Office Engineer

Proposal Letting List
February 28, 2020, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. NHF-0158(505), ETC., MOBILE 5. BR-0005(517), JEFFERSON
*6. BR-0006(563), MONTGOMERY 14. HRRR-BRZ-2119(250), CRENSHAW
17. HRRR-5219(250), MORGAN 18. HRRR-5519(250), PIKE
21. IM-I059(420), GREENE 22. IM-I065(493), MONTGOMERY
27. NH-0003(625), MORGAN 28. NH-0008(595), DALLAS
29. NH-0041(519), DALLAS 31. NH-0149(503), JEFFERSON
32. NH-0157(526), LAWRENCE 35. NH-HSIP-0003(624), CONECUH
38. BR-0618(251), BULLOCK 43. BRZ-0518(251), BLOUNT
44. RABRZ-1317(250), CLARKE 45. RABRZ-1514(251), CLEBURNE
48. STPNU-1219(251), CHOCTAW 50. RASTPNU-3218(251), GREENE
51. STPNU-3619(251), JACKSON 52. RASTPNU-4318(250), LOWNDES
53. RASTPNU-5018(251), ETC., MONROE 54. STPNU-6616(251), WILCOX
57. STPOA-4818(251), MARSHALL 60. STPAA-0003(623), BALDWIN
64. STPAA-0015(534), ETC., ESCAMBIA 65. STPAA-0021(569), MONROE
67. STPAA-0047(506), MONROE 68. STPAA-0049(513), CLAY, ETC.
*70. STPAA-0075(538), BLOUNT 71. STPAA-0087(514), ETC., PIKE
73. STPAA-0069(560), CULLMAN *75. STPAA-HSIP-0003(620), JEFFERSON
78. STPAA-HSIP-0017(579), PICKENS 79. STPAA-HSIP-0022(532), ETC., TALLAPOOSA
80. STPAA-HSIP-0069(563), HALE 81. STPAA-HSIP-0223(505), BULLOCK
83. STPOA-0819(250), CALHOUN 88. STPPC-4118(252), LEE
94. 99-810-690-000-803, WALKER
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.NHF-0158(505) & BP-049-042-016 ,MOBILE COUNTY

Contract Time: 5/27/2022 Completion Date

DBE Goal Percent:6.00

for constructing the Roadway Extension Overpass (Grading, Drainage, Pavement, and Bridge) and Jug Handle on SR-158 over a tributary of EB Seabury Creek and Partial Lott Road to include the Minor Widening, Resurfacing, and Traffic Stripe on SR-158 from 0.020 mile west of the junction of Schillinger Road to 0.400 mile east of the junction of Schillinger Road in Semmes. Length 1.093 mi.

The Bracket Estimate on this project is from $17,147,508 to $20,958,065 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $102.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.BR-0005(517) ,JEFFERSON COUNTY

Contract Time: 240 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-5 (US-78) over Locust Fork of the Black Warrior River. Length 0.681 mi.

The Bracket Estimate on this project is from $7,460,483 to $9,118,368 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.BR-0006(563) ,MONTGOMERY COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:8.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-6 (US-231) over Jenkins Creek. Length 1.116 mi.

The Bracket Estimate on this project is from $4,937,985 to $6,035,315 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $57.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


14.HRRR-BRZ-2119(250) ,CRENSHAW COUNTY

Contract Time: 20 Working Days

for constructing the Guardrail Installations on CR-30 over Piney Woods Creek (Site 1) and Blue Creek (Site 2). Length 0.138 mi.

The Bracket Estimate on this project is from $103,970 to $127,075 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.HRRR-5219(250) ,MORGAN COUNTY

Contract Time: 15 Working Days

for constructing the Guardrail Installations on CR-1296 (Apple Grove Road) over Hughes Creek and Cotaco Creek (Site 2 and Site 3) and on CR-1252 (Lockhart Road) over Shoal Creek (Site 4). Length 0.179 mi.

The Bracket Estimate on this project is from $111,520 to $136,302 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.HRRR-5519(250) ,PIKE COUNTY

Contract Time: 25 Working Days

for constructing the Guardrail Installations on CR-1165 over Youngblood Creek (Site 1); on CR-3339 over Whitewater Creek (Site 2); on CR-5534 over an unnamed creek (Site 3); and on CR-1111 over Beeman Creek (Site 4). Length 0.279 mi.

The Bracket Estimate on this project is from $170,235 to $208,065 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.IM-I059(420) ,GREENE COUNTY

Contract Time: 60 Working Days

for constructing the Partial Interchange Lighting on I-20/I-59 at SR-14 (Exit 40) in Eutaw. Length 0.833 mi.

