Office Engineer

Proposal Letting List
February 25, 2022, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. ACOA61873-ATRP(017), TUSCALOOSA 4. ATRP2-IM-I085(376), ETC., CHAMBERS
**7. ERPR-9072(927), BALDWIN 8. ERPR-9072(928), COFFEE
**11. IM-I085(365), MACON 12. IM-I085(372), MACON
13. IM-I085(374), LEE 16. NH-0001(620), ETOWAH
18. NH-0002(597), JACKSON 20. NH-0008(604), MACON
24. NH-HSIP-0013(627), MARENGO 27. RP-HSIP-0025(554), CHEROKEE
30. RP-STPAA-0051(520), LEE 31. RP-STPAA-HSIP-0040(503), JACKSON
34. STPAA-0006(585), BARBOUR 35. STPAA-0010(556), MARENGO
36. STPAA-0015(540), ESCAMBIA 37. STPAA-0033(509), LAWRENCE
38. STPAA-0051(518), ETC., BARBOUR 39. STPAA-0055(518), BUTLER
40. STPAA-0075(542), DEKALB 42. STPAA-0241(505), FRANKLIN
43. STPAA-2321(250), DALE 50. STPAA-NR13(945), MADISON
53. STPNU-0079(521), ETC., BLOUNT 56. STPOA-2319(250), DALE
59. ATRP2-27-2021-090, ESCAMBIA 61. ATRP2-45-2020-327, MADISON
201. STPAA-NR13(963), PICKENS
**-ALL BIDS REJECTED

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.ACOA61873-ATRP(017) ,TUSCALOOSA COUNTY

Contract Time: 180 Working Days

DBE Goal Percent:5.00

for constructing the Widening, Resurfacing, and Traffic Stripe on Fosters Ferry Road from the junction of Joe Mallisham Parkway to the junction of 29th Street in Tuscaloosa. Length 1.152 mi.

The Bracket Estimate on this project is from $3,968,364 to $4,850,223 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $29.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.ATRP2-IM-I085(376) & ATRP2-09-2021-009 ,CHAMBERS COUNTY

Contract Time: April 1, 2023 Completion Date

for constructing the Interstate Lighting Installation on I-85 from a point south of the Alabama Welcome Center to Moores Creek and the Interstate Lighting Upgrade and Replacement on I-85 from Moores Creek to the Georgia State Line to include Lighting and Signal Upgrades at the Exit 179 Interchange in Valley. Length 1.945 mi.

The Bracket Estimate on this project is from $2,470,867 to $3,019,949 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.ERPR-9072(927) ,BALDWIN AND MOBILE COUNTIES

Contract Time: 250 Working Days

for constructing the Traffic Signal and Roadway Lighting Improvements on SR-16, SR-42, SR-59, SR-161, SR-180, and SR-188 at various locations in the Southwest Region (Mobile Area) as indicated in the plans.

The Bracket Estimate on this project is from $3,340,911 to $4,083,336 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $30.00 per set.

**ALL BIDS REJECTED**

Return To: Proposal Letting List (Top of web page)


8.ERPR-9072(928) ,COFFEE COUNTY

Contract Time: 20 Working Days

DBE Goal Percent:1.00

for constructing the Bridge Scour Repairs on CR-107 over the Pea River Relief. Length 0.090 mi.

The Bracket Estimate on this project is from $128,072 to $156,532 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.IM-I085(365) ,MACON AND MONTGOMERY COUNTIES

Contract Time: August 31, 2023 Completion Date

DBE Goal Percent:3.00

for constructing the Bridge Widening on I-85 (Northbound and Southbound Roadways) over Line Creek and Relief Bridges. Length 1.098 mi.

The Bracket Estimate on this project is from $16,235,261 to $19,843,097 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $98.00 per set.

****ALL BIDS REJECTED****

Return To: Proposal Letting List (Top of web page)


12.IM-I085(372) ,MACON COUNTY

Contract Time: 270 Working Days

DBE Goal Percent:2.00

for constructing the Pavement Preservation (Planing, Resurfacing, and Traffic Stripe) on I-85 from 1.500 miles north of the CR-36 Overpass to the Lee County Line. Length 11.499 mi.

