Office Engineer

Proposal Letting List
December 08, 2023, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. IM-I065(530), ETC., BUTLER 4. HRRR-4523(250), MADISON
7. HSIP-0003(642), BALDWIN 11. IM-I065(535), JEFFERSON
14. NH-0001(631), RUSSELL 15. NH-0001(632), MADISON
16. NH-0006(592), PICKENS 17. NH-0008(609), SUMTER
18. NH-0009(592), ETC., MONTGOMERY 20. NH-0012(582), CHOCTAW
21. NH-0012(583), CLARKE 22. NH-0013(637), TUSCALOOSA
23. NH-0042(546), BALDWIN 24. NH-0067(511), MORGAN
25. NH-I065(542), ELMORE 28. STPAA-0007(561), DEKALB
29. STPAA-0015(546), MACON 30. STPAA-0025(568), BIBB
31. STPAA-0041(525), DALLAS 32. STPAA-0055(520), ETC., COVINGTON
33. STPAA-0069(571), WALKER 34. STPAA-0069(572), MARSHALL
35. STPAA-0069(574), CULLMAN 36. STPAA-0178(501), CLARKE
37. STPAA-HSIP-0217(504), MOBILE 40. STPAA-HSIP-0049(516), TALLAPOOSA
41. STPAA-HSIP-0051(522), DALE 42. STPAA-HSIP-0187(502), MARION
44. STPAA-NR13(909), JEFFERSON 47. STPMN-2623(251), ELMORE
50. STPSU-1720(252), COLBERT 53. ATRP2-38-2022-465, LAMAR
***59. ST-002-000-021, BALDWIN
***WITHDRAWN FROM LETTING

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.IM-I065(530) & IM-I065(531) ,BUTLER COUNTY

Contract Time: 255 Working Days

DBE Goal Percent:3.00

for constructing the Rest Area (Southbound Roadway) on I-65 near Greenville. Length 0.797 mi.

The Bracket Estimate on this project is from $9,425,040 to $11,519,494 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $79.00 per set.

A MANDATORY pre-bid conference is scheduled for 1:30 p.m. on Tuesday, November 28, 2023, at the Alabama Department of Transportation, Southeast Region (Montgomery Area Office); 1525 Coliseum Boulevard; Montgomery, AL 36110. Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

View Items

Return To: Proposal Letting List (Top of web page)


4.HRRR-4523(250) ,MADISON COUNTY

Contract Time: 30 Working Days

for constructing the Guardrail and Guardrail End Anchor Installations on Elkwood Section Road over the Brier Fork Flint River (Site 1) and on Pulaski Pike over Beaverdam Creek (Site 2). Length 0.173 mi.

The Bracket Estimate on this project is from $319,876 to $390,960 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


7.HSIP-0003(642) ,BALDWIN COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:2.00

for constructing the Widening (Grading, Drainage, Pavement, and Traffic Stripe) for the Center Turn Lane Addition on SR-3 (US-31) from the junction of Old Highway 31 to 0.265 mile east of the junction of Coleman Lane. Length 0.800 mi.

The Bracket Estimate on this project is from $1,435,974 to $1,755,080 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


11.IM-I065(535) ,JEFFERSON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:4.00

for constructing the Concrete Pavement Rehabilitation, Resurfacing, and Traffic Stripe on I-65 from the 16th Street North Overpass (MP 261.380) to the Daniel Payne Drive Underpass (MP 263.492) in Birmingham. Length 2.112 mi.

The Bracket Estimate on this project is from $5,817,393 to $7,110,147 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.NH-0001(631) ,RUSSELL COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:0.50

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-1 (US-431) from the junction of Old Seale Highway (MP 95.619) to the junction of Magnolia Greene Highway (MP 101.378). Length 5.758 mi.

The Bracket Estimate on this project is from $3,651,909 to $4,463,444 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.NH-0001(632) ,MADISON COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-1 (US-231/US-431) from the junction of Walker Lane in Hazel Green to the Tennessee State Line. Length 6.209 mi.

The Bracket Estimate on this project is from $3,281,954 to $4,011,277 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


16.NH-0006(592) ,PICKENS COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-6 (US-82) from 1 mile east of the West City Limits of Reform (MP 16.810) to the junction of 4th Avenue Southeast in Reform. Length 1.751 mi.

The Bracket Estimate on this project is from $1,297,460 to $1,585,784 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


17.NH-0008(609) ,SUMTER COUNTY

Contract Time: 110 Working Days

DBE Goal Percent:0.50

for constructing the Planing, Micro-Milling, Resurfacing, Bituminous Treatment G, and Traffic Stripe on SR-8 (US-80) to include the SR-17/SR-8 Ramps at the SR-17 Interchange southeast of York to 0.750 mile west of Pine Street Northeast. Length 6.659 mi.