The Bracket Estimate on this project is from $507,957 to $620,836 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.IM-I065(493) ,MONTGOMERY COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from the Fairview Avenue Interchange to the Alabama River Bridge in Montgomery. Length 1.999 mi.

The Bracket Estimate on this project is from $2,619,130 to $3,201,159 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.NH-0003(625) ,MORGAN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the intersection of SR-36 in Hartselle to just south of the Flint Creek Bridges (MP 350.000). Length 3.693 mi.

The Bracket Estimate on this project is from $1,639,239 to $2,003,514 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.NH-0008(595) ,DALLAS COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-8 (US-80) (Eastbound Lane) from the Perry County Line to west of the Cahaba River Bridge (MP 73.765). Length 13.823 mi.

The Bracket Estimate on this project is from $2,902,729 to $3,547,779 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-0041(519) ,DALLAS COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-41 (US-80 Truck Route) from north of the Meridian and Bigbee Railroad (MP 122.813) to south of the junction of SR-14 (MP 127.446) in Selma. Length 4.632 mi.

The Bracket Estimate on this project is from $2,558,745 to $3,127,355 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.NH-0149(503) ,JEFFERSON COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-149 from the junction of Columbiana Road to the intersection of Wildwood Circle in Homewood. Length 1.150 mi.

The Bracket Estimate on this project is from $1,757,279 to $2,147,786 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.NH-0157(526) ,LAWRENCE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-157 from just south of the junction of Byler Road to just south of the junction of Gordon Drive in Molton. Length 2.773 mi.

The Bracket Estimate on this project is from $1,475,628 to $1,803,545 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.NH-HSIP-0003(624) ,CONECUH COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-3 (US-31) from the junction of SR-12 (US-84) to the CSX Railroad Overpass Bridge. Length 3.017 mi.

The Bracket Estimate on this project is from $1,071,520 to $1,309,636 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.BR-0618(251) ,BULLOCK COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:10.00

for constructing the Bridge Scour Countermeasure and Guardrail Installations on CR-165 over Williams Creek (Site 1) and over Old Town Creek (Site 2). Length 0.141 mi.

The Bracket Estimate on this project is from $276,978 to $338,529 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.BRZ-0518(251) ,BLOUNT COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on CR-22 (Deans Ferry Road) over the CSX Railroad south of Hayden. Length 0.092 mi.

The Bracket Estimate on this project is from $881,586 to $1,077,494 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.RABRZ-1317(250) ,CLARKE COUNTY

Contract Time: 80 Working Days

for constructing the Bridge Replacement and Approaches on CR-21 over Satilpa Creek Relief east of Coffeeville. Length 0.103 mi.

The Bracket Estimate on this project is from $860,786 to $1,052,072 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.RABRZ-1514(251) ,CLEBURNE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:2.00

for constructing the Bridge Replacement and Approaches on CR-50 over Muscadine Creek. Length 0.075 mi.

The Bracket Estimate on this project is from $498,630 to $609,437 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPNU-1219(251) ,CHOCTAW COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-9 from the junction of Bonner Town Road to the junction of Melvin Cutoff Road southwest of Needham. Length 3.294 mi.

The Bracket Estimate on this project is from $647,451 to $791,329 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.RASTPNU-3218(251) ,GREENE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-60 from the intersection of CR-191 to the Tuscaloosa County Line. Length 2.800 mi.

The Bracket Estimate on this project is from $464,784 to $568,069 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPNU-3619(251) ,JACKSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on CR-61 from the junction of CR-58 in Pisgah to the intersection of SR-71. Length 2.246 mi.

The Bracket Estimate on this project is from $471,242 to $575,962 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.RASTPNU-4318(250) ,LOWNDES COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-37 from the intersection of SR-97 north of Letohatchee to the junction of SR-8 (US-80). Length 9.918 mi.

The Bracket Estimate on this project is from $1,141,994 to $1,395,770 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.RASTPNU-5018(251) & IAR-050-000-011 ,MONROE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-39 from the intersection of SR-12 (US-84) to the junction of the Alabama River Cellulose, LLC entrance (Gate 4). Length 3.446 mi.

The Bracket Estimate on this project is from $1,572,123 to $1,921,484 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPNU-6616(251) ,WILCOX COUNTY

Contract Time: 30 Working Days

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-22 from the junction of SR-221 to the intersection of SR-10 in Camden. Length 1.300 mi.

The Bracket Estimate on this project is from $335,974 to $410,634 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPOA-4818(251) ,MARSHALL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on Martling Gap Road from the junction of Gilliland Road to the intersection of Martling Road east of Guntersville. Length 1.811 mi.

