February 26, 2021, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

7. NHF-0042(535), MOBILE *10. STPBHF-STPAAF-7026(601), JEFFERSON
15. BR-0014(521), PICKENS *18. HPP-TAPBH-CMAQ-A104(916), JEFFERSON
24. HSIP-I059(413), TUSCALOOSA 27. IM-IMGR-I065(504), CONECUH
30. NH-0001(619), LEE 31. NH-0002(591), JACKSON
32. NH-0002(592), LAUDERDALE 33. NH-0003(632), ETC., MORGAN
34. NH-0021(572), TALLADEGA 35. NH-0215(505), TUSCALOOSA
38. NH-HSIP-0001(615), CHAMBERS 39. NH-HSIP-0001(616), HENRY
40. NH-HSIP-0003(633), BALDWIN 43. RASTPNU-6620(250), WILCOX
49. STPAA-0068(509), DEKALB 50. STPAA-0075(539), MARSHALL
51. STPAA-0099(507), LIMESTONE 52. STPAA-0132(503), BLOUNT
53. STPAA-0187(501), FRANKLIN 54. STPAA-0277(500), JACKSON
57. STPAA-FMGR-0050(507), CHAMBERS 60. STPAA-HSIP-0004(550), CLEBURNE
61. STPAA-HSIP-0004(551), CALHOUN 62. STPAA-HSIP-0010(551), WILCOX
63. STPAA-HSIP-0014(547), TALLAPOOSA 64. STPAA-HSIP-0016(528), BALDWIN
65. STPAA-HSIP-0069(565), CLARKE 66. STPAA-HSIP-0241(504), MARION
67. STPAA-HSIP-0259(502), COOSA 68. STPAA-HSIP-0302(500), COFFEE
71. STPAA-HSIP-FMGR-0075(540), BLOUNT 72. STPAA-HSIP-FMGR-0154(506), CLARKE
75. STPBH-CMAQ-5915(250), SHELBY 79. STPMN-5118(255), MONTGOMERY
80. STPMN-5120(250), MONTGOMERY 86. ATRP2-16-2020-016, COFFEE
89. RACR-001-006-001, AUTAUGA 92. ST-063-007-009, TUSCALOOSA
*- WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


7.NHF-0042(535) ,MOBILE COUNTY

Contract Time: 320 Working Days

DBE Goal Percent:3.00

for constructing the Bridge (Grading, Drainage, Pavement and Bridge) on CR-63 (Wilmer-Georgetown Road) over Future SR-42 (US-98) with a Jughandle Interchange onto Future SR-42 (US-98) southwest of Wilmer. Length 0.530 mi.

The Bracket Estimate on this project is from $8,793,150 to $10,747,183 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $48.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.STPBHF-STPAAF-7026(601) ,JEFFERSON COUNTY

Contract Time: 6/15/2022 Completion Date

DBE Goal Percent:4.00

for constructing the Interchange Modifications (Grading, Drainage, Pavement, Retaining Walls,Traffic Signs,Traffic Signals, and Traffic Stripe) on SR-149 (Lakeshore Parkway) at the I-65 Interchange in Homewood. Length 0.794 mi.

The Bracket Estimate on this project is from $12,213,986 to $14,928,205 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $118.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


15.BR-0014(521) ,PICKENS COUNTY

Contract Time: 200 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-14 over Lubbub Creek southeast of Aliceville. Length 0.832 mi.

The Bracket Estimate on this project is from $11,158,289 to $13,637,909 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $47.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.HPP-TAPBH-CMAQ-A104(916) ,JEFFERSON COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:1.00

for constructing the Pedestrian Bridge and Sidewalks over SR-3 (US-31) near Wald Park in Vestavia Hills. Length 0.104 mi.

The Bracket Estimate on this project is from $2,124,897 to $2,597,096 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Thursday, February 18, 2021, at the Virtual Meeting Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

****ALL BIDS REJECTED****

Return To: Proposal Letting List (Top of web page)


24.HSIP-I059(413) ,TUSCALOOSA AND GREENE COUNTIES

Contract Time: 60 Working Days

for constructing the Cable Guiderail Installation at various locations on I-59 from a point southwest of the Greene County Line (MP 55.209) to 0.250 mile south of the 3rd Avenue East Overpass in Tuscaloosa. Length 17.045 mi.

The Bracket Estimate on this project is from $735,332 to $898,739 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.IM-IMGR-I065(504) ,CONECUH COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from the CR-6 Overpass to 0.500 mile south of the junction of SR-12 (US-84) southwest of Evergreen. Length 9.420 mi.

The Bracket Estimate on this project is from $3,602,180 to $4,402,664 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-0001(619) ,LEE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-1 (US-431) from 0.380 mile south of the junction of CR-287 to 0.370 mile south of the junction of CR-253 east of Salem. Length 5.237 mi.

The Bracket Estimate on this project is from $3,643,030 to $4,452,592 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.NH-0002(591) ,JACKSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-2 (US-72) from the east end of the Crow Creek Bridge (MP 154.79) to a point west of the SR-277 Overpass (MP 158.62) in Stevenson. Length 3.830 mi.

