May 29, 2020, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. BR-0002(529), COLBERT 2. BR-0003(591), MORGAN
3. BR-0010(545), HENRY 6. FLAP-STPNU-FLAP(027), BIBB
9. HRRR-0719(250), BUTLER 12. HSIP-0008(594), MARENGO
13. HSIP-0147(503), LEE 14. HSIP-STPOA-0016(524), BALDWIN
17. IM-HSIP-I022(311), MARION 20. IM-I010(345), MOBILE
21. IM-I065(492), LIMESTONE 22. IM-I065(507), MONTGOMERY
24. IM-IMGR-I022(313), WALKER 26. IM-NH-I065(510), SHELBY
29. NH-0005(559), WALKER 30. NH-0020(531), LIMESTONE
33. NH-FMGR-0001(613), CALHOUN 35. NH-HSIP-0006(578), TUSCALOOSA
36. NH-HSIP-0006(579), TUSCALOOSA 40. RASTPNU-3318(251), HALE
41. RASTPNU-4119(252), LEE 42. RASTPNU-4218(250), LIMESTONE
45. RASTPOA-6116(253), TALLADEGA 48. STPAA-0068(508), DEKALB
50. STPAA-FMGR-0021(570), LOWNDES 52. STPAA-HSIP-0003(627), CHILTON
53. STPAA-HSIP-0017(581), PICKENS *54. STPAA-HSIP-0097(508), LOWNDES
55. STPAA-HSIP-0171(517), FAYETTE 56. STPAA-HSIP-0241(503), MARION
59. STPMN-0118(252), AUTAUGA 60. STPMN-2620(250), ELMORE
63. STPNU-3620(250), JACKSON 66. STPOA-0021(516), ETC., CALHOUN
67. STPOA-3519(253), HOUSTON 68. STPOA-3519(252), HOUSTON
71. STPPC-4119(253), LEE
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BR-0002(529) ,COLBERT COUNTY

Contract Time: 245 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-2 (US-43/US-72) over Ashe Boulevard in Sheffield. Length 0.287 mi.

The Bracket Estimate on this project is from $4,513,582 to $5,516,600 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


2.BR-0003(591) ,MORGAN COUNTY

Contract Time: 210 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement on SR-3 (US-31/Southbound Lane) over Cedar Creek southeast of Hartselle. Length 0.643 mi.

The Bracket Estimate on this project is from $3,339,410 to $4,081,502 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $39.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.BR-0010(545) ,HENRY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:5.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-10 over McRae Mill Creek (MP 228.686). Length 0.567 mi.

The Bracket Estimate on this project is from $2,785,896 to $3,404,984 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


6.FLAP-STPNU-FLAP(027) ,BIBB COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Full Depth Reclamation, Resurfacing, Guardrail Installation, and Traffic Stripe on CR-51 from the Perry County Line to the junction of SR-219 south of Centreville. Length 6.378 mi.

The Bracket Estimate on this project is from $936,431 to $1,144,527 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.HRRR-0719(250) ,BUTLER COUNTY

Contract Time: 15 Working Days

for constructing the Guardrail Installations on CR-16 over Rocky Creek (Site 1) and on CR-16 over Persimmon Creek Relief (Site 2). Length 0.088 mi.

The Bracket Estimate on this project is from $81,392 to $99,479 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.HSIP-0008(594) ,MARENGO COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:7.00

for constructing the Restricted Crossing U-Turn Intersection on SR-8 (US-80) at SR-25 north of Faunsdale. Length 0.596 mi.

The Bracket Estimate on this project is from $1,514,606 to $1,851,186 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.HSIP-0147(503) ,LEE COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:8.00

for constructing the Roundabout (Grading, Drainage, Pavement, Lighting, and Striping) on SR-147 (North College Street) at the intersection of CR-72 (Farmville Road) in Auburn. Length 0.256 mi.

The Bracket Estimate on this project is from $1,995,646 to $2,439,122 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $37.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.HSIP-STPOA-0016(524) ,BALDWIN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:6.00

for constructing the Intersection Relocation and Traffic Signal Installation (Grading, Drainage, Pavement, and Signalization) on SR-16 (US-90) at SR-59 in Loxley. Length 0.337 mi.

The Bracket Estimate on this project is from $1,438,788 to $1,758,519 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.IM-HSIP-I022(311) ,MARION COUNTY

Contract Time: 150 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Widening, Guardrail Steel Blockout Replacement, and Traffic Stripe on I-22 from MP 22.600 (Exit 22) to MP 29.950 (Exit 30). Length 7.334 mi.

