September 24, 2021, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. ACNH61118-ATRP(012), SHELBY 4. ACTION-6319(251), TUSCALOOSA
7. BR-0017(574), MOBILE 9. BR-0074(537), BLOUNT
10. BR-0117(506), JACKSON *14. HRRR-3021(250), FRANKLIN
15. HRRR-4121(250), LEE 16. HRRR-5321(250), PERRY
19. HSIP-0001(618), HOUSTON *20. HSIP-0012(568), HOUSTON
21. HSIP-0017(586), MOBILE 22. HSIP-0038(548), ETC., TALLADEGA
*23. HSIP-0055(514), COVINGTON **26. RP-NH-CMAQ-0003(630), ETC., JEFFERSON
29. RHCH-RR19(913), TUSCALOOSA 30. RHCH-RR19(914), WALKER
36. STPMN-0120(251), AUTAUGA **39. STPOA-4116(250), LEE
42. ATRP2-24-2020-024, DALLAS 43. ATRP2-52-2020-176, MORGAN
**46. RACR-037-038-012, JEFFERSON 200. STPAA-NR13(962), GENEVA
* - WITHDRAWN FROM THE LETTING
** - ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACNH61118-ATRP(012) ,SHELBY COUNTY

Contract Time: 260 Working Days

DBE Goal Percent:5.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-119 from the intersection of CR-12 to the junction of CR-26 in Alabaster. Length 0.956 mi.

The Bracket Estimate on this project is from $6,074,717 to $7,424,654 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $69.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ACTION-6319(251) ,TUSCALOOSA COUNTY

Contract Time: March 9, 2023 Completion Date

for constructing the Advanced Connection Transportation Infrastructure and Operations Network (ACTION) along I-20/I-59 including crossing over the Norfolk Southern Railway Company and the Alabama Southern Railroad. Length 21.112 mi.

The Bracket Estimate on this project is from $5,538,541 to $6,769,328 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $62.00 per set.

A MANDATORY pre-bid conference is scheduled for 2:00 p.m. on Thursday, September 9, 2021, at the West Central Region-Tuscaloosa Area Office; 2715 East Skyland Boulevard; Tuscaloosa, Alabama 35405 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


7.BR-0017(574) ,MOBILE COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement over Bennett Creek and Bridge Culvert Removal on SR-17 (US-45) in Citronelle. Length 0.463 mi.

The Bracket Estimate on this project is from $3,575,219 to $4,369,712 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $44.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


9.BR-0074(537) ,BLOUNT COUNTY

Contract Time: 220 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches on SR-74 (US-278) over Locust Fork Creek in Snead. Length 0.928 mi.

The Bracket Estimate on this project is from $5,030,783 to $6,148,735 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $58.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


10.BR-0117(506) ,JACKSON COUNTY

Contract Time: 380 Working Days

for constructing the Bridge Rehabilitation and Bridge Painting on SR-117 over the Tennessee River and the Tennessee River Relief Bridge southeast of Stevenson. Length 0.435 mi.

The Bracket Estimate on this project is from $6,138,131 to $7,502,160 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.HRRR-3021(250) ,FRANKLIN COUNTY

Contract Time: 20 Working Days

for constructing the Safety Improvements (Guardrail and Traffic Control Device Installations) on CR-12 (College Road) at various sites from the junction of SR-17 (US-43) to the junction of Dan Street in Phil Campbell. Length 0.343 mi.

The Bracket Estimate on this project is from $118,137 to $144,389 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


15.HRRR-4121(250) ,LEE COUNTY

Contract Time: 20 Working Days

for constructing the Safety Improvements (Planing, Superelevation Corrections, Shoulder Widening, Traffic Stripe, Centerline Scoring, and Pavement Markers) on CR-179 from the Little Uchee Creek Bridge to a point 1329 feet north southwest of Smiths Station. Length 0.251 mi.

The Bracket Estimate on this project is from $193,441 to $236,428 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.HRRR-5321(250) ,PERRY COUNTY

Contract Time: 15 Working Days

for constructing the Guardrail and Guardrail End Anchor Installations on CR-65 over an unnamed stream and over Freetown Creek south of Uniontown (Site 1 and Site 2). Length 0.074 mi.

The Bracket Estimate on this project is from $49,104 to $60,017 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.HSIP-0001(618) ,HOUSTON COUNTY

Contract Time: 30 Working Days

for constructing the Left Turn Lane Addition and Intersection Modifications on SR-1 (US-431) at Grey Hodges Road in Dothan. Length 0.405 mi.

The Bracket Estimate on this project is from $286,415 to $350,062 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.HSIP-0012(568) ,HOUSTON COUNTY

Contract Time: 35 Working Days

for constructing the Safety Improvements (Intersection Improvements, Access Management, Turn Lane Improvements, Acceleration Lane Addition, and Median Crossover Protection) on SR-12 (US-84) from a point 150 feet west of the junction of Health Sciences Boulevard to a point 1470 east of the junction of Eddins Road. Length 1.396 mi.

The Bracket Estimate on this project is from $1,408,409 to $1,721,389 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


21.HSIP-0017(586) ,MOBILE AND WASHINGTON COUNTIES

Contract Time: 40 Working Days

for constructing the Safety Improvements (Centerline Scoring) on SR-17/SR-57 (US-45) from the SR-158 Interchange in Prichard to the Mississippi State Line. Length 48.214 mi.