The Bracket Estimate on this project is from $3,522,774 to $4,305,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.NH-0002(592) ,LAUDERDALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-2 (US-72) from the junction of CR-63 (MP 40.906) to the junction of CR-66 (MP 42.586) in Killen. Length 1.679 mi.

The Bracket Estimate on this project is from $916,683 to $1,120,390 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.NH-0003(632) & NH-0003(637) ,MORGAN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of Atkeson Drive Southeast in Decatur to the Tennessee River Bridge (MP 358.394). Length 5.964 mi.

The Bracket Estimate on this project is from $3,844,925 to $4,699,353 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.NH-0021(572) ,TALLADEGA COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-21 from 0.190 mile south of the junction of CR-238 north of Winterboro to 0.340 mile north of the junction of Maine Street. Length 3.298 mi.

The Bracket Estimate on this project is from $1,697,992 to $2,075,324 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.NH-0215(505) ,TUSCALOOSA COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Traffic Signals, Traffic Signs, and Traffic Stripe on SR-215 (15th Street) from the intersection of Greensboro Avenue to just west of the junction of Dr. Edward Hillard Drive in Tuscaloosa. Length 2.010 mi.

The Bracket Estimate on this project is from $2,424,051 to $2,962,729 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $14.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.NH-HSIP-0001(615) ,CHAMBERS COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-1 (US-431) from 0.230 mile north of the junction of SR-147 to 0.380 mile south of the junction of SR-50 in Lafayette. Length 8.297 mi.

The Bracket Estimate on this project is from $2,035,422 to $2,487,738 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.NH-HSIP-0001(616) ,HENRY COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, Guardrail Reset, and Traffic Stripe on SR-1 (US-431) from the junction of CR-42 to the Barbour County Line. Length 12.468 mi.

The Bracket Estimate on this project is from $5,225,196 to $6,386,350 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.NH-HSIP-0003(633) ,BALDWIN COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-3 (US-31) from the junction of Church Street in Stapleton to the South City Limits of Bay Minette. Length 7.380 mi.

The Bracket Estimate on this project is from $3,015,579 to $3,685,708 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.RASTPNU-6620(250) ,WILCOX COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-6 from the junction of SR-41 to the Monroe County Line. Length 2.868 mi.

The Bracket Estimate on this project is from $448,006 to $547,563 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-0068(509) ,DEKALB COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-68 in Collinsville from the junction of SR-7 (US-11) to the Cherokee County Line. Length 2.379 mi.

The Bracket Estimate on this project is from $667,632 to $815,995 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0075(539) ,MARSHALL COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-75 from the Blount County Line to the junction of Timber Lane in Albertville. Length 10.339 mi.

The Bracket Estimate on this project is from $1,728,984 to $2,113,203 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-0099(507) ,LIMESTONE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-99 from the junction of SR-3 (US-31) to the junction of Market Street West in Athens. Length 3.465 mi.

The Bracket Estimate on this project is from $989,993 to $1,209,991 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.STPAA-0132(503) ,BLOUNT COUNTY

Contract Time: 30 Working Days

for constructing the Resurfacing (Scrub Seal) and Traffic Stripe on SR-132 from the junction of SR-75 in Oneonta to the Etowah County Line. Length 9.736 mi.

The Bracket Estimate on this project is from $839,865 to $1,026,501 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPAA-0187(501) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-187 from the Marion County Line to the intersection of SR-172 in Hodges. Length 1.118 mi.

The Bracket Estimate on this project is from $319,046 to $389,945 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPAA-0277(500) ,JACKSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Resurfacing, Guardrail Reset, and Traffic Stripe on SR-277 from 0.340 mile south of the junction of SR-2 (US-72) in Stevenson to the junction of SR-2 (US-72) in Bridgeport. Length 8.849 mi.

The Bracket Estimate on this project is from $1,861,521 to $2,275,192 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-FMGR-0050(507) ,CHAMBERS COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat), Guardrail Installation, and Traffic Stripe on SR-50 from the junction of CR-208 in Huguley to the junction of SR-15 (US-29). Length 2.581 mi.

The Bracket Estimate on this project is from $745,200 to $910,799 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0004(550) ,CLEBURNE COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Retrofit, and Traffic Stripe on SR-4 (US-78) from 0.230 mile south of the junction of CR-61 in Edwardsville to the Georgia State Line. Length 8.953 mi.

The Bracket Estimate on this project is from $2,442,283 to $2,985,013 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPAA-HSIP-0004(551) ,CALHOUN COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-4 (US-78) from 0.150 mile east of the junction of CR-202 to the intersection of SR-21 in Oxford. Length 5.757 mi.

The Bracket Estimate on this project is from $2,347,590 to $2,869,276 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


62.STPAA-HSIP-0010(551) ,WILCOX COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), and Traffic Stripe on SR-10 from 0.740 mile east of the junction of Woodbine Lane to east of the Sturdivant Creek Bridge southeast of Pine Apple. Length 14.202 mi.

