Office Engineer

Proposal Letting List
April 26, 2019, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

**1. ACBRZ60377-ATRP(014), CLEBURNE 2. ACBRZ61376-ATRP(012), ETOWAH
5. BR-0051(512), LEE 8. ERPR-9020(903), CLARKE
9. ERPR-9020(905), LOWNDES *12. HRRR-4516(252), MADISON
15. HSIP-0022(529), DALLAS 16. HSIP-NR17(932), TUSCALOOSA, ETC.
18. IM-HSIP-I065(500), CONECUH, ETC. 19. IM-I065(481), CULLMAN
20. IM-I065(498), ELMORE, ETC. 25. NH-0001(607), ETC., RANDOLPH
26. NH-0038(543), RUSSELL 29. NH-HSIP-0006(574), BIBB
30. NH-HSIP-0053(582), CULLMAN 31. NH-HSIP-0053(584), MARSHALL
34. STPAA-0003(613), ETC., SHELBY 35. STPAA-0009(569), CHEROKEE
36. STPOA-0010(547), ETC., BUTLER 37. STPAA-0017(577), LAUDERDALE
38. STPAA-0018(512), FAYETTE 39. STPNU-0021(566), ETC., MONROE
40. STPNU-0021(567), MONROE 41. STPAA-0118(516), WALKER
**42. STPAA-0185(504), BUTLER 43. STPAA-7729(600), MONTGOMERY
46. STPAA-HSIP-0025(552), ST. CLAIR 47. NH-0008(593), ETC., MARENGO
49. STPAA-HSIP-0171(515), FAYETTE 51. STPNU-HSIP-0185(503), LOWNDES
54. STPMN-5118(252), MONTGOMERY 58. STPNU-1019(250), CHEROKEE
59. STPNU-3318(250), HALE 60. STPNU-3816(250), LAMAR
62. STPOA-5518(250), PIKE 63. STPNU-6618(252), WILCOX
66. STPOA-1716(250), COLBERT 69. STPAA-2615(252), ETC., ELMORE
**72. ST-049-999-014, MOBILE 75. 99-502-690-000-801, COLBERT, ETC.
*76. 99-503-582-000-802, ST. CLAIR 77. 99-509-022-182-900, BALDWIN
*WITHDRAWN FROM THE LETTING
**ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACBRZ60377-ATRP(014) ,CLEBURNE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Replacement and Approaches on CR-533 (Campbell Street) over Cahulga Creek in Heflin. Length 0.052 mi.

The Bracket Estimate on this project is from $391,712 to $478,759 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


2.ACBRZ61376-ATRP(012) ,ETOWAH COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-568 (Yates Road) over Black Creek. Length 0.257 mi.

The Bracket Estimate on this project is from $1,137,535 to $1,390,321 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.BR-0051(512) ,LEE COUNTY

Contract Time: 205 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR- 51 over Robinson Creek in Opelika. Length 0.359 mi.

The Bracket Estimate on this project is from $2,212,338 to $2,703,969 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.ERPR-9020(903) ,CLARKE COUNTY

Contract Time: 35 Working Days

for constructing the Slide Repair on SR-13 (US-43) (Northbound Roadway) from the junction of CR-203 (Bear Fork Road) to a point 0.200 mile north.

The Bracket Estimate on this project is from $426,913 to $521,782 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.ERPR-9020(905) ,LOWNDES COUNTY

Contract Time: 30 Working Days

for constructing the Roadway Restoration on CR-17 over a tributary to Panthers Creek approximately 1.500 miles south of the junction of Mary J. Jackson Road. Length 0.036 mi.

The Bracket Estimate on this project is from $115,589 to $141,276 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.HRRR-4516(252) ,MADISON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:10.00

for constructing the Safety Improvements (Shoulder Widening, Pavement Scoring, Traffic Signs, and Traffic Stripe) on Moores Mill Road from the junction of Countess Road to the junction of Darwin Road in Moores Mill. Length 2.613 mi.

The Bracket Estimate on this project is from $464,626 to $567,876 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)



15.HSIP-0022(529) ,DALLAS COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Intersection Safety Improvements on SR-22 at the junction of CR-81 north of Selma. Length 0.275 mi.

The Bracket Estimate on this project is from $619,678 to $757,385 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.HSIP-NR17(932) ,TUSCALOOSA AND WALKER COUNTIES

Contract Time: 30 Working Days

for constructing the Road Safety Assessment Sites (High Friction Surface Treatment) on SR-124, SR-18, SR-69, SR-171, SR-6, and SR-216 at various locations in the West Central Region as indicated in the plans. Length 1.717 mi.

The Bracket Estimate on this project is from $661,723 to $808,773 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.IM-HSIP-I065(500) ,CONECUH AND ESCAMBIA COUNTIES

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from the CR-40 (Wallace Road) Overpass to the CR-6 Interchange (Exit 83). Length 12.368 mi.

