLER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-7 (7th Avenue/Monterey Road) from the junction of SR-10 to the Wilcox County Line. Length 9.385 mi.

The Bracket Estimate on this project is from $895,777 to $1,094,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.STPNU-3317(250) ,HALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-54 from the junction of SR-69 to the junction of SR-25 southwest of Greensboro. Length 2.210 mi.

The Bracket Estimate on this project is from $526,725 to $643,775 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPNU-3618(250) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-59 from the Dekalb County Line to the intersection of CR-16 east of Dutton. Length 1.956 mi.

The Bracket Estimate on this project is from $352,938 to $431,368 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPNU-4614(257) ,MARENGO COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-30 from the junction of CR-32 southwest of Magnolia to the junction of CR-36 at the Wilcox County Line. Length 3.999 mi.

The Bracket Estimate on this project is from $704,780 to $861,397 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.STPNU-5018(250) ,MONROE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-23 from the East City Limits of Frisco City to the West City Limits of Excel. Length 2.336 mi.

The Bracket Estimate on this project is from $524,119 to $640,590 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


82.STPNU-5416(252) ,PICKENS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on CR-75 from the intersection of CR-26 to the intersection of CR-30 in Ethelsville. Length 4.905 mi.

The Bracket Estimate on this project is from $697,334 to $852,297 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


83.STPNU-6218(250) ,TALLAPOOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-45 (Lovelady Road) from the junction of SR-49 to the junction of SR-50. Length 8.558 mi.

The Bracket Estimate on this project is from $797,821 to $975,115 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


84.STPNU-6615(254) ,WILCOX COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Resurfacing, Guardrail Replacement, and Traffic Stripe on CR-24 from the junction of SR-21 to the junction of CR-59 northeast of Oak Hill. Length 4.139 mi.

The Bracket Estimate on this project is from $644,591 to $787,834 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


85.STPNU-6618(251) ,WILCOX COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-37 from the intersection of CR-31 northeast of Camden to the junction of CR-43 and on CR-43 from the junction of CR-37 to the junction of Deer Run Drive. Length 2.400 mi.

The Bracket Estimate on this project is from $325,472 to $397,799 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.STPOA-2818(250) ,ETOWAH COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on North College Street from the junction of Railroad Avenue to the intersection of Rabbittown Road in Glencoe. Length 2.385 mi.

The Bracket Estimate on this project is from $363,405 to $444,161 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


89.STPOA-8121(601) ,ETOWAH COUNTY

Contract Time: 125 Working Days

DBE Goal Percent:10.00

for constructing the Widening, Planing, Resurfacing, and Traffic Stripe on South 11th Street from the junction of CR-205 (Black Creek Parkway) to the junction of Piedmont Avenue in Gadsden. Length 0.626 mi.

The Bracket Estimate on this project is from $1,775,620 to $2,170,202 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $27.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


92.99-509-490-188-602 & 99-509-491-188-700 ,MOBILE COUNTY

Contract Time: 150 Working Days

for constructing the Seawall Replacement on SR-188 located at MP 10.220 to include the Relocation of Movable Barriers and Gate Arms at the J. A. Wintzell Memorial Bridge in Bayou La Batre.

The Bracket Estimate on this project is from $1,949,859 to $2,383,161 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $41.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


93.99-609-495-042-802 ,MOBILE COUNTY

Contract Time: 120 Working Days

for constructing the Interior Lighting on SR-42 (US-98) in the Bankhead Tunnel in Mobile. Length 0.641 mi.

The Bracket Estimate on this project is from $1,144,817 to $1,399,220 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(957) ,MONROE AND WILCOX COUNTIES

Contract Time: 75 Working Days

for constructing the ADA Required Curb Ramp Installations and Modifications on various routes at various locations as indicated by the plans.

The Bracket Estimate on this project is from $303,292 to $370,691 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)