The Bracket Estimate on this project is from $3,163,043 to $3,865,942 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


63.STPAA-HSIP-0014(547) ,TALLAPOOSA COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Retofit, and Traffic Stripe on SR-14 from the Elmore County Line to the junction of Cannon Road in Tallassee. Length 3.239 mi.

The Bracket Estimate on this project is from $1,163,209 to $1,421,700 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.STPAA-HSIP-0016(528) ,BALDWIN COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:2.00

for constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-16 (US-90) from 0.190 mile east of the Tensaw River Bridge to east of the Blakeley River Bridge in Spanish Fort. Length 4.615 mi.

The Bracket Estimate on this project is from $2,763,523 to $3,377,639 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


65.STPAA-HSIP-0069(565) ,CLARKE COUNTY

Contract Time: 30 Working Days

for constructing the Safety Widening, Resurfacing (Micro-Surfacing Seal Coat and Scrub Seal), and Traffic Stripe on SR-69 from 0.710 mile south of the junction of Trawick Creek Road to the Marengo County Line. Length 3.303 mi.

The Bracket Estimate on this project is from $722,027 to $882,477 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


66.STPAA-HSIP-0241(504) ,MARION COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Planing, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-241 from the junction of SR-74 (US-278) to 0.300 mile south of the junction of CR-143 south of Bear Creek. Length 0.794 mi.

The Bracket Estimate on this project is from $3,238,685 to $3,958,392 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


67.STPAA-HSIP-0259(502) ,COOSA AND TALLAPOOSA COUNTIES

Contract Time: 105 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-259 from the junction of SR-9 in Equality to the junction of SR-22 in Alexander City. Length 12.798 mi.

The Bracket Estimate on this project is from $3,510,645 to $4,290,788 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


68.STPAA-HSIP-0302(500) ,COFFEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-302 (West McKinnon Street) from the junction of SR-12 (US-84) to the intersection of SR-122 in New Brockton. Length 2.310 mi.

The Bracket Estimate on this project is from $820,167 to $1,002,427 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


71.STPAA-HSIP-FMGR-0075(540) ,BLOUNT COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:9.00

for constructing the Surface Treatment (Micro-Surfacing Seal Coat, Type III), Safety Improvements (Guardrail), and Traffic Stripe on SR-75 from the Jefferson County Line to the south end of the Blackburn Fork Relief Bridge (MP 20.670) northeast of Remlap. Length 7.155 mi.

The Bracket Estimate on this project is from $1,361,966 to $1,664,625 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


72.STPAA-HSIP-FMGR-0154(506) ,CLARKE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Resurfacing, and Traffic Stripe on SR-154 from the junction of SR-69 to Harris Creek northwest of Coffeeville. Length 5.992 mi.

The Bracket Estimate on this project is from $998,234 to $1,220,064 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


75.STPBH-CMAQ-5915(250) ,SHELBY COUNTY

Contract Time: 210 Working Days

DBE Goal Percent:10.00

for constructing the Safety and Intersections Improvements (Grading, Drainage, Pavement, Roundabout Installation, Bike Lanes, and Lighting) on State Park Road from the junction of John Findlay Drive to the junction of SR-119 in Pelham. Length 1.855 mi.

The Bracket Estimate on this project is from $4,907,542 to $5,998,107 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $66.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


79.STPMN-5118(255) ,MONTGOMERY COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:2.00

for constructing the Widening, Resurfacing,Traffic Signal Improvements, and Traffic Stripe on CR-54 (Hunter Loop Road) from the junction of SR-3 (US-31) to the junction of Old Selma Road. Length 3.720 mi.

The Bracket Estimate on this project is from $2,473,265 to $3,022,880 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


80.STPMN-5120(250) ,MONTGOMERY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:7.00

for constructing the Plaining, Resurfacing, and Traffic Stripe on CR-39 (Woodley Road) from the junction of CR-39 (Mount Zion Road) to the Montgomery City Limits. Length 5.042 mi.

The Bracket Estimate on this project is from $1,061,242 to $1,297,073 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


86.ATRP2-16-2020-016 ,COFFEE COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:1.00

for constructing the Intersection Improvements on CR-239 and CR-114 to intersect SR-167 south of New Brockton. Length 0.715 mi.

The Bracket Estimate on this project is from $995,477 to $1,216,694 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $25.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


89.RACR-001-006-001 ,AUTAUGA COUNTY

Contract Time: 250 Working Days

DBE Goal Percent:4.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Bridges, Traffic Signs, and Traffic Stripe) on SR-6 (US-82) from the junction of SR-14 to the intersection of SR-31 (US-31) in Prattville. Length 2.311 mi.

The Bracket Estimate on this project is from $12,444,209 to $15,209,589 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $100.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


92.ST-063-007-009 ,TUSCALOOSA AND BIBB COUNTIES

Contract Time: 80 Working Days

for constructing the Additional Lanes on SR-7 (US-11) from the junction of Diamler-Benz Boulevard to the intersection of SR-5 in Vance.

The Bracket Estimate on this project is from $351,868 to $430,061 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)