Office Engineer

Proposal Letting List
May 28, 2021, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. BR-0168(501), MARSHALL 4. ERPR-9050(900), PERRY
7. HRRR-0621(251), BULLOCK 10. HSIP-0015(539), COVINGTON
*12. HSIP-0165(506), RUSSELL 15. IM-I020(360), CALHOUN
16. IM-I059(421), JEFFERSON 17. IM-I065(511), LOWNDES
19. IM-IMGR-I459(317), JEFFERSON 22. RP-NH-HSIP-FMGR-0038(545), SHELBY
25. STPAA-0069(564), MARSHALL 26. STPAA-0075(541), BLOUNT
27. STPAA-0117(512), DEKALB 28. STPAA-0140(502), DALLAS
30. STPAA-HSIP-0014(548), GREENE 33. STPAA-HSIP-0009(580), ETC., COOSA
36. ATRP2-49-2020-442, MOBILE 39. RAED-042-888-035, LIMESTONE
* - WITHDRAWN FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BR-0168(501) ,MARSHALL COUNTY

Contract Time: 185 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-168 over Short Creek 3.000 miles east of the junction of SR-1 (US-431) northeast of Boaz. Length 0.397 mi.

The Bracket Estimate on this project is from $3,347,613 to $4,091,527 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $39.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ERPR-9050(900) ,PERRY COUNTY

Contract Time: 45 Working Days

for constructing the Permanent Restoration (Slide Repair, Planing, Resurfacing, Guardrail Installation, and Traffic Stripe) on SR-14 at a point 1.250 miles west of the junction of SR-175 northeast of Marion. Length 0.128 mi.

The Bracket Estimate on this project is from $716,019 to $875,135 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.HRRR-0621(251) ,BULLOCK COUNTY

Contract Time: 30 Working Days

for constructing the Guardrail and End Anchor Installations on CR-103 over Cowikee Creek (Site 1 and Site 2) southwest of Hurtsboro. Length 0.102 mi.

The Bracket Estimate on this project is from $97,583 to $119,268 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.HSIP-0015(539) ,COVINGTON COUNTY

Contract Time: 30 Working Days

for constructing the Additional Turn Lane and Intersection Modifications on SR-15 (US-29) at SR-137 southwest of Carolina. Length 0.230 mi.

The Bracket Estimate on this project is from $357,639 to $437,114 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.HSIP-0165(506) ,RUSSELL COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Additional Turn Lane (Grading, Drainage, Pavement, and Bridge Culvert Extension) on SR-165 at the junction of CR-24 south of Fort Mitchell. Length 0.216 mi.

The Bracket Estimate on this project is from $584,329 to $714,180 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

****WITHDRAWN FROM THE LETTING****

Return To: Proposal Letting List (Top of web page)


15.IM-I020(360) ,CALHOUN COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-20 from the SR-21 (Exit 185) Interchange in Oxford to the Cleburne County Line. Length 8.000 mi.

The Bracket Estimate on this project is from $3,518,103 to $4,299,904 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.IM-I059(421) ,JEFFERSON COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:6.00

for constructing the Pavement Preservation (Planing, Concrete Joint Repair, Resurfacing, and Traffic Stripe) on I-59 from a point south of the Alabama Adventure Parkway Interchange (Exit 110) to a point south of the bridges over Fairfield Boulevard (MP 116.290) in Brighton. Length 6.635 mi.

The Bracket Estimate on this project is from $6,375,331 to $7,792,072 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.IM-I065(511) ,LOWNDES AND BUTLER COUNTIES

Contract Time: 130 Working Days

DBE Goal Percent:1.00

for constructing the Pavement Preservation (Micro-Milling, Resurfacing, and Traffic Stripe) on I-65 from 1.000 mile south of the Lowndes County Line to 0.630 mile south of the SR-97 Interchange southeast of Letohatchee. Length 11.559 mi.

The Bracket Estimate on this project is from $10,526,098 to $12,865,231 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.IM-IMGR-I459(317) ,JEFFERSON COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:3.00

for constructing the Pavement Preservation (Planing, Concrete Joint Repair, Resurfacing, and Traffic Stripe) on I-459 from the SR-3/US-31 (Exit 13) Interchange to the Lorna Road Overpass and from a point south of Shades Creek (MP 15.892) to a point south of the SR-38/US-280 (Exit 19) Interchange (MP 19.821) in Hoover. Length 4.856 mi.

The Bracket Estimate on this project is from $3,332,816 to $4,073,442 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.RP-NH-HSIP-FMGR-0038(545) ,SHELBY COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, Guardrail Steel Blockout Replacement, Operational Improvements, and Traffic Stripe on SR-38 (US-280) from the Shelby County Line to the junction of Narrows Parkway in Chelsea. Length 6.298 mi.

The Bracket Estimate on this project is from $5,881,532 to $7,188,539 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.STPAA-0069(564) ,MARSHALL COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-69 from the SR-53 (US-231) Underpass to the junction of North Main Street in Arab. Length 0.949 mi.

The Bracket Estimate on this project is from $569,308 to $695,821 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.STPAA-0075(541) ,BLOUNT COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:7.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-75 from the junction of Kornegay Road north of Susan Moore to the intersection of SR-74 (US-278) in Snead. Length 6.487 mi.

The Bracket Estimate on this project is from $1,897,193 to $2,318,791 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.STPAA-0117(512) ,DEKALB COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-117 from the junction of SR-7 (US-11) in Hammondville to the junction of SR-40. Length 2.769 mi.

The Bracket Estimate on this project is from $1,040,339 to $1,271,525 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.STPAA-0140(502) ,DALLAS COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-140 from the junction of SR-41 (SR-8/US-80) southeast of Selma to the junction of SR-14. Length 12.425 mi.

The Bracket Estimate on this project is from $2,143,794 to $2,620,193 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.STPAA-HSIP-0014(548) ,GREENE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Curb Ramp Improvements, and Traffic Stripe on SR-14 from 0.110 mile east of the I-20/I-59 Interchange to the junction of SR-7 (US-11) in Eutaw. Length 2.870 mi.

The Bracket Estimate on this project is from $2,411,864 to $2,947,834 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.STPAA-HSIP-0009(580) & STPNU-HSIP-0009(579) ,COOSA AND CLAY COUNTIES

Contract Time: 95 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-9 from 0.290 mile north of the intersection of SR-38 (US-280) northwest of Kellyton to 0.572 mile south of the junction of CR-91. Length 13.205 mi.

The Bracket Estimate on this project is from $3,754,073 to $4,588,312 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.ATRP2-49-2020-442 ,MOBILE COUNTY

Contract Time: 175 Working Days

DBE Goal Percent:1.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-158 from MP 7.750 to the junction of Spartan Drive in Saraland. Length 0.555 mi.

The Bracket Estimate on this project is from $2,941,386 to $3,595,027 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $35.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.RAED-042-888-035 ,LIMESTONE COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:4.00

for constructing the Widening to Include Ramp Modifications (Grading, Drainage, Pavement, Bridge Removal, Bridge Culvert, Traffic Signals, and Intelligent Traffic Systems) on SR-304 (Old CR-24) from a point west of the intersection of SR-3 (US-31) to a point east of the I-65 (Exit 347) Interchange in Athens. Length 1.552 mi.

The Bracket Estimate on this project is from $11,287,730 to $13,796,114 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $102.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)