Office Engineer

Proposal Letting List
July 26, 2019, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

4. ACBRZ59617-ATRP(007), TUSCALOOSA 7. ACNU60588-ATRP(004), LOWNDES
8. ACNU62174-ATRP(005), ETC., TALLADEGA 12. BR-0013(601), MOBILE
13. BR-0025(550), SHELBY 14. BR-0217(250), BALDWIN
17. CMAQ-NR13(954), JEFFERSON 20. DTPA-HSIP-0003(588), CULLMAN
23. FLAP-FLAP(020), COVINGTON **30. HSIP-I085(364), LEE
31. HSIP-MR19(901), DEKALB, ETC. 34. STPAA-2615(261), ELMORE
35. STPAA-2619(250), ETC., ELMORE 36. STPAA-6518(250), WASHINGTON
42. STPNU-0318(250), BARBOUR 43. STPAA-0417(250), BIBB
44. STPNU-2519(250), DEKALB **45. STPNU-5318(250), PERRY
48. TRC-STPOA-0069(536), TUSCALOOSA 50. STPOA-1719(250), COLBERT
**- ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


4.ACBRZ59617-ATRP(007) ,TUSCALOOSA COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-115 (Traweek Road) over Binion Creek northwest of Samantha. Length 0.045 mi.

The Bracket Estimate on this project is from $969,717 to $1,185,209 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



7.ACNU60588-ATRP(004) ,LOWNDES COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-37 from the junction of SR-185 in Fort Deposit to the intersection of SR-97. Length 12.594 mi.

The Bracket Estimate on this project is from $1,493,993 to $1,825,992 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



8.ACNU62174-ATRP(005) & TAPNU-TA17(903) ,TALLADEGA COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:10.00

for constructing the Roadway Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on Magnolia Street from the junction of SR-77 to the intersection of SR-4 (US-78) to include constructing the Sidewalk and Pedestrian Improvements on Magnolia Street from the junction of SR-77 to a point near Lincoln Hall in Lincoln. Length 0.601 mi.

The Bracket Estimate on this project is from $2,428,175 to $2,967,769 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



12.BR-0013(601) ,MOBILE COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:5.00

for constructing the Culvert Replacement (Grading, Drainage, Pavement, Bridge, and Traffic Stripe) on SR-13 (US-43) over Steele Creek in Satsuma. Length 0.434 mi.

The Bracket Estimate on this project is from $2,965,495 to $3,624,493 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



13.BR-0025(550) ,SHELBY COUNTY

Contract Time: 125 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement and Approaches on SR-25 over Bulley Creek in Wilsonville. Length 0.255 mi.

The Bracket Estimate on this project is from $1,098,671 to $1,342,820 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



14.BR-0217(250) ,BALDWIN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches on CR-9 over Barner Branch northwest of Magnolia Springs. Length 0.184 mi.

The Bracket Estimate on this project is from $916,992 to $1,120,768 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



17.CMAQ-NR13(954) ,JEFFERSON COUNTY

Contract Time: 145 Working Days

DBE Goal Percent:4.00

for constructing the Sidewalk Installations on 24th Street North, Berkley Avenue, Arlington Avenue, and Owen Avenue in Bessemer.

The Bracket Estimate on this project is from $884,862 to $1,081,498 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $40.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



20.DTPA-HSIP-0003(588) ,CULLMAN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:8.00

for constructing the Acceleration Lane Extension (Planing, Resurfacing, Traffic Signals, and Traffic Stripe) on SR-3 (US-31) at the Intersection of Olive Street in Cullman. Length 0.270 mi.

The Bracket Estimate on this project is from $865,606 to $1,057,963 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



23.FLAP-FLAP(020) ,COVINGTON COUNTY

Contract Time: 40 Working Days

for constructing the Bridge Replacement on Sanders Road over an unnamed tributary to Yellow River southeast of Falco. Length 0.001 mi.

The Bracket Estimate on this project is from $115,615 to $141,307 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



30.HSIP-I085(364) ,LEE COUNTY

Contract Time: 55 Working Days

for constructing the Interstate Lighting Upgrades on I-85 at the Exit 58 Interchange in Opelika. Length 0.738 mi.

The Bracket Estimate on this project is from $365,689 to $446,954 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

*****ALL BIDS REJECTED*****

Return To: Proposal Letting List (Top of web page)



31.HSIP-MR19(901) ,DEKALB, JACKSON, AND MADISON COUNTIES

Contract Time: 40 Working Days

for constructing the Safety Improvements (Curve Warning Sign Installation) on various routes in the North Region (Guntersville Area) as indicated in the plans.

The Bracket Estimate on this project is from $373,479 to $456,475 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



34.STPAA-2615(261) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Widening for Bike Lanes, Resurfacing, and Traffic Stripe on Browns Road from the intersection of SR-143 to the junction of SR-14 in Millbrook. Length 0.768 mi.

The Bracket Estimate on this project is from $280,824 to $343,230 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



35.STPAA-2619(250) & STPAA-2619(251) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Micro-Surfacing) and Traffic Stripe on CR-59 (Firetower Road) from the junction of CR-8 (Redland Road) to the junction of SR-14 southeast of Wetumpka (Site 1) and on CR-8 (Redland Road) from a point east of the junction of CR-4 (Rifle Range Road) to the junction of CR-116 (Marshell Road) northeast of Wetumpka (Site 2). Length 10.988 mi.

The Bracket Estimate on this project is from $683,985 to $835,981 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



36.STPAA-6518(250) ,WASHINGTON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on CR-31 from the junction of SR-17 in Chatom to the intersection of CR-34 in Bigbee. Length 10.020 mi.

The Bracket Estimate on this project is from $2,049,928 to $2,505,467 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



42.STPNU-0318(250) ,BARBOUR COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on CR-79 from the junction of SR-30 to the junction of SR-6 (US-82) southeast of Comer. Length 11.244 mi.

The Bracket Estimate on this project is from $395,401 to $483,268 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



43.STPAA-0417(250) ,BIBB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-27 (Coldwater Road) from the junction of SR-5 adjacent to Forest Lane to the junction of SR-5 adjacent to a point near the North Bibb Probate Office in Woodstock. Length 2.749 mi.

The Bracket Estimate on this project is from $850,927 to $1,040,022 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



44.STPNU-2519(250) ,DEKALB COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-116 from the junction of CR-27 in Sylvania to the junction of CR-85. Length 3.820 mi.

The Bracket Estimate on this project is from $981,003 to $1,199,003 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



45.STPNU-5318(250) ,PERRY COUNTY

Contract Time: 60 Working Days

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-12 from the junction of SR-183 in Uniontown to the intersection of SR-5. Length 9.010 mi.

The Bracket Estimate on this project is from $2,022,597 to $2,472,062 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

*****ALL BIDS REJECTED*****

Return To: Proposal Letting List (Top of web page)



48.TRC-STPOA-0069(536) ,TUSCALOOSA COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:8.00

for constructing the Intersection Realignment (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-69 at CR-62 (Union Chapel Road) in Northport. Length 0.185 mi.

The Bracket Estimate on this project is from $1,419,316 to $1,734,720 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



50.STPOA-1719(250) ,COLBERT COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Traffic Stripe on CR-24 (6th Street) from the junction of CR-22 (Elledge Lane) to a point west of the junction of Counts Drive in Muscle Shoals. Length 1.931 mi.

The Bracket Estimate on this project is from $485,381 to $593,244 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)