The Bracket Estimate on this project is from $10,809,611 to $13,211,747 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.IM-I010(345) ,MOBILE COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat), and Traffic Stripe on I-10 from 0.280 mile west of the Carol Plantation Road Overpass in Theodore to 1.360 miles east of the of the SR-193 Overpass in Mobile. Length 3.892 mi.

The Bracket Estimate on this project is from $3,068,532 to $3,750,429 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.IM-I065(492) ,LIMESTONE COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on I-65 from 0.200 mile north of the SR-2 (US-72) Interchange in Athens to 1.000 mile south of the CSXT Railroad Overpass to include the Bridge Raising on Black Road and Wales Street. Length 7.569 mi.

The Bracket Estimate on this project is from $8,456,362 to $10,335,554 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $38.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.IM-I065(507) ,MONTGOMERY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Pavement Preservation (Micro-Milling, Resurfacing, and Traffic Stripe) on I-65 from a point north of the Alabama River Bridge (MP 172.550) to the Elmore County Line. Length 4.649 mi.

The Bracket Estimate on this project is from $1,273,327 to $1,556,288 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.IM-IMGR-I022(313) ,WALKER COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, Scrub Seal, Guardrail Reset, and Traffic Stripe on I-22 from 0.800 mile east of the CR-61 Overpass to the Jefferson County Line. Length 7.590 mi.

The Bracket Estimate on this project is from $6,758,336 to $8,260,188 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.IM-NH-I065(510) ,SHELBY COUNTY

Contract Time: 105 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from the CR-52 Overpass in Pelham to a point south of the Cahaba River Bridge. Length 6.589 mi.

The Bracket Estimate on this project is from $5,395,216 to $6,594,153 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $20.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-0005(559) ,WALKER COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-5 from the East City Limits of Jasper to the 9th Avenue Overpass. Length 4.452 mi.

The Bracket Estimate on this project is from $3,357,457 to $4,103,559 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-0020(531) ,LIMESTONE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-20 (US-72A) from 0.330 mile west of the junction of SR-3 (US-31) at MP 70.750 to 0.540 mile west of the I-65 Interchange at MP 73.480 in Decatur. Length 2.707 mi.

The Bracket Estimate on this project is from $1,051,849 to $1,285,593 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.NH-FMGR-0001(613) ,CALHOUN COUNTY

Contract Time: 190 Working Days

DBE Goal Percent:4.00

for constructing the Access Management, Micro-Milling, Resurfacing, Guardrail Installation, Bridge Rail Retrofit, and Traffic Stripe on SR-1 (US-431) from a point north of the SR-1 (US-431) Bypass (MP 233.243) in Saks to 0.116 mile north of the junction of SR-144 in Alexandria. Length 7.253 mi.

The Bracket Estimate on this project is from $6,639,790 to $8,115,299 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $87.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.NH-HSIP-0006(578) ,TUSCALOOSA COUNTY

Contract Time: 135 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from the junction of Greenwood Circle to the intersection of Duncanville Middle School Road. Length 5.343 mi.

The Bracket Estimate on this project is from $5,816,001 to $7,108,446 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $22.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.NH-HSIP-0006(579) ,TUSCALOOSA COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from 1.000 mile east of the junction of Midway Drive to the Bibb County Line. Length 4.662 mi.

The Bracket Estimate on this project is from $4,301,925 to $5,257,909 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.RASTPNU-3318(251) ,HALE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Widening, Resurfacing, and Traffic Stripe on CR-44 from the junction of SR-69 to the junction of CR-50 southwest of Moundville. Length 4.746mi.

The Bracket Estimate on this project is from $842,429 to $1,029,636 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.RASTPNU-4119(252) ,LEE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-188 from the intersection of SR-14 to Sougahatchee Creek north of Loachapoka. Length 2.693 mi.

The Bracket Estimate on this project is from $669,173 to $817,878 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.RASTPNU-4218(250) ,LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Resurfacing and Traffic Stripe on Shaw Road from a point 0.913 mile north of the junction of Nuclear Plant Road to the junction of SR-2 (US-72). Length 5.144 mi.

The Bracket Estimate on this project is from $399,574 to $488,368 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.RASTPOA-6116(253) ,TALLADEGA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on CR-175 (Oakdale Road) from the junction of SR-21 northwest of Sycamore to the junction of SR-76 northeast of Childersburg. Length 5.589 mi.

