1. FLAP-STPNU-FLAP(029), WINSTON *3. STPBHF-STPAAF-7026(601), JEFFERSON
4. BR-0018(505), FAYETTE 7. HSIP-2616(250), ELMORE
8. HSIP-MR20(902), GREENE 9. HSIP-MR20(903), PICKENS
12. IM-HSIP-I059(411), ST. CLAIR 15. IM-I010(348), MOBILE
**16. IM-I065(496), LIMESTONE 17. IM-I085(368), MACON
18. IM-I565(316), MADISON 21. NH-0003(639), LIMESTONE
22. NH-0008(599), SUMTER 23. NH-0013(617), CLARKE
24. NH-0053(589), MONTGOMERY 27. NH-HSIP-0003(635), BALDWIN
28. NH-HSIP-0003(638), AUTAUGA 29. NH-HSIP-0006(580), TUSCALOOSA
32. RASTPAA-4915(251), MOBILE 35. RP-NH-0005(561), JEFFERSON
37. RP-STPAA-HSIP-FMGR-0009(578), CALHOUN 40. STPAA-0003(636), CONECUH
41. STPAA-0033(508), LAWRENCE 43. STPAA-0145(507), CHILTON
44. STPAA-0167(515), GENEVA 47. STPAA-HSIP-0005(563), WALKER
49. STPAA-HSIP-0041(521), MONROE 51. STPAA-HSIP-FMGR-0175(501), PERRY
54. STPMN-2615(262), ETC., ELMORE **59. STPOA-0815(263), CALHOUN
60. STPOA-0820(250), CALHOUN 61. STPOA-I085(371), LEE
64. ATRP2-02-2020-204, BALDWIN 70. 99-408-663-265-005, WILCOX
*-WITHDRAWN FROM THE LETTING
**-ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.FLAP-STPNU-FLAP(029) ,WINSTON COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on CR-2 (Forest Highway 5) from the junction of SR-195 to the intersection of SR-33 north of Double Springs. Length 5.400 mi.

The Bracket Estimate on this project is from $398,472 to $487,021 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


3.STPBHF-STPAAF-7026(601) ,JEFFERSON COUNTY

Contract Time: 6/15/2022 Completion Date

DBE Goal Percent:4.00

for constructing the Interchange Modifications (Grading, Drainage, Pavement, Retaining Walls,Traffic Signs,Traffic Signals, and Traffic Stripe) on SR-149 (Lakeshore Parkway) at the I-65 Interchange in Homewood. Length 0.794 mi.

The Bracket Estimate on this project is from $12,213,986 to $14,928,205 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $118.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


4.BR-0018(505) ,FAYETTE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:4.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on SR-18 (US-43) over Deadwater Creek west of Bankston. Length 0.510 mi.

The Bracket Estimate on this project is from $3,264,332 to $3,989,739 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.HSIP-2616(250) ,ELMORE COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:7.00

for constructing the Roundabout Installation on CR-8 (Redland Road) at the intersection of CR-59 (Firetower Road/Dozier Road) southeast of Wetumpka. Length 0.163 mi.

The Bracket Estimate on this project is from $1,059,902 to $1,295,435 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $19.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


8.HSIP-MR20(902) ,GREENE, PERRY, AND SUMTER COUNTIES

Contract Time: 45 Working Days

for constructing the Road Safety Assessment Sites (Guardrail Installation) on SR-5, SR-7, and SR-13 at various locations in the West Central Region as indicated in the plans.

The Bracket Estimate on this project is from $444,994 to $543,881 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.HSIP-MR20(903) ,PICKENS, LAMAR, WALKER, AND WINSTON COUNTIES

Contract Time: 30 Working Days

for constructing the Roadway Safety Assessment Sites (Guardrail Installation) on SR-6, SR-13, SR-17, and SR-269 at various locations in the West Central Region as indicated in the plans.

The Bracket Estimate on this project is from $207,780 to $253,953 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.IM-HSIP-I059(411) ,ST. CLAIR COUNTY

Contract Time: 5/31/2022 Completion Date

DBE Goal Percent:1.00

for constructing the Pavement Rehabilitation (Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe) on I-59 from the Jefferson County Line to north of the SR-23 Overpass southeast of Springville. Length 8.655 mi.