The Bracket Estimate on this project is from $17,123,129 to $20,928,268 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.IM-I085(374) ,LEE COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:1.00

for constructing Micro-Milling, Resurfacing, and Traffic Stripe on I-85 from 0.400 mile south of the SR-147 Interchange (Exit 51) to 0.380 mile south of the Bent Creek Road Interchange (Exit 57) in Auburn. Length 5.524 mi.

The Bracket Estimate on this project is from $5,032,138 to $6,150,390 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.NH-0001(620) ,ETOWAH COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of SR-74 (US-278) to the south end of the Coosa River Bridge in Gadsden. Length 1.720 mi.

The Bracket Estimate on this project is from $1,284,048 to $1,569,392 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.NH-0002(597) ,JACKSON COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-2 (US-72) from the junction of CR-113 (MP 145.640) in Hollywood to the junction of CR-42 in Fackler (MP 149.080). Length 3.439 mi.

The Bracket Estimate on this project is from $2,574,882 to $3,147,078 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.NH-0008(604) ,MACON COUNTY

Contract Time: 45 Working Days

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-8 (US-80) from 0.330 mile east of the junction of SR-15 (US-29) to the Lee County Line. Length 8.649 mi.

The Bracket Estimate on this project is from $1,987,247 to $2,428,857 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.NH-HSIP-0013(627) ,MARENGO COUNTY

Contract Time: December 31, 2022 Completion Date

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (US-43) from 0.800 mile north of the junction of CR-47 (MP 111.506) to the junction of SR-69 in Linden. Length 6.654 mi.

The Bracket Estimate on this project is from $1,781,913 to $2,177,893 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.RP-HSIP-0025(554) ,CHEROKEE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:2.00

for constructing the Intersection Improvements on SR-25 (US-411) at Walmart to include Left Turn Lane Improvements in Centre. Length 0.246 mi.

The Bracket Estimate on this project is from $845,005 to $1,032,784 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.RP-STPAA-0051(520) ,LEE COUNTY

Contract Time: 30 Working Days

for constructing the Planing, Widening, Resurfacing, and Traffic Stripe on SR-51 from 0.700 mile south of the junction of SR-169 to the junction of the Northbound On Ramp of I-85 in Opelika. Length 1.208 mi.

The Bracket Estimate on this project is from $1,033,251 to $1,262,863 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.RP-STPAA-HSIP-0040(503) ,JACKSON COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing (High Friction Surface Treatment), and Traffic Stripe on SR-40 from the junction of SR-35 to the junction of SR-71 northeast of Dutton. Length 6.940 mi.

The Bracket Estimate on this project is from $2,832,495 to $3,461,939 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.STPAA-0006(585) ,BARBOUR COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-6 (US-82) from the junction of Poplar Springs Road to the junction of SR-1 (US-431) in Eufaula. Length 11.527 mi.

The Bracket Estimate on this project is from $2,785,178 to $3,404,106 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.STPAA-0010(556) ,MARENGO COUNTY

Contract Time: December 31, 2022 Completion Date

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-10 from 0.290 mile west of the junction of SR-69 to the junction of 3rd Street in Sweet Water. Length 9.147 mi.

The Bracket Estimate on this project is from $2,362,413 to $2,887,394 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPAA-0015(540) ,ESCAMBIA COUNTY

Contract Time: December 31, 2022 Completion Date

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-15 (US-29) from the junction of SR-41 in East Brewton to a point 0.550 mile east of the junction of CR-482 (MP 7.310). Length 6.018 mi.

The Bracket Estimate on this project is from $1,450,097 to $1,772,340 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-0033(509) ,LAWRENCE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-33 from the junction of SR-36 in Wren to the junction of Main Street in Moulton. Length 2.667 mi.

