Office Engineer

Proposal Letting List
March 29, 2019, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

*1. ACNU59434-ATRP(007), TALLADEGA 4. ERPR-9020(902), CLARKE
**7. FLAP-STPNU-FLAP(030), WINSTON *10. HSIP-NR17(932), TUSCALOOSA, ETC.
11. HSIP-NR19(906), BALDWIN, ETC. 12. HSIP-NR19(909), MARENGO, ETC.
15. IM-I065(495), ETC., CULLMAN 18. NH-0009(567), MONTGOMERY
19. NH-0020(529), MORGAN 20. NH-0035(534), DEKALB
23. NH-HSIP-0001(605), CHAMBERS 24. NH-HSIP-0006(572), TUSCALOOSA
25. NH-HSIP-0012(563), ETC., COFFEE 27. STPNU-0009(570), CHEROKEE
28. STPAA-0054(502), COVINGTON 29. STPAA-0129(505), ETC., MARION
30. STPAA-0118(251), AUTAUGA 32. STPAA-HSIP-0022(530), TALLAPOOSA
33. STPAA-HSIP-0165(503), RUSSELL 39. STPNU-0117(250), AUTAUGA
**40. STPNU-2418(251), DALLAS 41. STPNU-3118(250), GENEVA
44. STPNU-HSIP-0069(558), CLARKE 45. STPNU-HSIP-0114(503), MARENGO
**48. STPOA-0021(543), CALHOUN **51. TRC-ST-063-069-013, TUSCALOOSA
54. 99-406-011-065-801, AUTAUGA *55. 99-502-690-000-801, COLBERT, ETC.
* - WITHDRAWN FROM THE LETTING
** - ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACNU59434-ATRP(007) ,TALLADEGA COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:6.00

for constructing the Roadway Extension (Grading, Drainage, Pavement, and Traffic Stripe) of CR-47 (Priebes Mill Road) from the junction of SR-21 to the junction of CR-58 (Jenifer Road). Length 1.463 mi.

The Bracket Estimate on this project is from $3,719,780 to $4,546,398 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $51.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


4.ERPR-9020(902) ,CLARKE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Slide Repair on SR-69 at various sites between MP 25.000 and 26.000.

The Bracket Estimate on this project is from $590,267 to $721,438 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.FLAP-STPNU-FLAP(030) ,WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-8 from the junction of SR-195 to the junction of CR-292 southwest of Arley. Length 8.967 mi.

The Bracket Estimate on this project is from $1,279,809 to $1,564,211 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

****ALL BIDS REJECTED****
 

Return To: Proposal Letting List (Top of web page)


10.HSIP-NR17(932) ,TUSCALOOSA AND WALKER COUNTIES

Contract Time: 30 Working Days

for constructing the Road Safety Assessment Sites (High Friction Surface Treatment) on SR-124, SR-18, SR-69, SR-171, SR-6, and SR-216 at various locations in the West Central Region as indicated in the plans. Length 1.717 mi.

The Bracket Estimate on this project is from $661,723 to $808,773 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


11.HSIP-NR19(906) ,BALDWIN, ESCAMBIA, MOBILE, AND CONECUH COUNTIES

Contract Time: 75 Working Days

for constructing the Safety Improvements (Curve Warning Sign Installation) on various routes in the Southwest Region (Mobile Area) as indicated in the plans.

The Bracket Estimate on this project is from $388,351 to $474,651 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.HSIP-NR19(909) ,MARENGO, CLARKE, WILCOX, MONROE, CHOCTAW, AND WASHINGTON COUNTIES

Contract Time: 100 Working Days

for constructing the Safety Improvements (Curve Warning Sign Installation) on various routes in the Southwest Region (Grove Hill Area) as indicated in the plans.

The Bracket Estimate on this project is from $807,996 to $987,551 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.IM-I065(495) & IM-I065(482) ,CULLMAN COUNTY

Contract Time: 280 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on I-65 from south of the CR-222 Overpass to a point near the Hurricane Creek Bridge northwest of South Vinemont. Length 11.491 mi.

The Bracket Estimate on this project is from $17,358,882 to $21,216,411 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.NH-0009(567) ,MONTGOMERY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 (US-231) from the junction of Northchase Boulevard to north of the intersection of Brooks Road (MP 112.746) in Montgomery. Length 1.099 mi.

The Bracket Estimate on this project is from $922,707 to $1,127,752 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.NH-0020(529) ,MORGAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-20 (US-72A) from 0.360 mile east of the Lawrence County Line to just west of the junction of SR-67 (State Docks Road). Length 3.598 mi.

The Bracket Estimate on this project is from $1,542,926 to $1,885,798 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.NH-0035(534) ,DEKALB COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-35 from the junction of SR-7 (US-11) to the Big Willis Creek Bridge (MP 25.400) in Fort Payne. Length 2.360 mi.

The Bracket Estimate on this project is from $2,207,742 to $2,698,351 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.NH-HSIP-0001(605) ,CHAMBERS COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the South Town Limits of Five Points (MP 169.783) to the Randolph County Line. Length 7.687 mi.