The Bracket Estimate on this project is from $843,037 to $1,030,378 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-0068(508) ,DEKALB AND MARSHALL COUNTIES

Contract Time: 65 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing and Access Management on SR-68 from the junction of SR-75 (MP 0.000) to west of the junction of Juanita Drive in Crossville (MP 9.020). Length 9.020 mi.

The Bracket Estimate on this project is from $2,036,407 to $2,488,942 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-FMGR-0021(570) ,LOWNDES COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Guardrail Reset, Bridge Guardrail Retrofit, and Traffic Stripe on SR-21 from the Wilcox County Line to 0.500 mile south of the junction of CR-45. Length 10.940 mi.

The Bracket Estimate on this project is from $2,442,470 to $2,985,241 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-HSIP-0003(627) ,CHILTON COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the North City Limits of Thorsby to the North City Limits of Jemison. Length 3.758 mi.

The Bracket Estimate on this project is from $1,429,152 to $1,746,741 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-HSIP-0017(581) ,PICKENS COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Resurfacing, Scrub Seal, and Traffic Stripe on SR-17 from the junction of Beaver Creek Road to the Lamar County Line. Length 5.266 mi.

The Bracket Estimate on this project is from $2,726,456 to $3,332,335 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-HSIP-0097(508) ,LOWNDES COUNTY

Contract Time: 35 Working Days

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-97 from the junction of SR-3 (US-31) to the I-65 Overpass southeast of Letohatchee. Length 4.174 mi.

The Bracket Estimate on this project is from $911,514 to $1,114,072 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

*****WITHDRAWN FROM THE LETTING*****

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0171(517) ,FAYETTE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-171 from the junction of Stough Road to the Marion County Line. Length 5.675 mi.

The Bracket Estimate on this project is from $2,391,849 to $2,923,371 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPAA-HSIP-0241(503) ,MARION COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-241 from the junction of SR-172 in Bear Creek to the Franklin County Line. Length 1.955 mi.

The Bracket Estimate on this project is from $918,962 to $1,123,176 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPMN-0118(252) ,AUTAUGA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Resurfacing and Traffic Stripe on Upper Kingston Road from the junction of 7th Street to the North City Limits of Prattville (Site 1) and the Planing, Widening, Resurfacing, and Traffic Stripe on Martin Luther King, Jr. Drive from the junction of 7th Street to the junction of Powell Road in Prattville (Site 2). Length 3.916 mi.

The Bracket Estimate on this project is from $848,123 to $1,036,595 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPMN-2620(250) ,ELMORE COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on Laurel Creek Road from the junction of SR-21 (US-231) to the junction of Rea Road (Site 1) and on Rea Road from the junction of Laurel Creek Road to the junction of Weoka Road north of Wetumpka (Site 2). Length 2.872 mi.

The Bracket Estimate on this project is from $338,861 to $414,163 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPNU-3620(250) ,JACKSON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on CR-90 from the junction of SR-73 to the Georgia State Line. Length 1.875 mi.

The Bracket Estimate on this project is from $405,574 to $495,702 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPOA-0021(516) & STPOA-0021(543) ,CALHOUN COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Traffic Signal Upgrade (Grading, Drainage, Pavement, Trafific Signs, Traffic Signals and Traffic Stripe) on SR-21 at Baltzell Gate Road in Anniston (Site 1) and Traffic Signal Improvements on SR 21 at the intersection of Lenlock Lane in Anniston (Site 2). Length 0.142 mi.

The Bracket Estimate on this project is from $497,198 to $607,687 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPOA-3519(253) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on North Broad Street from the intersection of SR-12 (US-84) to the junction of Omussee Road (Site 1) and on Omussee Road from the junction of North Broad Street to the intersection of SR-52 (Columbia Highway) (Site 2). Length 3.277 mi.

The Bracket Estimate on this project is from $542,003 to $662,448 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPOA-3519(252) ,HOUSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Resurfacing and Traffic Stripe on South Park Avenue from the intersection of Taylor Road to Ross Clark Circle in Dothan. Length 1.051 mi.

The Bracket Estimate on this project is from $256,006 to $312,896 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPPC-4119(253) ,LEE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-243 from the Russell County Line to the intersection of CR-248 in Smiths Station. Length 2.621 mi.

The Bracket Estimate on this project is from $615,362 to $752,109 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items