January 28, 2022, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

7. CRSAPC-STPPC-4120(251), ETC., LEE 14. IM-I065(512), MOBILE
16. IM-HSIP-IMGR-I459(318), JEFFERSON 20. NH-0002(594), LIMESTONE
21. NH-0002(596), MADISON 22. NH-0002(598), LAUDERDALE
23. NH-0003(645), LIMESTONE 24. NH-0008(603), DALLAS
25. NH-0009(582), MONTGOMERY 26. NH-0010(553), PIKE
27. NH-0013(619), ETC., MARENGO 28. NH-0013(624), FRANKLIN
29. NH-0038(550), LEE 30. NH-0042(540), BALDWIN
31. NH-0042(541), MOBILE 34. NH-FMGR-0001(622), CALHOUN
36. NH-HSIP-FMGR-0006(584), ETC., CHILTON 39. RP-NH-0003(640), LIMESTONE
40. RP-NH-0017(582), MOBILE 42. RP-STPAA-0069(569), WALKER
45. STPAA-0003(641), CHILTON 46. STPAA-0010(554), CHOCTAW
47. STPAA-0017(588), CHOCTAW 48. STPAA-0021(574), MONROE
49. STPAA-0134(511), DALE 50. STPAA-0183(505), ETC., PERRY
51. STPAA-0185(501), BUTLER 55. STPAA-HSIP-0014(553), HALE
56. STPAA-HSIP-0050(508), TALLAPOOSA 57. STPAA-HSIP-0059(518), BALDWIN
58. STPAA-HSIP-0125(505), COFFEE 59. STPAA-HSIP-0165(505), RUSSELL
60. STPAA-HSIP-0181(509), BALDWIN 69. STPOA-0821(250), CALHOUN
78. ST-037-999-025, JEFFERSON

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


7.CRSAPC-STPPC-4120(251) & STPPC-4120(252) ,LEE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:4.00

for constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on CR-318 from the junction of CR-248 to the junction of CR-249 (Site 1) and on CR-249 from the junction of CR-379 to the junction of CR-318 (Site 2). Length 6.508 mi.

The Bracket Estimate on this project is from $2,145,113 to $2,621,805 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.IM-I065(512) ,MOBILE COUNTY

Contract Time: 65 Working Days

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-65 from 0.560 mile north of the SR-158 Underpass to 0.410 mile north of the SR-13 (US-43) Interchange in Creola. Length 6.362 mi.

The Bracket Estimate on this project is from $2,736,874 to $3,345,068 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.IM-HSIP-IMGR-I459(318) ,JEFFERSON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, Guardrail Safety Improvements, and Traffic Stripe on I-459 from 0.250 mile south of the SR-38 (US-280) Overpass to 0.240 mile south of the Grants Mill Road Overpass in Irondale. Length 7.311 mi.

The Bracket Estimate on this project is from $4,861,527 to $5,941,866 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.NH-0002(594) ,LIMESTONE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-2 (US-72) from a point east of the Elk River Bridges (MP 59.960) to a point 0.020 mile east of the intersection of Shaw Road (MP 66.250) west of Athens. Length 6.148 mi.

The Bracket Estimate on this project is from $3,214,897 to $3,929,318 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.NH-0002(596) ,MADISON COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-2 (US-72) in Madison from the junction of County Line Road to the junction of Perimeter Parkway in Huntsville. Length 6.699 mi.

The Bracket Estimate on this project is from $3,949,530 to $4,827,203 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.NH-0002(598) ,LAUDERDALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:7.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-2 (US-72) from a point 0.080 mile east of the junction of Bank Street (MP 56.074) in Rogersville to a point east of the Elk River Bridges (MP 59.960). Length 3.785 mi.

The Bracket Estimate on this project is from $1,733,585 to $2,118,826 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.NH-0003(645) ,LIMESTONE COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.110 mile north of the junction of Thomas L. Hammons Road to 0.130 mile south of the intersection of SR-304. Length 4.851 mi.