The Bracket Estimate on this project is from $367,232 to $448,839 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-0003(623) ,BALDWIN COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of Crosby Road in Bay Minette to the Escambia County Line. Length 11.308 mi.

The Bracket Estimate on this project is from $1,982,091 to $2,422,555 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-0015(534) & STPAA-HSIP-0015(536) ,ESCAMBIA COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-15 (US-29) from the junction of Finlay Lane to the Covington County Line. Length 18.720 mi.

The Bracket Estimate on this project is from $2,962,024 to $3,620,251 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-0021(569) ,MONROE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from the junction of Hooks Road to the junction of Rumbley Road in Monroeville. Length 2.463 mi.

The Bracket Estimate on this project is from $841,175 to $1,028,103 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPAA-0047(506) ,MONROE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-47 from the junction of SR-12 (US-84) to the junction of SR-41 in Monroeville. Length 5.214 mi.

The Bracket Estimate on this project is from $1,024,592 to $1,252,279 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-0049(513) ,CLAY AND CLEBURNE COUNTIES

Contract Time: 30 Working Days

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on SR-49 from 0.250 mile north of the junction of Carver Street in Lineville to the junction of SR-281. Length 12.984 mi.

The Bracket Estimate on this project is from $1,100,085 to $1,344,549 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.STPAA-0075(538) ,BLOUNT COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-75 from a point north of the junction of CR-39 to the intersection of SR-74 (US-278) in Snead. Length 10.844 mi.

The Bracket Estimate on this project is from $3,098,008 to $3,786,455 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


71.STPAA-0087(514) & STPNU-0167(512) ,PIKE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-87 from the junction of SR-167 in Springhill to the junction of CR-3304/CR-59 (Site 1) and on SR-167 from the Coffee County Line to the junction of SR-87 in Springhill (Site 2). Length 9.639 mi.

The Bracket Estimate on this project is from $3,613,695 to $4,416,738 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


73.STPAA-0069(560) ,CULLMAN COUNTY

Contract Time: 11/20/2020 Completion Date

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-69 from 0.400 mile south of the intersection of CR-112 near Bremen to north of the I-65 Interchange in Dodge City. Length 8.340 mi.

The Bracket Estimate on this project is from $2,148,562 to $2,626,020 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPAA-HSIP-0003(620) ,JEFFERSON COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.200 mile north of the intersection of Finley Boulevard to a point near the junction of 52nd Avenue North in Birmingham. Length 2.325 mi.

The Bracket Estimate on this project is from $2,050,663 to $2,506,366 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


78.STPAA-HSIP-0017(579) ,PICKENS COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-17 from just north of the junction of 8th Avenue in Reform to south of the junction of Beaver Creek Road. Length 5.251 mi.

The Bracket Estimate on this project is from $2,172,254 to $2,654,977 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPAA-HSIP-0022(532) & STPAA-HSIP-0049(514) ,TALLAPOOSA COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-22 from 0.550 mile south of Hillabee Creek (MP 122.437) to the junction of SR-49 in New Site (Site 1) and on SR-49 from the junction of SR-22 in New Site to the Clay County Line (Site 2). Length 12.768 mi.

The Bracket Estimate on this project is from $3,054,550 to $3,733,339 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPAA-HSIP-0069(563) ,HALE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-69 from 0.610 mile south of the junction of CR-32 to the junction of SR-60 northwest Havana. Length 8.038 mi.

The Bracket Estimate on this project is from $2,464,668 to $3,012,372 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


81.STPAA-HSIP-0223(505) ,BULLOCK COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-223 from the Pike County Line to 0.570 mile south of the junction of CR-28 (MP 15.500). Length 3.819 mi.

The Bracket Estimate on this project is from $892,580 to $1,090,931 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


83.STPOA-0819(250) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing and Traffic Stripe on the Alexandria-Jacksonville Highway from the intersection of Cedar Springs Road to the Jacksonville City Limits. Length 3.787 mi.

The Bracket Estimate on this project is from $549,105 to $671,128 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


88.STPPC-4118(252) ,LEE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Full Depth Reclamation), Guardrail Installation, and Traffic Stripe on CR-197 from the junction of CR-208 to the junction of CR-240 southwest of Smith Station. Length 2.364 mi.

The Bracket Estimate on this project is from $925,827 to $1,131,567 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


94.99-810-690-000-803 ,WALKER COUNTY

Contract Time: 60 Working Days

for the Maintenance Bridge Painting on SR-5 over Blackwater Creek; on SR-13 over the BNSF Railroad; on SR-69 over the BNSF Railroad; on SR-269 over the Norfolk Southern Railroad; and on SR-269 over the BNSF Railroad.

The Bracket Estimate on this project is from $168,216 to $205,598 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)