The Bracket Estimate on this project is from $4,011,131 to $4,902,493 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.IM-I065(481) ,CULLMAN COUNTY

Contract Time: 160 Working Days

DBE Goal Percent:2.00

for constructing the Roadway Lighting at the I-65 Rest Area north of Dodge City. Length 1.325 mi.

The Bracket Estimate on this project is from $1,354,516 to $1,655,519 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $27.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.IM-I065(498) ,ELMORE AND AUTAUGA COUNTIES

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-65 from the Montgomery County Line to just north of the Autauga County Line (MP 182.440). Length 5.309 mi.

The Bracket Estimate on this project is from $3,452,288 to $4,219,463 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.NH-0001(607) & NH-0001(608) ,RANDOLPH COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from 0.626 mile north of the junction of CR-61 to 0.180 mile north of the junction of CR-42 (Site 1) and on SR-1 (US-431) from 0.262 mile north of CR-610 to the South City Limits of Wedowee (Site 2). Length 3.076 mi.

The Bracket Estimate on this project is from $1,345,037 to $1,643,934 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.NH-0038(543) ,RUSSELL COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of Knowles Road to the SR-38 (US-280) Interchange in Phenix City (Site 1) and on SR-38 (US-280) from the SR-1 (US-431) Interchange in Phenix City to the Georgia State Line (Site 2). Length 1.565 mi.

The Bracket Estimate on this project is from $1,808,826 to $2,210,788 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-HSIP-0006(574) ,BIBB COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) from the Tuscaloosa County Line to 0.270 mile west of the junction of Haysop Church Road northwest of Eoline. Length 3.349 mi.

The Bracket Estimate on this project is from $3,476,992 to $4,249,657 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-HSIP-0053(582) ,CULLMAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) from the Blount County Line to the Marshall County Line. Length 3.560 mi.

The Bracket Estimate on this project is from $1,606,833 to $1,963,908 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.NH-HSIP-0053(584) ,MARSHALL COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) from the North City Limits of Arab to the Morgan County Line. Length 7.940 mi.

The Bracket Estimate on this project is from $4,786,138 to $5,849,725 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.STPAA-0003(613) & STPAA-0155(504) ,SHELBY COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the Chilton County Line to the junction of 7th Avenue in Calera (Site 1) and on SR-155 from the Chilton County Line to the junction of SR-25 in Montevallo (Site 2). Length 4.959 mi.

The Bracket Estimate on this project is from $2,233,609 to $2,729,966 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.STPAA-0009(569) ,CHEROKEE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on SR-9 from the Calhoun County Line north of Piedmont to the Terrapin Creek Bridge (MP 250.670). Length 7.250 mi.

The Bracket Estimate on this project is from $761,582 to $930,822 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPOA-0010(547) & 99-406-074-010-901 ,BUTLER COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, Culvert Extension, and Traffic Stripe on SR-10 from the Wilcox County Line to the junction of Administration Drive in Greenville. Length 17.025 mi.

The Bracket Estimate on this project is from $3,152,828 to $3,853,456 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-0017(577) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 from 0.170 mile north of the junction of CR-172 to the Tennessee State Line. Length 5.496 mi.

The Bracket Estimate on this project is from $808,682 to $988,389 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.STPAA-0018(512) ,FAYETTE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-18 from west of the junction of SR-107 to just west of the junction of CR-21 (North). Length 1.110 mi.

The Bracket Estimate on this project is from $682,102 to $833,680 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPNU-0021(566) & ST-050-999-008 ,MONROE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from the junction of Presley Road southwest of Frisco City to the junction of Hooks Road southwest of Monroeville to include Resurfacing on the Frisco City Truck ByPass. Length 7.276 mi.

The Bracket Estimate on this project is from $1,659,751 to $2,028,584 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPNU-0021(567) ,MONROE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on SR-21 from 0.500 mile north of the junction of CR-38 (Spotlight Road) northeast of Monroeville to the junction of Nettles Road in Tunnel Springs. Length 5.970 mi.

The Bracket Estimate on this project is from $1,088,211 to $1,330,036 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPAA-0118(516) ,WALKER COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-118 from the junction of Saragossa Road southeast of Carbon Hill to the junction of SR-4 (US-78) in Jasper. Length 3.847 mi.

The Bracket Estimate on this project is from $1,345,577 to $1,644,594 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-0185(504) ,BUTLER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-185 from the north end of the Railroad Bridge (MP 3.354) to the junction of Willow Lane in Greenville. Length 2.180 mi.

The Bracket Estimate on this project is from $1,161,625 to $1,419,764 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


43.STPAA-7729(600) ,MONTGOMERY COUNTY

Contract Time: 375 Working Days

DBE Goal Percent:10.00

for constructing the Planing, Resurfacing, Sidewalk Beautification, and Traffic Stripe on South Court Street from the junction of SR-6 (US-331/South Boulevard) to the intersection of CR-233 (Fairview Avenue) in Montgomery. Length 1.693 mi.

