Office Engineer

Proposal Letting List
September 30, 2022, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. BR-0012(576), HOUSTON 4. CRPAA-0042(543), MOBILE
5. CRPAA-I065(518), SHELBY 11. FBD-NR21(916), MOBILE
14. HRRR-0122(250), AUTAUGA 15. HRRR-6122(250), TALLADEGA
18. HSIP-0001(617), MARSHALL 19. HSIP-0167(514), PIKE
25. IM-I065(497), CONECUH 28. PR-I065(532), CULLMAN
31. STPMN-5121(250), MONTGOMERY 34. ATRP2-38-2021-500, ETC., LAMAR
37. STPSU-0819(254), CALHOUN 38. STPSU-3520(251), ETC., HOUSTON
39. STPSU-5220(252), MORGAN 40. STPSU-6321(254), TUSCALOOSA
**43. ATRP2-29-2020-208, FAYETTE 44. ATRP2-41-2022-456, LEE
**45. ATRP2-47-2021-255, MARION 51. RACR-041-014-001, LEE
54. RAED-031-052-006, GENEVA 57. RACR-002-000-015, BALDWIN
60. 99-406-062-110-201, BULLOCK
** - REJECTED FROM THE LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BR-0012(576) ,HOUSTON COUNTY

Contract Time: 200 Working Days

for constructing the Bridge Deck Repair (Hydroblasting and Deck Rehabilitation) on SR-12 (US-84) over the Chattahoochee River (MP 231.490 to MP 231.670) southwest of Gordon. Length 0.180 mi.

The Bracket Estimate on this project is from $3,663,028 to $4,477,034 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.CRPAA-0042(543) ,MOBILE COUNTY

Contract Time: 150 Working Days

for constructing the Upgrade Roadway Lighting Luminaires on SR-42 (US-98) in the Bankhead Tunnel in Mobile. Length 0.280 mi.

The Bracket Estimate on this project is from $1,452,932 to $1,775,806 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


5.CRPAA-I065(518) ,SHELBY AND JEFFERSON COUNTIES

Contract Time: 180 Working Days

for constructing the Installation of ITS Infrastructure (Communications, Detection, Monitoring, and Messaging) to Support Advanced Corridor Management on I-65 from MP 228.200 to MP 253.250 and on SR-3 (US-31) from MP 242.660 to MP 263.000 south of Vestavia Hills. Length 45.070 mi.

The Bracket Estimate on this project is from $3,427,174 to $4,188,769 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $58.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.FBD-NR21(916) ,MOBILE COUNTY

Contract Time: 50 Working Days

for constructing the Dock Repairs at the Mobile Ferry Dock (East Dock) in Dauphin Island.

The Bracket Estimate on this project is from $539,970 to $659,963 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.HRRR-0122(250) ,AUTAUGA COUNTY

Contract Time: 30 Working Days

for constructing the Safety Improvements (Safety Widening, Resurfacing, Scoring, and Traffic Stripe) on CR-40 from the junction of CR-69 to the junction of CR-21 northwest of Booth. Length 2.549 mi.

The Bracket Estimate on this project is from $405,702 to $495,858 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.HRRR-6122(250) ,TALLADEGA COUNTY

Contract Time: 45 Working Days

for constructing the Roadway Safety Improvements (Raised Pavement Marker Installation, Traffic Markings, and Rumble Strips) on CR-207, Grist Mill Road, Stockdale Road, Logan Martin Dam Road, Berney Station Road, Priebes Mill Road, Old Sylacauga Highway, Odens Mill Road, Goodwater Highway, and Ironaton Road at various locations as indicated in the plans. Length 62.837 mi.

The Bracket Estimate on this project is from $138,772 to $169,610 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.HSIP-0001(617) ,MARSHALL COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:5.00

for constructing the Intersection Improvements, Acceleration Lane Extension, Traffic Signals, and Traffic Stripe on SR-1 (US-431) at SR-79 northeast of Guntersville. Length 0.313 mi.

The Bracket Estimate on this project is from $1,239,118 to $1,514,478 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.HSIP-0167(514) ,PIKE COUNTY

Contract Time: 95 Working Days

DBE Goal Percent:2.00

for constructing the Roundabout Installation (Grading, Drainage, Pavement, Lighting, and Traffic Stripe) on SR-167 at SR-87 (MP 52.194 to MP 54.207) south of Troy. Length 0.499 mi.

The Bracket Estimate on this project is from $2,847,774 to $3,480,613 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.IM-I065(497) ,CONECUH COUNTY

Contract Time: April 1, 2026 Completion Date

DBE Goal Percent:1.00

for constructing the Bridge Replacements (Grading, Drainage, Pavement, and Bridge) on I-65 over the Sepulga River and Relief northeast of Evergreen. Length 1.325 mi.

The Bracket Estimate on this project is from $26,906,986 to $32,886,316 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $85.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.PR-I065(532) ,CULLMAN COUNTY

Contract Time: 30 Working Days

for constructing the Drainage Improvements (Pipe Rehabilitation and Drainage Structure Correction) on I-65 from the Blount County Line to the Morgan County Line. Length 26.850 mi.