The Bracket Estimate on this project is from $2,514,518 to $3,073,299 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.NH-0008(603) ,DALLAS COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from a point 0.400 mile west of the Cahaba River Bridges (MP 73.765) to the junction of SR-14 in Selma. Length 7.490 mi.

The Bracket Estimate on this project is from $3,252,126 to $3,974,821 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.NH-0009(582) ,MONTGOMERY COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-9 (US-331) from the end of the 2-lane section (MP 83.582) to a point near the junction of Old Hayneville Road (MP 88.260) northwest of Ramer. Length 4.678 mi.

The Bracket Estimate on this project is from $2,017,243 to $2,465,519 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.NH-0010(553) ,PIKE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:2.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-10 (US-231) from the junction of Diamond Drive in Troy to Veterans Boulevard in Brundidge. Length 6.522 mi.

The Bracket Estimate on this project is from $4,963,713 to $6,066,760 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.NH-0013(619) & NH-0013(623) ,MARENGO AND MOBILE COUNTIES

Contract Time: 85 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the intersection of Oakley Avenue in Linden to the junction of 12 Link Road (Site 1) and the Planing, Resurfacing, and Traffic Stripe on SR-13 (US-43) from the junction of Travis Road in Prichard to the junction of Short Street in Chickasaw (Site 2). Length 8.810 mi.

The Bracket Estimate on this project is from $2,745,978 to $3,356,195 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.NH-0013(624) ,FRANKLIN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-13 from 0.080 mile north of the intersection of Underwood Road in Russellville to the Colbert County Line. Length 4.519 mi.

The Bracket Estimate on this project is from $2,491,618 to $3,045,311 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.NH-0038(550) ,LEE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-38 (US-280) from the Chambers County Line to the junction of SR-147 in Auburn. Length 6.412 mi.

The Bracket Estimate on this project is from $2,641,381 to $3,228,354 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.NH-0042(540) ,BALDWIN COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stipe on SR-42 (US-98) from a point west of the Elberta City Limits to a point on the Perdido Bay Bridge (MP 80.688). Length 11.687 mi.

The Bracket Estimate on this project is from $2,302,319 to $2,813,946 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.NH-0042(541) ,MOBILE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-42 (US-98) from the junction of Snow Road to the junction of Magnolia Grove Parkway southwest of Semmes. Length 5.473mi.

The Bracket Estimate on this project is from $2,705,958 to $3,307,283 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.NH-FMGR-0001(622) ,CALHOUN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-1 (US-431) from 0.280 mile south of the junction of SR-204 to the Etowah County Line. Length 4.073 mi.

The Bracket Estimate on this project is from $3,220,617 to $3,936,310 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.NH-HSIP-FMGR-0006(584) & 99-405-114-006-101 ,CHILTON COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Surfacing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from the Bibb County Line to the Autauga County Line to include the Maplesville Rest Area. Length 16.785 mi.

The Bracket Estimate on this project is from $3,482,373 to $4,256,234 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.RP-NH-0003(640) ,LIMESTONE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from 0.130 mile north of the intersection of SR-304 to 0.090 mile north of SR-2 (US-72) in Athens. Length 3.721 mi.

The Bracket Estimate on this project is from $2,141,453 to $2,617,331 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.RP-NH-0017(582) ,MOBILE COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-17 (US-45) from the junction of Springhill Avenue to the I-65 Interchange in Prichard. Length 4.003 mi.

The Bracket Estimate on this project is from $1,527,551 to $1,867,007 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.RP-STPAA-0069(569) ,WALKER COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-69 from the junction of SR-118 to the junction of SR-5 in Jasper. Length 1.338 mi.

The Bracket Estimate on this project is from $1,575,958 to $1,926,171 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.STPAA-0003(641) ,CHILTON COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of Ben Wells Road to the junction of Newport Avenue in Clanton. Length 2.334 mi.

The Bracket Estimate on this project is from $1,512,299 to $1,848,365 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


46.STPAA-0010(554) ,CHOCTAW AND MARENGO COUNTIES

Contract Time: 70 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-10 from the junction of Ida Avenue in Butler to 0.290 mile west of the intersection of SR-69 southeast of Tompkinsville. Length 12.177 mi.

