January 26, 2024, Transportation Letting

Welcome to the Proposal Letting List Page. You may view the approximate items of work with each proposal as a "printer friendly" page by clicking on the View Items hyperlink. Adobe Acrobat Reader will now be required to view the "View Items" pages. Please e-mail us with your comments.

Note: Adobe Acrobat Reader is now required to view the Proposal Item Summary pages.

1. BR-0079(500), BLOUNT *4. HPP-TAPBH-CMAQ-A104(916), JEFFERSON
*10. NH-0001(629), HOUSTON 11. NH-0002(604), LIMESTONE
12. NH-0009(593), MONTGOMERY 13. NH-0020(533), LAWRENCE
14. NH-0021(578), COOSA 15. NH-0035(538), CHEROKEE
19. NH-FMGR-HSIP-0008(610), MARENGO 22. NH-HSIP-0016(536), MOBILE
25. STPAA-0015(542), PIKE 26. STPAA-0041(526), CONECUH
27. STPAA-HSIP-0048(507), RANDOLPH 28. STPAA-0071(503), JACKSON
29. STPAA-0110(507), BULLOCK 32. STPAA-FMGR-0010(564), BARBOUR
35. STPAA-HSIP-0014(557), ELMORE 36. STPAA-HSIP-0017(592), LAMAR
37. STPAA-HSIP-0034(503), TALLADEGA 38. STPAA-HSIP-0052(521), GENEVA
42. STPSU-0819(255), CALHOUN 48. ATRP2-01-2023-001, AUTAUGA
52. RAED-031-052-003, ETC., GENEVA 53. 99-510-479-622-206, ETC., MARION
* - WITHDRAWN FROM THE PROJECT

The Bracket Ranges shown herein are to provide general financial information to Contractors and Bonding Companies concerning a Project's complexity and size. THESE BRACKETS SHOULD NOT BE USED IN PREPARING A BID, NOR WILL THESE BRACKETS HAVE ANY BEARING ON THE DECISION TO AWARD ANY CONTRACT.


1.BR-0079(500) ,BLOUNT COUNTY

Contract Time: 255 Working Days

DBE Goal Percent:3.00

for constructing the Bridge Replacement and Approaches (Grading, Drainage, Pavement, and Bridge) on SR-79 over Blackburn Fork of the Little Warrior River northeast of Locust Fork. Length 0.870 mi.

The Bracket Estimate on this project is from $11,153,641 to $13,632,227 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $59.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


4.HPP-TAPBH-CMAQ-A104(916) ,JEFFERSON COUNTY

Contract Time: 300 Working Days

DBE Goal Percent:5.00

for constructing the Pedestrian Bridge and Sidewalks over SR-3 (US-31) near Wald Park in Vestavia Hills. Length 0.104 mi.

The Bracket Estimate on this project is from $3,251,972 to $3,974,633 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $34.00 per set.

A MANDATORY pre-bid conference is scheduled for 10:00 a.m. on Tuesday, January 16, 2024, at the Alabama Department of Transportation; East Central Region Office; 100 Corporate Parkway; Suite 450, Hoover, AL 35242 Any qualified bidder wishing to bid this proposal is required to have a company representative present at this MANDATORY pre-bid conference. Proposals issued to bidders who fail to attend the MANDATORY pre-bid conference and/or register their attendance will be voided and their bids will not be received nor considered.

***WITHDRAWN FROM THE LETTING***

Return To: Proposal Letting List (Top of web page)


10.NH-0001(629) ,HOUSTON COUNTY

Contract Time: 75 Working Days

DBE Goal Percent:2.00

for constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Signals) on SR-1 (US-231) at SR-210 (Ross Clark Circle) in Dothan. Length 0.933 mi.

The Bracket Estimate on this project is from $2,483,831 to $3,035,794 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $36.00 per set.

