Office Engineer

Proposal Letting List
August 30, 2019, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. IMF-I085(317), CHAMBERS 3. BRF-0008(581), LOWNDES
7. DPTA-5419(250), PICKENS 10. FLAP-FLAP(022), CLEBURNE
11. FLAP-STPNU-FLAP(028), WINSTON 14. HRRR-0719(250), BUTLER
15. HRRR-1619(250), COFFEE 16. HRRR-2519(251), DEKALB
17. HRRR-3119(250), GENEVA 18. HRRR-3419(250), HENRY
19. HRRR-4516(250), MADISON 20. HRRR-4516(251), MADISON
21. HRRR-4516(252), MADISON 22. HRRR-6019(250), SUMTER
25. HSIP-MR19(902), ETOWAH, ETC. 28. STPAA-5719(250), RUSSELL
29. STPAA-5818(250), ST. CLAIR 32. STPNU-2419(250), DALLAS
33. DPTA-5619(250), RANDOLPH *34. STPOA-6116(252), TALLADEGA
37. STPOA-0815(255), CALHOUN 43. ST-051-110-009, MONTGOMERY
46. 99-307-234-000-901, DALE 47. 99-307-306-000-901, BARBOUR
48. 99-503-582-000-801, ST. CLAIR
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IMF-I085(317) ,CHAMBERS COUNTY

Contract Time: 4/16/2021 Completion Date

DBE Goal Percent:5.00

for constructing the Welcome Center Replacement on I-85 at the Georgia State Line. Length 0.470 mi.

The Bracket Estimate on this project is from $11,165,951 to $13,647,274 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $66.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Thursday, August 8, 2019, at the Alabama Department of Transportation - Alexander City Area Office, 240 Highway 280, Alexander City, AL 35010 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)



3.BRF-0008(581) ,LOWNDES COUNTY

Contract Time: 225 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-8 (US-80) over Big Swamp Creek. Length 2.508 mi.

The Bracket Estimate on this project is from $6,596,426 to $8,062,298 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $59.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.DPTA-5419(250) ,PICKENS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-63 from 0.900 mile south of the junction of Snider Road to the junction of SR-6 (US-82) south of Gordo. Length 6.999 mi.

The Bracket Estimate on this project is from $960,532 to $1,173,983 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.FLAP-FLAP(022) ,CLEBURNE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Permanent Restoration (Soil Nail Wall Installation, Scour/Erosion Damage Repair, Resurfacing, Patching, and Minor Drainage Improvements) on Cheaha Road near the junction of Cheaha Lake Drive. Length 0.071 mi.

The Bracket Estimate on this project is from $371,680 to $454,275 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.FLAP-STPNU-FLAP(028) ,WINSTON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on CR-23 from the junction of SR-195 to the junction of CR-60 and on CR-60 from the junction of CR-23 to the Lawrence County Line. Length 9.156 mi.

The Bracket Estimate on this project is from $1,379,755 to $1,686,368 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.HRRR-0719(250) ,BUTLER COUNTY

Contract Time: 15 Working Days

for constructing the Guardrail Installations on CR-16 over Rocky Creek (Site 1); on CR-16 over Persimmon Creek (Site 2); and on CR-16 over Persimmon Creek Relief (Site 3). Length 0.142 mi.

The Bracket Estimate on this project is from $140,967 to $172,292 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.HRRR-1619(250) ,COFFEE COUNTY

Contract Time: 20 Working Days

for constructing the Guardrail Installations on CR-644 over Tight Eye Creek (Site 1) and on CR-342 over Big Creek (Site 2). Length 0.166 mi.

The Bracket Estimate on this project is from $111,774 to $136,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.HRRR-2519(251) ,DEKALB COUNTY

Contract Time: 20 Working Days

for constructing the Guardrail Installations on CR-24 over Scarham Creek (Site 1) and on CR-51 over Big Wills Creek (Site 2). Length 0.172 mi.

The Bracket Estimate on this project is from $130,660 to $159,696 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.HRRR-3119(250) ,GENEVA COUNTY

Contract Time: 15 Working Days

for constructing the Guardrail Installations on CR-10 over Eight Mile Creek (Site 1) and on CR-1 over Natural Bridge Creek (Site 2). Length 0.103 mi.

The Bracket Estimate on this project is from $96,716 to $118,208 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.HRRR-3419(250) ,HENRY COUNTY

Contract Time: 20 Working Days

for constructing the Guardrail Installations on CR-46 over Abbie Creek (Site 1) and on CR-55 over Omussee Creek (Site 2). Length 0.177 mi.