The Bracket Estimate on this project is from $2,870,637 to $3,508,556 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPAA-0017(588) ,CHOCTAW COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-17 from a point north of Little Mill Creek to 0.400 mile north of the junction of Cypress Lane northeast of Toxey. Length 7.464 mi.

The Bracket Estimate on this project is from $1,783,611 to $2,179,969 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.STPAA-0021(574) ,MONROE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from the Escambia County Line to the junction of Presley Road south of Frisco City. Length 12.661 mi.

The Bracket Estimate on this project is from $2,322,095 to $2,838,117 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


49.STPAA-0134(511) ,DALE COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-134 from the junction of SR-85 to the junction of SR-123. Length 6.828 mi.

The Bracket Estimate on this project is from $2,107,922 to $2,576,349 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-0183(505) & STPAA-0300(500) ,PERRY AND TUSCALOOSA COUNTIES

Contract Time: 35 Working Days

for constructing the Resurfacing (Micro-Surfacing Seal Coat and Scrub Seal) and Traffic Stripe on SR-183 from MP 34.774 at the north end of the Caffe Creek Bridge to the Chilton County Line (Site 1) and the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat and Scrub Seal) on SR-300 from the junction of SR-7 (US-11) to the I-59 Southbound Ramps in Fosters (Site 2). Length 7.755 mi.

The Bracket Estimate on this project is from $1,492,239 to $1,823,848 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


51.STPAA-0185(501) ,BUTLER COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Roadway Improvements and Roadway Widening (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-185 from the junction of SR-245 to 0.200 mile north of the junction of CR-73 (Cahaba Road) in Greenville. Length 0.481 mi.

The Bracket Estimate on this project is from $997,714 to $1,219,429 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


55.STPAA-HSIP-0014(553) ,HALE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Leveling, Resurfacing, and Traffic Stripe on SR-14 from 0.500 mile east of the junction of CR-38 to 0.780 mile west of the junction of CR-21 northwest of Greensboro. Length 8.592 mi.

The Bracket Estimate on this project is from $3,829,096 to $4,680,006 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $17.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPAA-HSIP-0050(508) ,TALLAPOOSA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-50 from the Elmore County Line to the intersection of SR-49. Length 7.957 mi.

The Bracket Estimate on this project is from $1,761,485 to $2,152,926 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.STPAA-HSIP-0059(518) ,BALDWIN COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe on SR-59 from the junction of McMillan Road to the intersection of CR-80 northeast of Stockton. Length 12.450 mi.

The Bracket Estimate on this project is from $2,417,640 to $2,954,893 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


58.STPAA-HSIP-0125(505) ,COFFEE COUNTY

Contract Time: 85 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-125 from the junction of SR-12 (US-84) in Elba to the intersection of SR-167. Length 12.419 mi.

The Bracket Estimate on this project is from $2,844,071 to $3,476,087 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.STPAA-HSIP-0165(505) ,RUSSELL COUNTY

Contract Time: 90 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-165 from 0.360 mile south of the junction of New Hope Church Road to 0.100 mile south of the junction of Nuckols Road. Length 12.163 mi.

The Bracket Estimate on this project is from $3,429,449 to $4,191,549 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.STPAA-HSIP-0181(509) ,BALDWIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-181 from the junction of Quail Creek Drive in Fairhope to the junction of Mosley Drive. Length 1.690 mi.

The Bracket Estimate on this project is from $510,445 to $623,877 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


69.STPOA-0821(250) ,CALHOUN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Resurfacing and Traffic Stripe on Roy Webb Road from the junction of SR-21 to the junction of Foster West Road. Length 4.099 mi.

The Bracket Estimate on this project is from $809,070 to $988,863 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


78.ST-037-999-025 ,JEFFERSON COUNTY

Contract Time: 45 Working Days

for constructing the Resurfacing and Traffic Stripe on various routes at various locations within Fountain Heights in Birmingham as indicated in the plans. Length 4.924 mi.

The Bracket Estimate on this project is from $1,001,167 to $1,223,649 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items