The Bracket Estimate on this project is from $5,555,938 to $6,790,591 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $10.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


18.NH-0009(592) & HSIP-0009(589) ,MONTGOMERY COUNTY

Contract Time: 140 Working Days

DBE Goal Percent:5.00

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-9 (US-231) from the I-85 Interchange to the junction of SR-21 (US-231) to include Intersection Modifications with Traffic Signal Upgrades from the junction of Twain Curve to the junction of Lagoon Business Loop in Montgomery. Length 5.351 mi.

The Bracket Estimate on this project is from $4,075,326 to $4,980,953 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $28.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


20.NH-0012(582) ,CHOCTAW COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:1.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-12 (US-84) from the Mississippi State Line to the intersection of SR-17 in Silas. Length 8.542 mi.

The Bracket Estimate on this project is from $1,980,800 to $2,420,978 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


21.NH-0012(583) ,CLARKE COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:1.50

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-12 (US-84) from 0.340 mile west of the junction of CR-22 (MP 40.320) to the intersection of SR-295 (MP 543.061) in Grove Hill. Length 2.740 mi.

The Bracket Estimate on this project is from $2,102,587 to $2,569,829 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.NH-0013(637) ,TUSCALOOSA COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-13 (US-43) from 0.270 mile south of the intersection of Northside Road to the Fayette County Line. Length 8.538 mi.

The Bracket Estimate on this project is from $3,184,798 to $3,892,531 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


23.NH-0042(546) ,BALDWIN COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe on SR-42 (US-98) from 0.460 mile south of the intersection of CR-32 to the junction of CR-11 in Barnwell. Length 3.034 mi.

The Bracket Estimate on this project is from $989,630 to $1,209,548 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


24.NH-0067(511) ,MORGAN COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-67 from 0.610 mile south of the junction of Crawford Road (MP 15.157) to 0.380 mile south of the junction of Pines Road (MP 19.600) northeast of Eva. Length 4.441 mi.

The Bracket Estimate on this project is from $1,208,606 to $1,477,186 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $2.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.NH-I065(542) ,ELMORE AND AUTAUGA COUNTIES

Contract Time: 40 Working Days

DBE Goal Percent:1.00

for constructing the Roadway Improvements (Northbound Acceleration Lane Extension) on I-65 at the SR-14 Interchange (Exit 181) for 2400'. Length 0.454 mi.

The Bracket Estimate on this project is from $597,516 to $730,298 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $16.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.STPAA-0007(561) ,DEKALB COUNTY

Contract Time: 40 Working Days

DBE Goal Percent:8.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-7 (US-11) from the Etowah County Line to the junction of Lykes Lane in Collinsville. Length 7.109 mi.

The Bracket Estimate on this project is from $1,554,694 to $1,900,181 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.STPAA-0015(546) ,MACON COUNTY

Contract Time: 30 Working Days

for constructing the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and III), and Traffic Stripe on SR-15 (US-29) from the junction of SR-186 northeast of Tuskegee to the Lee County Line. Length 4.236 mi.

The Bracket Estimate on this project is from $833,541 to $1,018,773 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


30.STPAA-0025(568) ,BIBB COUNTY

Contract Time: 35 Working Days

for constructing the Resurfacing (Micro-Surfacing Seal Coat, Type II & III) and Traffic Stripe on SR-25 from the Hale County Line to the junction of SR-5 southwest of Brent. Length 13.912 mi.

The Bracket Estimate on this project is from $1,772,011 to $2,165,971 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


31.STPAA-0041(525) ,DALLAS COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:2.00

for constructing the Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-41 from the Wilcox County Line to the junction of SR-89 (MP 105.179). Length 8.936 mi.

The Bracket Estimate on this project is from $2,372,740 to $2,900,016 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.STPAA-0055(520), HSIP-0055(521) & STPAA-HSIP-0055(519) ,COVINGTON, CONECUH, AND BUTLER COUNTIES

Contract Time: 180 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, Intersection Improvements, and Traffic Stripe on SR-55 from the junction of SR-12 in River Falls to the Butler County Line to include Centerline Scoring from the Conecuh County Line to a point south of the CSX Railroad Bridge (MP 56.070) in Georgiana. Length 21.191 mi.

The Bracket Estimate on this project is from $10,484,543 to $12,814,441 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $26.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


33.STPAA-0069(571) ,WALKER COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, and Traffic Stripe on SR-69 from the junction of SR-5 in Jasper to the north end of the Blackwater Creek Bridge (MP 213.011). Length 5.725 mi.