The Bracket Estimate on this project is from $112,764 to $137,822 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.HRRR-4516(250) ,MADISON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:10.00

for constructing the Safety Improvements (Shoulder Widening, Pavement Scoring, Traffic Signs, and Traffic Stripe) on Ryland Pike from the junction of SR-2 (US-72) to the junction of Everett Road. Length 3.014 mi.

The Bracket Estimate on this project is from $560,207 to $684,698 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.HRRR-4516(251) ,MADISON COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:10.00

for constructing the Safety Improvements (Shoulder Widening, Pavement Scoring, Traffic Signs, and Traffic Stripe) on Hobbs Island Road from the Huntsville City Limits to the junction of Vann Road. Length 6.099 mi.

The Bracket Estimate on this project is from $999,697 to $1,221,852 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $65.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.HRRR-4516(252) ,MADISON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:10.00

for constructing the Safety Improvements (Shoulder Widening, Pavement Scoring, Traffic Signs, and Traffic Stripe) on Moores Mill Road from the junction of Countess Road to the junction of Darwin Road in Moores Mill. Length 2.613 mi.

The Bracket Estimate on this project is from $466,547 to $570,224 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.HRRR-6019(250) ,SUMTER COUNTY

Contract Time: 40 Working Days

for constructing the Guardrail Installations on CR-12 over Potts and Sanusi Creeks (Sites 1 and 2); on CR-42 over Cotahaga Creek (Sites 3 and 4); and on CR-10 over Thornton and Kinterbish Creeks (Sites 5 and 6). Length 0.227 mi.

The Bracket Estimate on this project is from $249,498 to $304,942 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.HSIP-MR19(902) ,ETOWAH AND CHEROKEE COUNTIES

Contract Time: 30 Working Days

for constructing the Safety Improvements (Curve Warning Sign Installation) on various routes at various locations in the North Region (Guntersville Area) as indicated in the plans.

The Bracket Estimate on this project is from $117,542 to $143,663 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.STPAA-5719(250) ,RUSSELL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-49 (Rutherford Road) from the Barbour County Line to the Hurtsboro City Limits. Length 9.429 mi.

The Bracket Estimate on this project is from $1,468,894 to $1,795,315 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.STPAA-5818(250) ,ST. CLAIR COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-10 (Park Avenue) from east of the intersection of SR-25 (US-411) to the intersection of Kelly Creek Road and on Kelly Creek Road from the intersection of CR-10 (Park Avenue) to the I-20 Denied Access Line in Moody. Length 1.987 mi.

The Bracket Estimate on this project is from $837,536 to $1,023,655 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.STPNU-2419(250) ,DALLAS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-52 from the junction of CR-63 to the Autauga County Line. Length 2.075 mi.

The Bracket Estimate on this project is from $435,215 to $531,929 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.DPTA-5619(250) ,RANDOLPH COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Full Depth Reclamation), Guardrail Installation, and Traffic Stripe on CR-87 from the junction of CR-438 to the intersection of SR-48 in Graham. Length 2.623 mi.

The Bracket Estimate on this project is from $1,089,372 to $1,331,454 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)



34.STPOA-6116(252) ,TALLADEGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-175 from the junction of SR-21 northwest of Sycamore to the junction of SR-76 northeast of Childersburg. Length 5.589 mi.

The Bracket Estimate on this project is from $843,037 to $1,030,378 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

*****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


37.STPOA-0815(255) ,CALHOUN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Intersection Improvements (Grading, Drainage, Pavement, Traffic Signs, and Traffic Stripe) on 4th Street at Noble Street to include the Bicycle and Pedestrian Improvements on Noble Street from the intersection of 4th Street to the junction of SR-202 in Anniston. Length 0.369 mi.

The Bracket Estimate on this project is from $469,084 to $573,325 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.ST-051-110-009 ,MONTGOMERY COUNTY

Contract Time: 35 Working Days

for constructing the Turn Lanes (Grading, Drainage, Pavement, Traffic Signs, and Traffic Stripe) on SR-110 (Eastbound Lane) to the intersection of CR-85 (Pike Road) in Montgomery. Length 0.187 mi.

The Bracket Estimate on this project is from $383,335 to $468,521 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.99-307-234-000-901 ,DALE COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-53 (US-231) at the Rest Area (Drive and Parking Area) south of Ozark.

The Bracket Estimate on this project is from $206,458 to $252,338 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.99-307-306-000-901 ,BARBOUR COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Markings on SR-1 (US-431) at the Rest Area (Parking Area) south of Eufaula.

The Bracket Estimate on this project is from $202,344 to $247,310 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.99-503-582-000-801 ,ST. CLAIR COUNTY

Contract Time: 70 Working Days

for constructing the Scour Countermeasures on SR-4 (US-78) and SR-34 at various locations over the Coosa River as indicated in the plans.

The Bracket Estimate on this project is from $259,308 to $316,932 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items