The Bracket Estimate on this project is from $15,239,603 to $18,626,182 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.IM-I010(348) ,MOBILE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on I-10 through the Wallace Tunnel in Mobile. Length 0.887 mi.

The Bracket Estimate on this project is from $1,302,003 to $1,591,337 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.IM-I065(496) ,LIMESTONE COUNTY

Contract Time: 9/2/2022 Completion Date

DBE Goal Percent:1.00

for constructing the Welcome Center Replacement (Grading, Drainage, Pavement, Building, and Lighting) on I-65 north of Athens. Length 0.839 mi.

The Bracket Estimate on this project is from $9,512,896 to $11,626,872 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $98.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Thursday, March 18, 2021, at the Alabama Department of Transportation; North Region Office; First Floor Conference Room; 1525 Perimeter Parkway; Huntsville, Al 35806 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

ALL BIDS REJECTED

Return To: Proposal Letting List (Top of web page)


17.IM-I085(368) ,MACON COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:6.00

for constructing the Pavement Preservation (Planing, Resurfacing, Guardrail Installation, and Traffic Stripe) on I-85 from the Montgomery County Line to the junction of SR-138. Length 2.860 mi.

The Bracket Estimate on this project is from $3,980,055 to $4,864,512 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.IM-I565(316) ,MADISON COUNTY

Contract Time: 250 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-565 from 0.280 mile east of the Intergraph Way Underpass (MP 10.100) to 0.260 mile east of the Triana Boulevard Overpass (MP 18.322) in Huntsville. Length 8.231 mi.

The Bracket Estimate on this project is from $14,249,080 to $17,415,543 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.NH-0003(639) ,LIMESTONE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of SR-2 (US-72) to the I-65 Underpass in Athens. Length 2.693 mi.

The Bracket Estimate on this project is from $1,717,167 to $2,098,760 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.NH-0008(599) ,SUMTER COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-8 (US-80) from west of the junction of SR-28 (MP 20.000) to a point east of the Rooster Bridge (MP 23.983). Length 3.983 mi.

The Bracket Estimate on this project is from $3,900,010 to $4,766,679 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.NH-0013(617) ,CLARKE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the north end of the Bassetts Creek Bridge (MP 87.690) to north of the junction of SR-5 (MP 93.120) in Thomasville. Length 5.430 mi.

The Bracket Estimate on this project is from $2,203,785 to $2,693,515 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.NH-0053(589) ,MONTGOMERY COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-53 (US-231) from the junction of CR-89 in Pine Level to the junction of Athey Road. Length 4.711 mi.

The Bracket Estimate on this project is from $5,196,398 to $6,351,153 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.NH-HSIP-0003(635) ,BALDWIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe on SR-3 (US-31) from a point south of the Bay Minette City Limits (MP 17.489) to the junction of West Pine Street to include Intersection Improvements at SR-59. Length 3.569 mi.

The Bracket Estimate on this project is from $1,825,896 to $2,231,651 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.NH-HSIP-0003(638) ,AUTAUGA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the North City Limits of Prattville to the I-65 Interchange. Length 3.714 mi.

The Bracket Estimate on this project is from $1,030,633 to $1,259,663 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-HSIP-0006(580) ,TUSCALOOSA COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-6 (US-82) from the junction of Duncanville School Road to 1.000 mile east of the junction of Lake Payne Road in Duncanville. Length 5.584 mi.

The Bracket Estimate on this project is from $5,156,715 to $6,302,652 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.RASTPAA-4915(251) ,MOBILE COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:2.00

for constructing the Widening, Planing, Resurfacing, and Traffic Stripe on CR-33 (Dawes Road) from the junction of Scott Dairy Loop Road South to the junction of D 'Iberville Drive West northwest of Theodore. Length 1.336 mi.

The Bracket Estimate on this project is from $1,199,352 to $1,465,875 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $39.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.RP-NH-0005(561) ,JEFFERSON COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-5 (US-78) from the junction of SR-378 (Finley Boulevard) to the junction of Cherry Avenue in Birmingham. Length 1.528 mi.

The Bracket Estimate on this project is from $1,293,167 to $1,580,537 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.RP-STPAA-HSIP-FMGR-0009(578) ,CALHOUN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-9 from the junction of SR-4 (US-78) west of Heflin to a point 0.070 mile south of the Nature Trail (MP 230.233). Length 10.921 mi.