The Bracket Estimate on this project is from $6,217,470 to $7,599,130 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $68.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPAA-HSIP-0025(552) ,ST. CLAIR COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-25 (US-411) from the junction of SR-53 (US-231) in Ashville to the Etowah County Line. Length 10.416 mi.

The Bracket Estimate on this project is from $2,617,641 to $3,199,339 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.NH-0008(593) & STPAA-HSIP-0028(513) ,MARENGO COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) from the Sumter County Line to 0.320 mile east of the junction of SR-28 (Site 1) and the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-28 from the junction of SR-8 (US-80) to the junction of CR-21 (Site 2). Length 9.197 mi.

The Bracket Estimate on this project is from $1,761,839 to $2,153,358 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-HSIP-0171(515) ,FAYETTE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-171 from north of the junction of SR-102 to north of the junction of Stough Road south of Winfield. Length 5.510 mi.

The Bracket Estimate on this project is from $2,578,418 to $3,151,399 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPNU-HSIP-0185(503) ,LOWNDES COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-185 from the Butler County Line to the junction of SR-3 (US-31). Length 8.211 mi.

The Bracket Estimate on this project is from $2,074,506 to $2,535,507 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPMN-5118(252) ,MONTGOMERY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on CR-2120 (Alabama River Parkway) from the Toll Bridge over the Alabama River to the Montgomery City Limits. Length 1.682 mi.

The Bracket Estimate on this project is from $466,608 to $570,298 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPNU-1019(250) ,CHEROKEE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-29 from the junction of CR-33 to the junction of CR-643. Length 1.920 mi.

The Bracket Estimate on this project is from $278,602 to $340,513 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPNU-3318(250) ,HALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-30 from the junction of CR-17 north of Sawyerville to the junction of SR-14. Length 5.462 mi.

The Bracket Estimate on this project is from $1,157,732 to $1,415,006 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPNU-3816(250) ,LAMAR COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on CR-9 from the Mississippi State Line to the Southwest City Limits of Vernon. Length 13.576 mi.

The Bracket Estimate on this project is from $1,763,070 to $2,154,863 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPOA-5518(250) ,PIKE COUNTY

Contract Time: 20 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-7714 (Old CR-105) from the junction of SR-53 (US-231) to the junction of CR-7724 northwest of Troy. Length 1.987 mi.

The Bracket Estimate on this project is from $788,396 to $963,595 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-6618(252) ,WILCOX COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-43 from the junction of SR-10 in Camden to the junction of CR-31 (Site 1) and on CR-31 from the junction of CR-43 to the intersection of CR-37 (Site 2). Length 2.489 mi.

The Bracket Estimate on this project is from $429,498 to $524,942 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPOA-1716(250) ,COLBERT COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Street Improvements (Planing, Resurfacing, Sidewalk Improvements, and Traffic Stripe) on East and West 5th Street; East and West 6th Street; King Avenue; William F. Gardiner Avenue; Joe Wheeler Drive; East and West North Commons Street; North and South East Commons Street; Dickson Street; and North and South Hook Street at various locations in Tuscumbia as indicated in the plans. Length 7.116 mi.

The Bracket Estimate on this project is from $1,773,654 to $2,167,799 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPAA-2615(252) & TAPAA-TA13(912) ,ELMORE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:10.00

for constructing the Commercial Business District Revitalization (Resurfacing, Landscaping, Decorative Lighting, and Traffic Stripe) on various streets in Wetumpka as indicated in the plans. Length 0.562 mi.

The Bracket Estimate on this project is from $872,721 to $1,066,659 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.ST-049-999-014 ,MOBILE COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement and Approaches on Dunlap Drive over Pinto Pass in Mobile. Length 0.085 mi.

The Bracket Estimate on this project is from $881,999 to $1,077,999 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


75.99-502-690-000-801 ,COLBERT, LIMESTONE, AND LAWRENCE COUNTIES

Contract Time: 45 Working Days

for the Maintenance Bridge Scour Repair and Preventative Measures on SR-157 and SR-251 at various locations as indicated in the plans.

The Bracket Estimate on this project is from $601,042 to $734,607 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


76.99-503-582-000-802 ,ST. CLAIR COUNTY

Contract Time: 70 Working Days

for constructing the Scour Countermeasures on SR-4 (US-78) and SR-34 at various locations over the Coosa River as indicated in the plans.

The Bracket Estimate on this project is from $265,147 to $324,068 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


77.99-509-022-182-900 ,BALDWIN COUNTY

Contract Time: 365 Calendar Days

for the Maintenance Dredging of Little Lagoon Pass in Gulf Shores as indicated in the plans.

The Bracket Estimate on this project is from $652,093 to $797,003 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)