***WITHDRAWN FROM THE LETTING***
 

Return To: Proposal Letting List (Top of web page)


11.NH-0002(604) ,LIMESTONE COUNTY

Contract Time: 60 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-2 (US-72) from the intersection of Shaw Road to the junction of York Lane west of Athens. Length 5.989 mi.

The Bracket Estimate on this project is from $2,703,880 to $3,304,743 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $3.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


12.NH-0009(593) ,MONTGOMERY COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:2.00

for constructing the Resurfacing (Scrub Seal and Micro-Surfacing Seal Coat, Type II) and Traffic Stripe on SR-9 (US-331) from 0.500 mile south of the intersection of CR-24 to 0.400 mile south of the junction of CR-61 southeast of Hope Hull. Length 6.076 mi.

The Bracket Estimate on this project is from $3,276,370 to $4,004,452 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


13.NH-0020(533) ,LAWRENCE COUNTY

Contract Time: 50 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-20 from the Colbert County Line to the junction of CR-585 west of Courtland. Length 5.157 mi.

The Bracket Estimate on this project is from $2,483,164 to $3,034,978 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


14.NH-0021(578) ,COOSA COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-21 (US-231) in Rockford from 0.560 mile south of the intersection of SR-22 to the junction of CR-59 north of Rockford. Length 3.316 mi.

The Bracket Estimate on this project is from $1,533,485 to $1,874,259 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $9.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


15.NH-0035(538) ,CHEROKEE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-35 from the junction of SR-273 to the DeKalb County Line. Length 2.999 mi.

The Bracket Estimate on this project is from $939,958 to $1,148,837 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


19.NH-FMGR-HSIP-0008(610) ,MARENGO COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:6.00

for constructing the Planing, Resurfacing, Guardrail Installation, Steel Blockout Replacement, and Traffic Stripe on SR-8 (US-80) from the junction of Lee Avenue to the Hale County Line. Length 4.849 mi.

The Bracket Estimate on this project is from $2,638,892 to $3,225,312 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


22.NH-HSIP-0016(536) ,MOBILE COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:3.00

for constructing the Planing, Resurfacing, Guardrail Installation, Traffic Signal Upgrades, and Traffic Stripe on SR-16 (US-90) from the east abutment of the Fowl River Bridge to the Halls Mill Creek Bridge in Tillmans Corner. Length 6.277 mi.

The Bracket Estimate on this project is from $4,484,880 to $5,481,520 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


25.STPAA-0015(542) ,PIKE COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:0.50

for constructing the Planing, Resurfacing, and Traffic Stripe on SR-15 (US-29) from a point north of the SR-53 (US-231) Overpass (MP 102.236) to the junction of Needmore Road in Troy. Length 3.421 mi.

The Bracket Estimate on this project is from $1,272,145 to $1,554,844 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


26.STPAA-0041(526) ,CONECUH COUNTY

Contract Time: December 31, 2024 Completion Date

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-41 from the I-65 Interchange (MP 24.529) to the junction of SR-12 (US-84) in Repton. Length 10.352 mi.

The Bracket Estimate on this project is from $1,910,085 to $2,334,548 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


27.STPAA-HSIP-0048(507) ,RANDOLPH COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-48 from 0.280 mile west of the junction of CR-531 (MP 24.961) to the Georgia State Line. Length 9.360 mi.

The Bracket Estimate on this project is from $4,231,672 to $5,172,043 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


28.STPAA-0071(503) ,JACKSON COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:6.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-71 from the junction of SR-35 in Section to the junction of CR-378 northeast of Dutton. Length 7.305 mi.

The Bracket Estimate on this project is from $2,119,283 to $2,590,234 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $6.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


29.STPAA-0110(507) ,BULLOCK COUNTY

Contract Time: 30 Working Days

DBE Goal Percent:0.50

for constructing the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and Traffic Stripe on SR-110 from 0.400 mile east of the junction of CR-7 in Fitzpatrick to the junction of SR-6 (US-82) west of Union Springs. Length 7.601 mi.