The Bracket Estimate on this project is from $2,804,258 to $3,427,427 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-0003(636) ,CONECUH COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:4.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 from the north end of the CSX Railroad Bridge (MP 95.972) in Evergreen to MP 102.000. Length 6.027 mi.

The Bracket Estimate on this project is from $1,474,332 to $1,801,961 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPAA-0033(508) ,LAWRENCE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on SR-33 from the Winston County Line (MP 11.370) to north of the junction of CR-70 (MP 17.400). Length 5.926 mi.

The Bracket Estimate on this project is from $579,430 to $708,192 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-0145(507) ,CHILTON COUNTY

Contract Time: 30 Working Days

for constructing the Micro-Surfacing, Scrub Seal, and Traffic Stripe on SR-145 from the I-65 Underpass to a point south of the Waxahatchee Creek Bridge northeast of Clanton. Length 10.846 mi.

The Bracket Estimate on this project is from $1,054,414 to $1,288,728 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-0167(515) ,GENEVA COUNTY

Contract Time: 30 Working Days

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-167 from the Florida State Line to the junction of SR-123 south of Hartford. Length 7.086 mi.

The Bracket Estimate on this project is from $1,145,264 to $1,399,767 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-HSIP-0005(563) ,WALKER COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Guardrail Reset, and Traffic Stripe on SR-5 from 0.260 mile south of the junction of Atkins Road to the Winston County Line. Length 7.226 mi.

The Bracket Estimate on this project is from $3,017,724 to $3,688,330 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-HSIP-0041(521) ,MONROE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:2.00

for constructing the Safety Widening, Resurfacing (Scrub Seal), Guardrail Reset, and Traffic Stripe on SR-41 from the junction of CR-17 to the Wilcox County Line. Length 9.155 mi.

The Bracket Estimate on this project is from $2,008,091 to $2,454,334 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-HSIP-FMGR-0175(501) ,PERRY COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-175 from the junction of SR-14 northeast of Marion to the junction of SR-5 south of Heiberger. Length 5.325 mi.

The Bracket Estimate on this project is from $725,017 to $886,132 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.STPMN-2615(262) & STPMN-2615(250) ,ELMORE COUNTY

Contract Time: 290 Working Days

DBE Goal Percent:6.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on CR-8 (Redland Road) over Harwell Mill Creek to include the Widening, Intersection Improvements, Resurfacing, Traffic Signals, and Traffic Stripe on CR-8 (Redland Road) and CR-4 (Rifle Range Road) northeast of Montgomery. Length 1.031 mi.

The Bracket Estimate on this project is from $3,864,254 to $4,722,977 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $52.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPOA-0815(263) ,CALHOUN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:9.00

for constructing the Roundabout Installation on CR-109 (Bynum Leatherwood Road) at the intersection of Old Gadsden Highway in Blue Mountain. Length 0.178 mi.

The Bracket Estimate on this project is from $933,808 to $1,141,321 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

ALL BIDS REJECTED

Return To: Proposal Letting List (Top of web page)


60.STPOA-0820(250) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on Whites Gap Road Southeast from the junction of SR-21 to the southeast Jacksonville City Limits (Site 1) and on Whites Gap Road from the junction of Cottaquilla Road to the junction of SR-9 (Site 2). Length 4.765 mi.

The Bracket Estimate on this project is from $877,489 to $1,072,478 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.STPOA-I085(371) ,LEE COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:1.00

for constructing the Interchange Lighting on I-85 at CR-12/Cox Road (Exit 50) in Auburn. Length 1.098 mi.

The Bracket Estimate on this project is from $1,614,564 to $1,973,356 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


64.ATRP2-02-2020-204 ,BALDWIN COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:1.00

for constructing the Additional Turn Lanes and Traffic Signal Upgrades on CR-44 at the intersection of SR-42 (US-98) in Fairhope. Length 0.330 mi.

The Bracket Estimate on this project is from $932,399 to $1,139,599 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


70.99-408-663-265-005 ,WILCOX COUNTY

Contract Time: 35 Working Days

for constructing the Slide Repair on SR-265 (Eastbound Roadway and Westbound Roadway) from 0.100 mile south of the junction of Church Road southeast of Camden. Length 0.094 mi.

The Bracket Estimate on this project is from $488,654 to $597,244 .