The Bracket Estimate on this project is from $2,521,520 to $3,081,858 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.NH-HSIP-0006(572) ,TUSCALOOSA COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:5.00

for constructing the Safety Improvements (Shoulder Widening and Turn Lane Additions), Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from east of the junction of Bel Aire Estates to east of the junction of 5th Street in Northport. Length 3.976 mi.

The Bracket Estimate on this project is from $3,447,835 to $4,214,021 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $43.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.NH-HSIP-0012(563) & NH-HSIP-0167(511) ,COFFEE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-12 (Enterprise Bypass) from the junction of SR-88/SR-192 (North Main Street) to the junction of SR-134 (East Park Avenue) (Site 1) and on SR-167 (Enterprise Bypass) from the junction of SR-88/SR-192 (Plaze Drive) to the junction of SR-134 (East Park Avenue) in Enterprise (Site 2). Length 4.411 mi.

The Bracket Estimate on this project is from $3,122,988 to $3,816,986 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.STPNU-0009(570) ,CHEROKEE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 from Terrapin Creek (MP 250.670) to the intersection of SR-25 (US-411) in Centre. Length 6.950 mi.

The Bracket Estimate on this project is from $1,994,653 to $2,437,910 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.STPAA-0054(502) ,COVINGTON COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing/Preventative Maintenance (High Performance Chip Seal) and Traffic Stripe on SR-54 from the junction of SR-9 (US-331) in Florala to the Geneva County Line. Length 9.203 mi.

The Bracket Estimate on this project is from $627,807 to $767,320 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.STPAA-0129(505) & STPAA-0129(506) ,MARION COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-129 from the junction of Elliott Road to the junction of SR-74 (US-278) north of Brilliant. Length 10.264 mi.

The Bracket Estimate on this project is from $2,755,124 to $3,367,374 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.STPAA-0118(251) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-85 from north of the CSX Railroad Crossing to the junction of SR-143 northwest of Deatsville. Length 1.074 mi.

The Bracket Estimate on this project is from $340,726 to $416,443 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.STPAA-HSIP-0022(530) ,TALLAPOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-22 from a point east of the Hillabee Street Overpass (MP 117.175) in Alexander City to 0.480 mile east of the junction of Hillabee Hills Road. Length 5.301 mi.

The Bracket Estimate on this project is from $1,752,770 to $2,142,275 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.STPAA-HSIP-0165(503) ,RUSSELL COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-165 from the junction of CR-39 to the junction of SR-1 (US-431) southwest of Phenix City. Length 3.654 mi.

The Bracket Estimate on this project is from $1,810,381 to $2,212,688 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPNU-0117(250) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-19 from the junction of SR-14 in Autaugaville to the junction of CR-40. Length 7.036 mi.

The Bracket Estimate on this project is from $703,055 to $859,289 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPNU-2418(251) ,DALLAS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-43 from the junction of CR-7 to 0.400 mile south of the junction of CR-420. Length 1.831 mi.

The Bracket Estimate on this project is from $348,103 to $425,460 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


41.STPNU-3118(250) ,GENEVA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-33 from the Florida State Line to the junction of SR-27 southwest of Geneva. Length 2.532 mi.

The Bracket Estimate on this project is from $447,424 to $546,851 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPNU-HSIP-0069(558) ,CLARKE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-69 from the junction of SR-177 in Jackson to 0.608 mile north of the junction of CR-23 (Salt Works Road) northwest of Jackson. Length 6.928 mi.

The Bracket Estimate on this project is from $1,328,233 to $1,623,396 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.STPNU-HSIP-0114(503) ,MARENGO COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-114 from the Choctaw County Line to the junction of SR-69 in Myrtlewood. Length 4.792 mi.

The Bracket Estimate on this project is from $1,097,873 to $1,341,845 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPOA-0021(543) ,CALHOUN COUNTY

Contract Time: 30 Working Days

for constructing the Traffic Signal Improvements (Traffic Signs, Traffic Signals, and Traffic Stripe) on SR-21 (McClellan Boulevard) at the intersection of Lenlock Lane in Anniston.

The Bracket Estimate on this project is from $150,930 to $184,471 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


51.TRC-ST-063-069-013 ,TUSCALOOSA COUNTY

Contract Time: 120 Working Days

for constructing the Intersection Realignment (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-69 at CR-62 (Union Chapel Road) in Northport. Length 0.185 mi.

The Bracket Estimate on this project is from $1,575,172 to $1,925,210 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

****ALL BIDS REJECTED****

Return To: Proposal Letting List (Top of web page)


54.99-406-011-065-801 ,AUTAUGA COUNTY

Contract Time: 45 Working Days

for constructing the Slope Repair (Front Slope Failure) on I-65 at MP 190.400 (Southbound Roadway) northwest of Montgomery. Length 0.435 mi.

The Bracket Estimate on this project is from $746,247 to $912,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.99-502-690-000-801 ,COLBERT, LIMESTONE, AND LAWRENCE COUNTIES

Contract Time: 45 Working Days

for the Maintenance Bridge Scour Repair and Preventative Measures on SR-157 and SR-251 at various locations as indicated in the plans.

The Bracket Estimate on this project is from $601,042 to $734,607 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

****WITHDRAWN FROM THE LETTING****