The Bracket Estimate on this project is from $371,150 to $453,628 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.HSIP-0038(548) & ST-061-038-002 ,TALLADEGA COUNTY

Contract Time: 190 Working Days

DBE Goal Percent:2.00

for constructing the Access Management (Grading, Drainage, Pavement, and Traffic Stripe) on SR-38 (US-280) in Childersburg from south of the Coosa River Bridge to 0.850 mile north of the SR-21 Underpass in Sylacauga. Length 7.710 mi.

The Bracket Estimate on this project is from $1,927,747 to $2,356,135 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $92.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.HSIP-0055(514) ,COVINGTON COUNTY

Contract Time: 95 Working Days

for constructing the Roundabout Installation (Grading, Drainage, Pavement, Traffic Signs, and Traffic Stripe) on SR-55 at the intersection of SR-12 (US-84) in the town of River Falls. Length 0.482 mi.

The Bracket Estimate on this project is from $3,225,348 to $3,942,092 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $55.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


26.RP-NH-CMAQ-0003(630) & ATRP2-37-2021-109 ,JEFFERSON COUNTY

Contract Time: October 1, 2022 Completion Date

DBE Goal Percent:2.00

for constructing the Resurfacing, Auxiliary Lanes, Ramp Improvements, Median Barrier Rail Installation, and Bridge Rail Retrofits (Partial Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-3 (US-31) from the junction of Bonita Drive in Homewood to the junction of 2nd Avenue North in Birmingham. Length 2.493 mi.

The Bracket Estimate on this project is from $11,015,030 to $13,462,815 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $62.00 per set.

A MANDATORY pre-bid conference is scheduled for 2:00 p.m. on Thursday, September 9, 2021, at the East Central Region Office; 100 Corporate Parkway; Suite 450; Hoover, AL 35242 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


29.RHCH-RR19(913) ,TUSCALOOSA, CHILTON, BIBB, HALE, SUMTER, AND PERRY COUNTIES

Contract Time: 80 Working Days

for constructing the Safety Improvements and Upgrade Passive Warning Devices (Advance Warning Signs, Pavement Markings and Legends, Traffic Signs, and Traffic Stripe) on various routes at various locations in the Tuscaloosa Region (Tuscaloosa Area) as indicated in the plans.

The Bracket Estimate on this project is from $1,768,010 to $2,160,902 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $75.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.RHCH-RR19(914) ,WALKER, PICKENS, WINSTON, LAMAR, GREENE, MARION, AND FAYETTE COUNTIES

Contract Time: 70 Working Days

for constructing the Safety Improvements and Upgrade Passive Warning Devices (Advance Warning Signs, Pavement Markings and Legends, Traffic Signs, and Traffic Stripe) on various routes at various locations in the Tuscaloosa Region (Fayette Area) as indicated in the plans.

The Bracket Estimate on this project is from $1,821,809 to $2,226,656 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $83.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPMN-0120(251) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-10 from the junction of SR-6 (US-82) to the junction of CR-57 northwest of Prattville. Length 4.573 mi.

The Bracket Estimate on this project is from $453,721 to $554,548 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPOA-4116(250) ,LEE COUNTY

Contract Time: 250 Working Days

DBE Goal Percent:3.00

for constructing the Drainage Improvements, Widening, Plaining, Resurfacing, and Traffic Stripe on South College Street, Samford Avenue, Gay Street, and Reese Avenue in Auburn. Length 0.429 mi.

The Bracket Estimate on this project is from $3,330,478 to $4,070,584 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $43.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


42.ATRP2-24-2020-024 ,DALLAS COUNTY

Contract Time: 120 Working Days

DBE Goal Percent:2.00

for constructing the Intersection Improvements (Roadway Realignment, Widening, Turn Lane Addition, Acceleration Lane Addition,Traffic Lights, and Traffic Signals) on SR-41 at SR-8 (US-80) southeast of Selma. Length 0.470 mi.

The Bracket Estimate on this project is from $1,818,706 to $2,222,863 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $23.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.ATRP2-52-2020-176 ,MORGAN COUNTY

Contract Time: 115 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements (Grading, Drainage, Pavement, Traffic Signal Modifications, and Traffic Stripe) on SR-67 (Beltline Road) at Sandlin Road and Central Parkway in Decatur. Length 0.374 mi.

The Bracket Estimate on this project is from $1,574,343 to $1,924,197 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $32.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.RACR-037-038-012 ,JEFFERSON COUNTY

Contract Time: September 1, 2022 Completion Date

DBE Goal Percent:6.00

for constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-38 (US-280) from the SR-149 Interchange to the Pump House Road Overpass in Mountain Brook. Length 1.566 mi.

The Bracket Estimate on this project is from $6,459,307 to $7,894,708 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $72.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Thursday, September 9, 2021, at the East Central Region Office; 100 Corporate Parkway, Suite 40; Hoover, Al 35242 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


200.STPAA-NR13(962) ,GENEVA AND HOUSTON COUNTIES

Contract Time: 60 Working Days

for constructing the Curb Ramp Installations and Modifications on various routes at various locations as indicated in the plans.

The Bracket Estimate on this project is from $362,061 to $442,519 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)