The Bracket Estimate on this project is from $1,312,654 to $1,604,355 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


32.STPAA-FMGR-0010(564) ,BARBOUR AND HENRY COUNTIES

Contract Time: 75 Working Days

DBE Goal Percent:5.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-10 from the junction of CR-41 (Blue Springs Town Limits) to 0.630 mile northwest of the junction of CR-25. Length 10.869 mi.

The Bracket Estimate on this project is from $3,284,687 to $4,014,618 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


35.STPAA-HSIP-0014(557) ,ELMORE COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:4.00

for constructing the Resurfacing (Micro-Surfacing Seal Coat, Type II) and Traffic Stripe on SR-14 from the junction of SR-63 to the junction of SR-229 in Tallassee to include Traffic Sign Improvements at the intersection of CR-155 (Cherokee Trail). Length 8.026 mi.

The Bracket Estimate on this project is from $1,211,606 to $1,480,851 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $5.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


36.STPAA-HSIP-0017(592) ,LAMAR COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:3.00

for constructing the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-17 from the junction of Old Reform Road to the junction of CR-9 in Vernon. Length 3.121 mi.

The Bracket Estimate on this project is from $2,893,596 to $3,536,618 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


37.STPAA-HSIP-0034(503) ,TALLADEGA COUNTY

Contract Time: 65 Working Days

DBE Goal Percent:2.00

for constructing the Micro-Milling, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-34 from the St. Clair County Line to the junction of SR-77 north of Talladega. Length 8.241 mi.

The Bracket Estimate on this project is from $3,229,685 to $3,947,392 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


38.STPAA-HSIP-0052(521) ,GENEVA COUNTY

Contract Time: 70 Working Days

DBE Goal Percent:2.00

for constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-52 from the intersection of Line Street in Samson to the junction of SR-196 in Geneva. Length 10.060 mi.

The Bracket Estimate on this project is from $3,451,649 to $4,218,682 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $7.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


42.STPSU-0819(255) ,CALHOUN COUNTY

Contract Time: 35 Working Days

DBE Goal Percent:3.00

for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on George Douthit Drive Southwest from the junction of Brierwood Place Southwest to the intersection of SR-21 in Jacksonville. Length 1.108 mi.

The Bracket Estimate on this project is from $494,133 to $603,941 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


48.ATRP2-01-2023-001 ,AUTAUGA COUNTY

Contract Time: 45 Working Days

DBE Goal Percent:1.00

for constructing the Intersection Improvements (Two-Way Left Turn Lane Addition, Grading, Drainage, Pavement, Widening, and Traffic Stripe) on SR-6 (US-82) between CR-1 and CR-37 southwest of Billingsley. Length 0.416 mi.

The Bracket Estimate on this project is from $1,010,366 to $1,234,892 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $21.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


52.RAED-031-052-003 & RAED-031-052-005 ,GENEVA COUNTY

Contract Time: 550 Working Days

DBE Goal Percent:1.00

for constructing the Additional Lanes and Route Relocation (Grading, Drainage, Pavement, and Bridge Culvert Extension) on SR-52 from a point east of Cox Street (MP 8.856) in Slocomb to the junction of Scott Road in Malvern. Length 3.408 mi.

The Bracket Estimate on this project is from $28,233,167 to $34,507,204 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $168.00 per set.

View Items

Return To: Proposal Letting List (Top of web page)


53.99-510-479-622-206 & 99-510-479-622-207 ,MARION COUNTY

Contract Time: 65 Working Days

for the Maintenance Bridge Painting on I-22 under CR-13 (MP 2.479); on I-22 under CR-33 (MP 3.940); on I-22 under CR-11 (MP 4.750); and on I-22 under CR-9 (MP 6.250) west of Hamilton.

The Bracket Estimate on this project is from $389,385 to $475,915 .

A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $11.00 per set.

View Items