The Bracket Estimate on this project is from $3,001,922 to $3,669,016 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


34.STPAA-0069(572) ,MARSHALL COUNTY

Contract Time: 80 Working Days

DBE Goal Percent:4.00

for constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-69 from the junction of Holbrook Drive northeast of Arab to the junction of Nuel Road in Guntersville. Length 4.999 mi.

The Bracket Estimate on this project is from $5,030,219 to $6,148,046 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.STPAA-0069(574) ,CULLMAN COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-69 from the I-65 Interchange in Good Hope to the junction of SR-3 (US-31) in Cullman. Length 3.639 mi.

The Bracket Estimate on this project is from $2,322,975 to $2,839,192 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPAA-0178(501) ,CLARKE COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-178 from the junction of SR-13 (US-43) to the junction of CR-27 (West Main Street) in Fulton. Length 1.905 mi.

The Bracket Estimate on this project is from $610,454 to $746,111 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-HSIP-0217(504) ,MOBILE COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:1.00

for constructing the Planing, Resurfacing, Traffic Signal Upgrades, and Traffic Stripe on SR-217 from the intersection of SR-17 (US-45) to the junction of Lakeview Ridge Lane south of Georgetown. Length 12.069 mi.

The Bracket Estimate on this project is from $3,546,769 to $4,334,940 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $12.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


40.STPAA-HSIP-0049(516) ,TALLAPOOSA COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:1.50

for constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, and Traffic Stripe on SR-49 from the junction of CR-57 to the junction of SR-22 in New Site. Length 7.664 mi.

The Bracket Estimate on this project is from $2,491,603 to $3,045,293 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


41.STPAA-HSIP-0051(522) ,DALE COUNTY

Contract Time: 55 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-51 from the junction of SR-53 (US-231) southwest of Ariton to the Barbour County Line. Length 5.792 mi.

The Bracket Estimate on this project is from $2,113,853 to $2,583,598 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPAA-HSIP-0187(502) ,MARION COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-187 from the junction of SR-17 (US-43) northeast of Hamilton to the junction of CR-29. Length 4.258 mi.

The Bracket Estimate on this project is from $1,953,768 to $2,387,939 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


44.STPAA-NR13(909) ,JEFFERSON AND SHELBY COUNTIES

Contract Time: 90 Working Days

DBE Goal Percent:0.50

for constructing the Safety Improvements (Curb Ramp Installations) on SR-3, SR-4, SR-5, SR-7, SR-25, SR-75, SR-79, SR-119, SR-149, SR-155, SR-261, SR-269, and SR-378 at various locations in the East Central Region (Birmingham Area) as indicated in the plans.

The Bracket Estimate on this project is from $440,608 to $538,520 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $15.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


47.STPMN-2623(251) ,ELMORE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:0.50

for constructing the Planing, Resurfacing, and Traffic Stripe on North Bridge Street from the junction of West Bridge Street to the junction of West Micanopy Street (Site 1) and on West Osceola Street from the junction of SR-14 (Coosa River Parkway) to the junction of North Bridge Street (Site 2) in Wetumpka. Length 1.458 mi.

The Bracket Estimate on this project is from $299,608 to $366,187 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


50.STPSU-1720(252) ,COLBERT COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:0.50

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-40 (River Road) from the junction of Brick School Road northeast of Muscle Shoals to the junction of Foster Mill Road and along CR-40 (Foster Mill Road) to the Lawrence County Line (Site 1) and on CR-48 (Lime Kiln Road) from the junction of CR-40 (River Road) to the junction of Lime Kiln Hollow Drive (Site 2). Length 7.266 mi.

The Bracket Estimate on this project is from $1,435,754 to $1,754,811 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.ATRP2-38-2022-465 ,LAMAR COUNTY

Contract Time: 55 Working Days

for constructing the Drainage Improvements (Grading, Drainage, and Pavement), Driveway Replacement, and Sidewalk Installation on SR-118 (US-278/Main Street) from the junction of Elm Street to a point near Outfall Ditch in Sulligent. Length 0.069 mi.

The Bracket Estimate on this project is from $447,058 to $546,405 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


59.ST-002-000-021 ,BALDWIN COUNTY

Contract Time: 45 Working Days

for constructing the Demolition and Structure Removal on the Future SR-161 Connector from the junction of CR-4 (Cotton Creek Road) to the junction of the Foley Beach Express in Gulf Shores.

The Bracket Estimate on this project is from $248,512 to $303,737 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $8.00 per set.

***WITHDRAWN FROM THE LETTING***