The Bracket Estimate on this project is from $794,572 to $971,143 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.STPMN-5121(250) ,MONTGOMERY COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing and Traffic Stripe on CR-15 (Wadsen Road) from the Lowndes County Line to the junction of CR-15 (Lamar Road) southwest of Montgomery (Site 1) and on CR-15 (Lamar Road) from the junction of CR-15 (Wadsen Road) to the junction of SR-8 (US-80) in Montgomery (Site 2). Length 5.843 mi.

The Bracket Estimate on this project is from $1,172,932 to $1,433,583 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.STPNU-0017(590) & ATRP2-38-2021-500 ,LAMAR COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-17 from the junction of CR-9 to the junction of CR-29 in Vernon. Length 1.006 mi.

The Bracket Estimate on this project is from $569,767 to $696,382 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPSU-0819(254) ,CALHOUN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for the constructing the Resurfacing and Traffic Stripe on Country Club Drive Southwest and Henry Road from the junction of Fairway Drive to the junction of SR-21 in Jacksonville. Length 0.822 mi.

The Bracket Estimate on this project is from $691,876 to $845,626 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.STPSU-3520(251), STPSU-3521(251), STPSU-3521(252), STPSU-3521(254) & STPSU-3521(255) ,HOUSTON COUNTY

Contract Time: 45 Working Days

for constructing the Resurfacing and Traffic Stripe on Ashford Road from the junction of Enon Road to the junction of Ben Ivey Road northeast of Avon (Site 1); on Roney Road from the junction of SR-1 (US-431) to the junction of Walden Drive north of Dothan (Site 2); on Cowarts Creek/South Broad Street from the junction of Lucy Grade Road to the intersection of SR-12 (US-84) northwest of Avon (Site 3); on Bethel Road from the junction of CR-41 (Broad Street) to the junction of SR-1 (US-431) north of Dothan (Site 4); and on Hosea Road from the Geneva County Line to the junction of SR-605 (Brannon Stand) south of Taylor (Site 5). Length 8.804 mi.

The Bracket Estimate on this project is from $2,138,321 to $2,613,503 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


39.STPSU-5220(252) ,MORGAN COUNTY

Contract Time: 100 Working Days

DBE Goal Percent:1.00

for constructing the Reconstruction (Grading, Pavement, and Traffic Stripe) on CR-684 (Church Street) from the junction of Somerville Road to the junction of Riverview Avenue in Decatur. Length 0.331 mi.

The Bracket Estimate on this project is from $1,494,358 to $1,826,438 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPSU-6321(254) ,TUSCALOOSA COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-84 (Charlie Shirley Road) from the junction of SR-69 to the junction of SR-13 (US-43) northeast of Northport. Length 2.394 mi.

The Bracket Estimate on this project is from $1,175,784 to $1,437,070 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


43.ATRP2-29-2020-208 ,FAYETTE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Roadway and Intersection Improvements (Grading, Drainage, Pavement, Widening, Pedestrian Sidewalk, Traffic Signs, and Traffic Stripe) on SR-171 at SR-18 in Fayette. Length 0.071 mi.

The Bracket Estimate on this project is from $758,003 to $926,448 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $18.00 per set.

***ALL BIDS REJECTED***
 

Return To: Proposal Letting List (Top of web page)


44.ATRP2-41-2022-456 ,LEE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:1.00

for the constructing the Intersection Improvements to include Right Turn Lane Installation and Traffic Signal Upgrades on CR-248 (Summerville Road) at SR-1 (US-280) in Smiths Station. Length 0.103 mi.

The Bracket Estimate on this project is from $332,968 to $406,961 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


45.ATRP2-47-2021-255 ,MARION COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:1.00

for constructing the Intersection and Drainage Improvements (Shoulder Widening, Micro-Milling, Resurfacing, and Traffic Stripe) on SR-253 at Old Hackleburg Road in Hackleburg. Length 0.146 mi.

The Bracket Estimate on this project is from $380,359 to $464,884 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $13.00 per set.

***ALL BIDS REJECTED***

Return To: Proposal Letting List (Top of web page)


51.RACR-041-014-001 ,LEE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:1.00

for constructing the Roadway Improvements (Concrete Paving and Traffic Stripe) on SR-14 at the Quarry Entrance at approximately MP 210.290 northeast of Notasulga. Length 0.278 mi.

The Bracket Estimate on this project is from $1,607,058 to $1,964,182 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


54.RAED-031-052-006 ,GENEVA COUNTY

Contract Time: 90 Working Days

for constructing the Demolition and Structure Removal on SR-52 from east of the junction of Cox Street (MP 48.856) in Slocomb to east the junction of Firecracker Road (MP 51.943) in Malvern. Length 3.087 mi.

The Bracket Estimate on this project is from $456,223 to $557,606 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $24.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


57.RACR-002-000-015 ,BALDWIN COUNTY

Contract Time: January 1, 2026 Completion Date

for constructing the Connector Road (Grading, Drainage, Pavement, Bridge, Fence Installation, Traffic Lighting, and Traffic Stripe) on SR-161 from the junction SR-180 to a point north of the junction of CR-4 (Cotton Creek Drive) in Gulf Shores. Length 1.078 mi.

The Bracket Estimate on this project is from $49,413,513 to $60,040,075 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $96.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


60.99-406-062-110-201 ,BULLOCK COUNTY

Contract Time: 30 Working Days

for the constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on SR-110 from the Montgomery County Line to a point 0.400 mile east of the junction of CR-7. Length 10.532 mi.

The Bracket Estimate on this project is from $1,479,308 to $1,808,043 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)