The Bracket Estimate on this project is from $883,972 to $1,080,410 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.STPAA-0051(518) & STPAA-0010(557) ,BARBOUR COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-51 from the Dale County Line to 0.040 mile south of the junction of Bull Road in Clio (Site 1) and on SR-10 from 0.478 mile west of the intersection of SR-51 to 0.421 mile east of the intersection of SR-51 in Clio (Site 2). Length 10.184 mi.

The Bracket Estimate on this project is from $2,424,353 to $2,963,099 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPAA-0055(518) ,BUTLER COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-55 from the Conecuh County Line to a point south of the Persimmon Creek Bridge (MP 52.755). Length 4.450 mi.

The Bracket Estimate on this project is from $1,968,541 to $2,405,994 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-0075(542) ,DEKALB COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-75 from the junction of Denham Creek Drive (MP 80.530) in Fyfee to the intersection of Broadway Street southeast in Rainsville. Length 4.290 mi.

The Bracket Estimate on this project is from $3,192,738 to $3,902,236 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-0241(505) ,FRANKLIN COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-241 from the Marion County Line to the junction of SR-237 southwest of Phil Campbell. Length 1.001 mi.

The Bracket Estimate on this project is from $276,551 to $338,007 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.STPAA-2321(250) ,DALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:9.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on CR-36 from the junction of SR-105 in Ozark to the junction of SR-27. Length 9.028 mi.

The Bracket Estimate on this project is from $1,578,973 to $1,929,856 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPAA-NR13(945) ,MADISON COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:7.00

for constructing the Safety Improvements (Curb Ramp Installations) on SR-1, SR-2, and SR-53 at various locations in Madison County as indicated in the plans.

The Bracket Estimate on this project is from $618,662 to $756,142 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.STPNU-0079(521) & NH-0053(594) ,BLOUNT COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:7.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-79 from the junction of SR-53 (US-231) northeast of Cleveland to the intersection of SR-74 (US-278) in Brooksville (Site 1) and on SR-53 (US-231) from the junction of SR-79 in Cleveland to a point north of the junction of Fowler Springs Road (MP 264.457) (Site 2). Length 12.914 mi.

The Bracket Estimate on this project is from $2,848,518 to $3,481,522 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


56.STPOA-2319(250) ,DALE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-47 from the North City of Dothan to the junction of SR-134 in Pinckard. Length 2.836 mi.

The Bracket Estimate on this project is from $662,206 to $809,363 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.ATRP2-27-2021-090 ,ESCAMBIA COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:3.00

for constructing the Intersection Improvements on SR-21 at Poarch Road in Atmore. Length 0.216 mi.

The Bracket Estimate on this project is from $554,439 to $677,648 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


61.ATRP2-45-2020-327 ,MADISON COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:8.00

for constructing the Widening, Micro-Milling, Resurfacing, and Traffic Stripe on Wall Triana Highway (Site 1); the Widening and Resurfacing on Graphics Drive (Site 2); and the Widening and Roadway Realignment on the I-565 Eastbound Off Ramp at Wall Triana Highway in Madision (Site 3). Length 0.166 mi.

The Bracket Estimate on this project is from $1,097,925 to $1,341,908 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


201.STPAA-NR13(963) ,PICKENS AND GREENE COUNTIES

Contract Time: 50 Working Days

for constructing the Safety Improvements (Curb Ramp Installations) on SR-6, SR-7, SR-13, SR-14, SR-17, SR-86, and SR-159 in the West Central Region (Fayette Area) at various locations as indicated in the plans.

The Bracket Estimate on this project is from $278,746 to $340,690 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $72.00 per set.

THIS PROJECT HAS BEEN DESIGNATED AS AN SBE PROJECT, AND CAN ONLY BE BID ON BY QUALIFIED SBE CONTRACTORS THAT HAVE BEEN PRE-APPROVED BY THE ALDOT DBE UNIT AND ALDOT OFFICE ENGINEER.

View Items

Return To: Proposal Letting List (Top of web page)